ELECTRICALS — DESIGN & INSTALLATION Clause Samples

ELECTRICALS — DESIGN & INSTALLATION. Electrical provisions from Powercor supply to processing plant including: Electricals: o New 22kV/11kV 3150kVA transformer and switchgear o 11kV supply to processing plant o 11kV/415V transformer and switchgear at processing plant o 415V power supply to tailings storage facility. Spinifex — Design Consultants advising (Rob Hills, J▇▇▇▇▇▇) • Water return from Treated Water Storage Facility to plant • Make up water supply to Treated Water Storage Facility • Tailings transfer pipeline from plant to tailings dissemination process • Integrate capital cost estimates for backfill plant and tailings management system prepared by backfill consultant and tailings consultant. • Tailings supply to surface located backfill plant if required Spinifex with BGF veto over site layout and design and with advise from design consultant (n) TAILING STORAGE FACILITY • BGF Responsibility Tailings Storage Facility: BGF (with design consultant) (o) COMMISSIONING Dry • Metallurgical Commissioning to be undertaken by Gekko with the assistance of Spinifex personnel Commissioning: Spinifex Wet Commissioning: • Dry Commissioning of Plant elements • Commissioning will include hire of necessary service equipment (eg. Loader to feed crusher bin), supply of additional commissioning labour and correction of any faults discovered during commissioning that would prevent the plant from operating to design specifications (unless faults are fabrication or plant design related). • Spinifex to assist in management of resources and timelines but not responsible for metallurgical outcomes • Handover and Sign off to BGF prior to wet commissioning Gekko responsible with support, project management & facilitation provided by Spinifex Spinifex responsible to ensure all required services available (p) Spinifex will have no involvement in gold security and will liaise with BGF to ensure that OH&S and Property related security issues are managed during construction. Construction Security: Spinifex Gold security — BGF (q) COMMERCIAL RELATIONSHIP B/N PARTIES Schedule of Rates * Payment terms (15 days from end month invoice) Cost plus on expenses Otherwise agreed in writing All major contracts to be direct between BGF and Contractors Appendix to be attached includes schedule of rates and payment terms