ECM Installations Clause Samples

ECM Installations. (a) To the extent applicable, preliminary design documents consisting of design criteria, preliminary design drawings, outlining specifications and other documents to fix and describe the size, quality and character of the ECM Installations, their architectural, structural, mechanical and electrical systems, and the materials and other elements of the ECM Installations as may be appropriate. (b) To the extent applicable, construction documents including technical drawings, schedules, diagrams and specifications, job books containing calculations used in the final design, but excluding shop drawings, setting forth in detail the requirements for construction of the ECM Installations that— (i) establish the scope of the ECM Installations in greater detail; (ii) provide information necessary for the use of those in the building trades; and (iii) include documents necessary for regulatory agency approval. (c) A Commissioning and Test Plan setting forth the commissioning procedures and applicable acceptance tests for all ECMs consistent with the requirements of Schedule D (Construction Unit Commissioning and Performance Testing; Operating Parameters of ECMs; Manufacturers Warranties). The commissioning procedures must, at a minimum, comply with equipment manufacturers’ warranty requirements. (d) To the extent applicable, record or as-built drawings showing significant changes made during construction, submitted on a gold disc and formatted as required by the Delaware State Archives.