Common use of Engineering Change Proposals Clause in Contracts

Engineering Change Proposals. (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639D approved 7 April 2015, EIA-649-1 of Nov 2014 and MIL-HDBK-61A of 7 Feb 2001 apply. An ECP shall be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. The contractor shall develop documentation in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact if applicable, and consequences if disapproved. List all existing drawings and technical manuals impacted by the change, including a brief narrative explanation of needed changes to incorporate the ECP if approved. Provide weight and moment data incidental to the change, if applicable. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.

Appears in 22 contracts

Samples: imlive.s3.amazonaws.com, imlive.s3.amazonaws.com, imlive.s3.amazonaws.com

AutoNDA by SimpleDocs

Engineering Change Proposals. (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639D approved 7 April 2015, EIA-649-1 of Nov 2014 2015 and MIL-HDBK-61A HDBK- 61A of 7 Feb 2001 apply. An ECP shall should be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. The contractor Documentation shall develop documentation be developed in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact if applicableimpact, and consequences if disapproved. List all All existing drawings and technical manuals impacted by the change, including change shall be listed along with a brief narrative explanation of needed changes to incorporate the ECP if approved. Provide weight Weight and moment data incidental to the change, if applicablechange shall be provided. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.

Appears in 8 contracts

Samples: Solicitation, Offer and Award, imlive.s3.amazonaws.com, imlive.s3.amazonaws.com

AutoNDA by SimpleDocs

Engineering Change Proposals. (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639D approved 7 April 2015, EIA-649-1 of Nov 2014 and MIL-HDBK-61A of 7 Feb 2001 apply. An ECP shall be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. The contractor shall develop documentation in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact if applicable, and consequences if disapproved. List all existing drawings impacts to system engineering design considerations, integrated product support elements, and technical manuals product attributeexisting impacted by the change, including a brief narrative explanation of needed changes to incorporate the ECP if approved. Provide weight and moment data incidental to the change, if applicable. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.

Appears in 4 contracts

Samples: imlive.s3.amazonaws.com, imlive.s3.amazonaws.com, imlive.s3.amazonaws.com

Time is Money Join Law Insider Premium to draft better contracts faster.