DRAINAGE AND EROSION CONTROL WORKS. (1) The Owner shall convey to the Town any necessary easements required for the drainage and erosion control works described in Schedule “G”. (2) Where an existing watercourse is diverted, regraded, bridged or culverted, the Owner will indemnify the Town and save it harmless from all claims for damages through flooding resulting from the work until the roads and services in the plan have been assumed by the Town. (3) No building permit shall be granted for a lot abutting on any such diversion, regrading, bridging or culverting or through which it passes until all work is completed to the satisfaction of the Engineer. (4) All ditches shall be sodded from top of slope to top of slope and between the top of the slope of the ditch and the lot line.
Appears in 4 contracts
Samples: Development Agreement, Industrial Subdivision Agreement, Residential Subdivision Agreement
DRAINAGE AND EROSION CONTROL WORKS. (1) The Owner shall convey to the Town any necessary easements required for the drainage and erosion control works described in Schedule “G”.
(2) Where an existing watercourse is diverted, regraded, bridged or culverted, the Owner will indemnify the Town and save Save it harmless from all claims for damages through flooding resulting from the work until the roads and services in the plan have been assumed by the Town.
(3) No building permit shall be granted for a lot abutting on any such diversion, regrading, bridging or culverting or through which it passes until all work is completed to the satisfaction of the Engineer.
(4) All ditches shall be sodded from top of slope to top of slope and between the top of the slope of the ditch and the lot line.
Appears in 1 contract
Samples: Residential Subdivision Agreement