Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities or the Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the Contractor's Activities or the Works. The plan prepared by the Contractor and finalised under clause 9.2, which must set out in adequate detail the procedures the Contractor will implement to manage the Contractor's Activities and the Works from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor personnel (including the Contractor's key people under clause 3.6(a)) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding the Environment during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.2; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the Contractor's Activities and the Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the Contractor's Activities and the Works); the procedure for ensuring subcontractor compliance with the Environmental Management Plan; the procedure for regular auditing or other monitoring of Contractor and subcontractor compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by the: Contract; or Contract Administrator.
Appears in 5 contracts
Samples: Head Contract, Early Contractor Involvement Head Contract, Head Contract
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities or the Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the Contractor's Activities or the Works. The plan prepared by the Contractor and finalised under clause 9.28.7, which must set out in adequate detail the procedures the Contractor will implement to manage the Contractor's Activities and the Works from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan (if any) must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor personnel (including the Contractor's key people under clause 3.6(a)2.3) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Contract AdministratorPDS Contractor, the Commonwealth and Other Contractors regarding the Environment during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan (if any) under clause 9.28.7; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the Contractor's Activities and the Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan (if any) under clause 9.2 8.7 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the Contractor's Activities and the Works); the procedure for ensuring subcontractor compliance with the Environmental Management PlanPlan (if any); the procedure for regular regularly auditing or other monitoring of Contractor and subcontractor compliance with the Environmental Management PlanPlan (if any), including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by theby: the Contract; or Contract Administratorthe PDS Contractor.
Appears in 3 contracts
Samples: Medium Works Contract, Medium Works Contract, Medium Works Contract
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities or the Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the Contractor's Activities or the Works. The plan prepared by the Contractor and finalised under clause 9.28.7, which must set out in adequate detail the procedures the Contractor will implement to manage the Contractor's Activities and the Works from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor personnel (including the Contractor's key people under clause 3.6(a)2.3) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding the Environment during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.28.7; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the Contractor's Activities and the Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 8.7 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the Contractor's Activities and the Works); the procedure for ensuring subcontractor compliance with the Environmental Management Plan; the procedure for regular auditing or other monitoring of Contractor and subcontractor compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by the: Contract; or Contract Administrator.
Appears in 2 contracts
Samples: Medium Works Contract, Medium Works Contract
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities or the Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the Contractor's Activities or the Works. The plan prepared by the Contractor and finalised under clause 9.2, which must set out in adequate detail the procedures the Contractor will implement to manage the Contractor's Activities and the Works from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx seek to maximise the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (ed), all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor personnel (including the Contractor's key people under clause 3.6(a)) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding the Environment during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.2; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the Contractor's Activities and the Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the Contractor's Activities and the Works); the procedure for ensuring subcontractor compliance with the Environmental Management Plan; the procedure for regular auditing or other monitoring of Contractor and subcontractor compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by the: Contract; or Contract Administrator.
Appears in 2 contracts
Samples: Early Contractor Involvement Head Contract, Head Contract
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities Subcontractor’s Activities, the Subcontract Works or the MCC Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the Contractor's Subcontractor’s Activities or the Subcontract Works. The plan prepared by the Contractor Subcontractor and finalised under clause 9.2, which must set out in adequate detail the procedures the Contractor Subcontractor will implement to manage the Contractor's Subcontractor’s Activities and the Subcontract Works from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must not be inconsistent with the Contractor’s Environmental Management Plan and must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the Contractor's Subcontractor’s key people under clause 3.6(a)) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding the Environment during the Contractor's Subcontractor’s Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.2; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the Contractor's Subcontractor’s Activities and the Subcontract Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Subcontractor’s Activities and the Subcontract Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the Contractor's Subcontractor’s Activities and the Subcontract Works); the procedure for ensuring subcontractor subsubcontractor compliance with the Environmental Management Plan; the procedure for regular auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Subcontractor’s Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by the: ContractSubcontract; or Contract AdministratorContractor’s Representative. The Environmental Objectives are: to encourage best practice environmental management through the planning, development, implementation and continuous improvement of environmental management procedures during the Subcontractor’s Activities and the Subcontract Works; to prevent and minimise adverse impacts on the Environment; to recognise and protect any special environmental characteristics of the Site (including cultural heritage significance); and the additional objectives specified in the Subcontract Particulars.
