Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months prior to the date that such Lender, as the case may be, notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 3 contracts
Samples: Assignment and Assumption (Ultra Petroleum Corp), Senior Secured Term Loan Agreement (Ultra Petroleum Corp), Senior Secured Term Loan Agreement (Ultra Petroleum Corp)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 180 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 180-day period referred to above shall be extended to include the period of retroactive effect thereof. No Lender may make any demand pursuant to this Section 5.01 more than 180 days after the Maturity Date.
Appears in 2 contracts
Samples: Term Loan Agreement (Linn Midwest Energy LLC), Lien Term Loan Agreement (Linn Energy, LLC)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s 's right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 180 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s 's intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 180-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 2 contracts
Samples: Term Loan Agreement (Petrohawk Energy Corp), Term Loan Agreement (Petrohawk Energy Corp)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 5.01(d) for any increased costs or reductions incurred more than six months 180 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 180-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 2 contracts
Samples: Second Lien Credit Agreement (Kodiak Oil & Gas Corp), Second Lien Credit Agreement (Kodiak Oil & Gas Corp)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six nine months prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six nine month period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 2 contracts
Samples: Senior Secured Term (Rice Energy Inc.), Dip Credit Agreement
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs incurred or reductions incurred suffered more than six months 180 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 180-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 2 contracts
Samples: Credit Agreement (Miller Energy Resources, Inc.), Credit Agreement (Miller Energy Resources, Inc.)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s 's right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 365 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s 's intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 365-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 2 contracts
Samples: Credit Agreement (Callon Petroleum Co), Credit Agreement (Trans Energy Inc)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs incurred or reductions incurred suffered more than six months 365 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further provided, further, that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 365-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 2 contracts
Samples: Term Loan Credit Agreement, Term Loan Credit Agreement (Southcross Energy Partners, L.P.)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 90 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 90-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 2 contracts
Samples: Credit Agreement (Magnum Hunter Resources Corp), Credit Agreement (Magnum Hunter Resources Corp)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 5.1 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 5.1 for any increased costs or reductions incurred more than six months 180 days prior to the date that such Lender, as the case may be, notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 180-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 2 contracts
Samples: Credit Agreement (Resaca Exploitation, Inc.), Credit Agreement (Resaca Exploitation, Inc.)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 365 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further thatprovided, further, that if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 365-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 2 contracts
Samples: Senior Secured First Lien Term Loan Credit Agreement (Clean Energy Fuels Corp.), Senior Secured First Lien Term Loan Credit Agreement (Clean Energy Fuels Corp.)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 270 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further provided, further, that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 270-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 1 contract
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 180 days prior to the date that such Lender, as the case may be, notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 180-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 1 contract
Samples: Term Loan Credit Agreement (Northern Oil & Gas, Inc.)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 180 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 180- day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 1 contract
Samples: Petition Superpriority Loan Agreement (Dune Energy Inc)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 180 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided provided, further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 180-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 1 contract
Samples: Day Bridge Term Loan Agreement (Sitio Royalties Corp.)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 180 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; and provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 180-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 1 contract
Samples: Credit Agreement (Forest Oil Corp)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 2.10 shall not constitute a waiver of such the Lender’s right to demand such compensation; provided provided, however, that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 2.10 for any increased costs or reductions incurred more than six months one year prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such the increased costs or reductions and of such the Lender’s intention to claim compensation therefor; provided further therefor (except that, if the Change in Law giving rise to such the increased costs or reductions is retroactive, then the six month one-year period referred to above shall be extended to include the period of retroactive effect thereofeffect).
Appears in 1 contract
Samples: Senior Secured Superpriority Postpetition Credit Agreement
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower Loan Parties shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months one hundred eighty (180) days prior to the date that such Lender, as the case may be, notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month one hundred eighty (180) day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 1 contract
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 9.1 shall not constitute a waiver of such Lender’s 's right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 9.1 for any increased costs or reductions incurred more than six months 365 days prior to the date that such Lender, as the case may be, notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s 's intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 365-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 1 contract
Samples: Iv Term Loan Agreement (Global Geophysical Services Inc)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 365 days prior to the date that such Lender, as the case may be, notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s 's intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 365-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 1 contract
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower Borrowers shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months ninety (90) days prior to the date that such Lender, as the case may be, Lender notifies the Borrower Borrowers of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 90-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 1 contract
Samples: Second Lien Term Credit Agreement (Sanchez Energy Corp)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 270 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month such period referred to above of retroactivity shall be extended added to include such 270 day period for the period purpose of retroactive effect thereofdetermining the earliest such cost or reduction which may be compensated.
Appears in 1 contract
Samples: Term Loan Agreement (Vanguard Natural Resources, LLC)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 180 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 365-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 1 contract
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 180 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 180-day period referred to above shall be extended to include the period of retroactive effect thereof. [Reserved] .
Appears in 1 contract
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 180 days prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 1-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 1 contract
Samples: Senior Secured Credit Agreement (Phoenix Capital Group Holdings, LLC)
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower Borrowers shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months one hundred eighty (180) days prior to the date that such Lender, as the case may be, Lender notifies the Borrower Borrowers of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 180-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 1 contract
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 2.12 shall not constitute a waiver of such that Lender’s right to demand such compensation; provided provided, however, that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 2.12 for any increased costs or reductions incurred more than six months one year prior to the date that such Lender, as the case may be, Lender notifies the Borrower of the Change in Law giving rise to such the increased costs or reductions and of such that Lender’s intention to claim compensation therefor; provided further therefor (except that, if the Change in Law giving rise to such the increased costs or reductions is retroactive, then the six month one-year period referred to above shall be extended to include the period of retroactive effect thereofeffect).
Appears in 1 contract
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 180 days prior to the date that such Lender, as the case may be, notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 180-day period referred to above shall be extended to include the period of retroactive effect thereof. No Lender may make any demand pursuant to this Section 5.01 more than 180 days after the Maturity Date.
Appears in 1 contract
Effect of Failure or Delay in Requesting Compensation. Failure or delay on the part of any Lender to demand compensation pursuant to this Section 5.01 shall not constitute a waiver of such Lender’s right to demand such compensation; provided that the Borrower shall not be required to compensate a Lender pursuant to this Section 5.01 for any increased costs or reductions incurred more than six months 365 days prior to the date that such Lender, as the case may be, notifies the Borrower of the Change in Law giving rise to such increased costs or reductions and of such Lender’s intention to claim compensation therefor; provided further that, if the Change in Law giving rise to such increased costs or reductions is retroactive, then the six month 365-day period referred to above shall be extended to include the period of retroactive effect thereof.
Appears in 1 contract
Samples: Senior Term Loan Agreement (McMoran Exploration Co /De/)