Electrical. 4.4.1. All lighting fixtures should be located and scheduled showing all types and quantities of fixtures to be used, including proposed lighting levels for each usable space. 4.4.2. All major electrical equipment should be scheduled indicating size and capacity. 4.4.3. Complete electrical distribution including a one line diagram indicating final location of switchboards, communications, controls (high and low voltage), motor control centers, panels, transformers and emergency generators, if required. Low voltage system includes fire alarm system, security system, clock and public address system, voice data system, and telecom/technology system. 4.4.4. Legend showing all symbols used on drawings. 4.4.5. More developed and detailed Outline Specifications indicating quality level and manufacture. 4.4.6. Further evaluation and confirmation of the load requirements of all equipment and systems, the impact of those on existing facilities, and the requirements to increase these loads to accommodate the increase.
Appears in 10 contracts
Samples: Architectural Services Agreement, Architectural Services Agreement, Architectural Services Agreement
Electrical. 4.4.13.5.1. All lighting fixtures should must be located and scheduled showing all types and quantities of fixtures to be used, including proposed lighting levels for each usable space.
4.4.23.5.2. All major electrical equipment should must be scheduled indicating size and capacity.
4.4.33.5.3. Complete electrical distribution including a one one-line diagram indicating final location of switchboards, communications, controls (high and low voltage), motor control centers, panels, transformers and emergency generators, if required. Low voltage system includes fire alarm system, security system, clock and public address system, voice data system, and telecom/technology system.
4.4.43.5.4. Legend showing all symbols used on drawings.
4.4.53.5.5. More developed and detailed Outline Specifications outline specifications indicating quality level and manufacture.
4.4.63.5.6. Further evaluation and confirmation of the load requirements of all equipment and systems, the impact of those on existing facilities, and the requirements to increase these loads to accommodate the increase.
Appears in 1 contract
Samples: Architectural Services Agreement
Electrical. 4.4.14.5.1. All lighting fixtures should must be located and scheduled showing all types and quantities of fixtures to be used, including proposed lighting levels for each usable space.
4.4.24.5.2. All major electrical equipment should must be scheduled indicating size and capacity.
4.4.34.5.3. Complete electrical distribution including a one one-line diagram indicating final location of switchboards, communications, controls (high and low voltage), motor control centers, panels, transformers and emergency generators, if required. Low voltage system includes fire alarm system, security system, clock and public address system, voice data system, and telecom/technology system.
4.4.44.5.4. Legend showing all symbols used on drawings.
4.4.54.5.5. More developed and detailed Outline Specifications outline specifications indicating quality level and manufacture.
4.4.64.5.6. Further evaluation and confirmation of the load requirements of all equipment and systems, the impact of those on existing facilities, and the requirements to increase these loads to accommodate the increase.
Appears in 1 contract
Samples: Architectural Services Agreement
Electrical. 4.4.14.5.1. All lighting fixtures should must be located and scheduled showing all types and quantities of fixtures to be used, including proposed lighting levels for each usable space.
4.4.24.5.2. All major electrical equipment should must be scheduled indicating size and capacity.
4.4.34.5.3. Complete electrical distribution including a one line one‐line diagram indicating final location of switchboards, communications, controls (high and low voltage), motor control centers, panels, transformers and emergency generators, if required. Low voltage system includes fire alarm system, security system, clock and public address system, voice data system, and telecom/technology system.
4.4.44.5.4. Legend showing all symbols used on drawings.
4.4.54.5.5. More developed and detailed Outline Specifications outline specifications indicating quality level and manufacture.
4.4.64.5.6. Further evaluation and confirmation of the load requirements of all equipment and systems, the impact of those on existing facilities, and the requirements to increase these loads to accommodate the increase.
Appears in 1 contract
Samples: Architectural Services Agreement