Appears in 2 contracts
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities Services or the MCC Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the Contractor's Activities Services or the MCC Works. The plan prepared by the Contractor Consultant and finalised under clause 9.27.4, which must set out in adequate detail the procedures the Contractor Consultant will implement to manage the Contractor's Activities and the Works Services from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must not be inconsistent with the Contractor’s Environmental Management Plan and must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), ) all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor Consultant personnel (including the Contractor's Consultant’s key people under clause 3.6(a4.4(a)(i)) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding the Environment during the Contractor's Activities Services and the MCC Works; the training and awareness programmes provided to Contractor and subcontractor Consultant personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.27.4; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the Contractor's Activities Services and the MCC Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities Services and the MCC Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 7.4 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the Contractor's Activities Services and the MCC Works); the procedure for ensuring subcontractor compliance with the Environmental Management Plan; the procedure for regular auditing or other monitoring of Contractor and subcontractor Consultant compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities Services and the MCC Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by the: ContractSubcontract; or Contract AdministratorContractor’s Representative. The Environmental Objectives are: to encourage best practice environmental management through the planning, development, implementation and continuous improvement of environmental management procedures during the Services; to prevent and minimise adverse impacts on the Environment; to recognise and protect any special environmental characteristics of the Site (including cultural heritage significance); and the additional objectives specified in the Subcontract Particulars.
Appears in 2 contracts
Samples: Design Services Subcontract, Design Services Subcontract
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the ContractorMCC Works, the Subcontractor's Activities or the Subcontract Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the ContractorSubcontractor's Activities or the Subcontract Works. The plan prepared by the Contractor Subcontractor and finalised under clause 9.28.7, which must set out in adequate detail the procedures the Contractor Subcontractor will implement to manage the ContractorSubcontractor's Activities and the Subcontract Works from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must not be inconsistent with the Contractor’s Environmental Management Plan and must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), all ESD Principles and WOL Objectives; , the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the ContractorSubcontractor's key people under clause 3.6(a)2.3) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding the Environment during the ContractorSubcontractor's Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.28.7; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the ContractorSubcontractor's Activities and the Subcontract Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the ContractorSubcontractor's Activities and the Subcontract Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 8.7 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the ContractorSubcontractor's Activities and the Subcontract Works); the procedure for ensuring subcontractor subsubcontractor compliance with the Environmental Management Plan; the procedure for regular auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the ContractorSubcontractor's Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by the: ContractSubcontract; or Contract AdministratorContractor’s Representative. The Environmental Objectives are: to encourage best practice environmental management through the planning, development, implementation and continuous improvement of environmental management procedures during the Subcontractor's Activities and the Subcontract Works; to prevent and minimise adverse impacts on the Environment; to recognise and protect any special environmental characteristics of the Site (including cultural heritage significance); and the additional objectives specified in the Subcontract Particulars.
Appears in 2 contracts
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities Subcontractor’s Activities, the Subcontract Works or the MCC Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the Contractor's Subcontractor’s Activities or the Subcontract Works. The plan prepared by the Contractor Subcontractor and finalised under clause 9.2, which must set out in adequate detail the procedures the Contractor Subcontractor will implement to manage the Contractor's Subcontractor’s Activities and the Subcontract Works from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must not be inconsistent with the Contractor’s Environmental Management Plan and must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the Contractor's Subcontractor’s key people under clause 3.6(a)) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding the Environment during the Contractor's Subcontractor’s Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.2; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the Contractor's Subcontractor’s Activities and the Subcontract Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Subcontractor’s Activities and the Subcontract Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the Contractor's Subcontractor’s Activities and the Subcontract Works); the procedure for ensuring subcontractor subsubcontractor compliance with the Environmental Management Plan; the procedure for regular auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Subcontractor’s Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by the: ContractSubcontract; or Contract AdministratorContractor’s Representative. The following objectives: to encourage best practice environmental management through the planning, development, implementation and continuous improvement of environmental management procedures during the Subcontractor’s Activities and the Subcontract Works; to prevent and minimise adverse impacts on the Environment; to recognise and protect any special environmental characteristics of the Site (including cultural heritage significance); and the additional objectives specified in the Subcontract Particulars.
Appears in 1 contract
Samples: Major Works Subcontract
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities Services or the MCC Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the Contractor's Activities Services or the MCC Works. The plan prepared by the Contractor Consultant and finalised under clause 9.27.4, which must set out in adequate detail the procedures the Contractor Consultant will implement to manage the Contractor's Activities and the Works Services from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must not be inconsistent with the Contractor’s Environmental Management Plan and must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), ) all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor Consultant personnel (including the Contractor's Consultant’s key people under clause 3.6(a4.4(a)(i)) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding the Environment during the Contractor's Activities Services and the MCC Works; the training and awareness programmes provided to Contractor and subcontractor Consultant personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.27.4; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the Contractor's Activities Services and the MCC Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities Services and the MCC Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 7.4 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the Contractor's Activities Services and the MCC Works); the procedure for ensuring subcontractor compliance with the Environmental Management Plan; the procedure for regular auditing or other monitoring of Contractor and subcontractor Consultant compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities Services and the MCC Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by the: ContractSubcontract; or Contract AdministratorContractor’s Representative. The following objectives: to encourage best practice environmental management through the planning, development, implementation and continuous improvement of environmental management procedures during the Services; to prevent and minimise adverse impacts on the Environment; to recognise and protect any special environmental characteristics of the Site (including cultural heritage significance); and the additional objectives specified in the Subcontract Particulars.
Appears in 1 contract
Samples: Design Services Subcontract
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities Services or the Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the Contractor's Activities Services or the Works. The plan prepared by the Contractor Consultant and finalised under clause 9.27.4, which must set out in adequate detail the procedures the Contractor Consultant will implement to manage the Contractor's Activities and the Works Services from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor Consultant and subcontractor subconsultant personnel (including the ContractorConsultant's key people under clause 3.6(a4.5(a)(i)) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding the Environment during the Contractor's Activities Services and the Works; the training and awareness programmes provided to Contractor Consultant and subcontractor subconsultant personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.27.4; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the Contractor's Activities Services and the Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the WorksServices; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 7.4 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the Contractor's Activities and the WorksServices); the procedure for ensuring subcontractor subconsultant compliance with the Environmental Management Plan; the procedure for regular auditing or other monitoring of Contractor Consultant and subcontractor subconsultant compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the WorksServices; the additional matters specified in the Contract Particulars; and any other matters required by the: Contract; or Contract Administrator.
Appears in 1 contract
Samples: Design Services Contract
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities Services or the Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the Contractor's Activities Services or the Works. The plan prepared by the Contractor Consultant and finalised under clause 9.27.4, which must set out in adequate detail the procedures the Contractor Consultant will implement to manage the Contractor's Activities and the Works Services from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor Consultant and subcontractor subconsultant personnel (including the ContractorConsultant's key people under clause 3.6(a4.5(a)) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding the Environment during the Contractor's Activities and the WorksServices; the training and awareness programmes provided to Contractor Consultant and subcontractor subconsultant personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.27.4; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the Contractor's Activities Services and the Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the WorksServices; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 7.4 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the Contractor's Activities and the WorksServices); the procedure for ensuring subcontractor subconsultant compliance with the Environmental Management Plan; the procedure for regular regularly auditing or other monitoring of Contractor Consultant and subcontractor subconsultant compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the WorksServices; the additional matters specified in the Contract Particulars; and any other matters required by theby: the Contract; or the Contract Administrator.
Appears in 1 contract
Samples: Design Services Contract
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the ContractorMCC Works, the Subcontractor's Activities or the Subcontract Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the ContractorSubcontractor's Activities or the Subcontract Works. The plan prepared by the Contractor Subcontractor and finalised under clause 9.28.7, which must set out in adequate detail the procedures the Contractor Subcontractor will implement to manage the ContractorSubcontractor's Activities and the Subcontract Works from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must not be inconsistent with the Contractor’s Environmental Management Plan and must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), all ESD Principles and WOL Objectives; , the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the ContractorSubcontractor's key people under clause 3.6(a)2.3) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding the Environment during the ContractorSubcontractor's Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.28.7; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the ContractorSubcontractor's Activities and the Subcontract Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the ContractorSubcontractor's Activities and the Subcontract Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 8.7 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the ContractorSubcontractor's Activities and the Subcontract Works); the procedure for ensuring subcontractor subsubcontractor compliance with the Environmental Management Plan; the procedure for regular auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the ContractorSubcontractor's Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by the: ContractSubcontract; or Contract AdministratorContractor’s Representative. The following objectives: to encourage best practice environmental management through the planning, development, implementation and continuous improvement of environmental management procedures during the Subcontractor's Activities and the Subcontract Works; to prevent and minimise adverse impacts on the Environment; to recognise and protect any special environmental characteristics of the Site (including cultural heritage significance); and the additional objectives specified in the Subcontract Particulars.
Appears in 1 contract
Samples: Medium Works Subcontract
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the ContractorMCC Works, the Subcontractor's Activities or the Subcontract Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the ContractorSubcontractor's Activities or the Subcontract Works. The plan prepared by the Contractor Subcontractor and finalised under clause 9.28.7, which must set out in adequate detail the procedures the Contractor Subcontractor will implement to manage the ContractorSubcontractor's Activities and or the Subcontract Works from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must not be inconsistent with the Contractor’s Environmental Management Plan and must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), all ESD Principles and WOL Objectives; , the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the ContractorSubcontractor's key people under clause 3.6(a)2.3) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding the Environment during the ContractorSubcontractor's Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.28.7; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the ContractorSubcontractor's Activities and the Subcontract Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the ContractorSubcontractor's Activities and the Subcontract Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 8.7 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the ContractorSubcontractor's Activities and the Subcontract Works); the procedure for ensuring subcontractor subsubcontractor compliance with the Environmental Management Plan; the procedure for regular regularly auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the ContractorSubcontractor's Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by theby: Contractthe Subcontract; or Contract Administratorthe Contractor’s Representative. The Environmental Objectives are: to encourage best practice environmental management through the planning, development, implementation and continuous improvement of environmental management procedures during the Subcontractor's Activities and the Subcontract Works; to prevent and minimise adverse impacts on the Environment; to recognise and protect any special environmental characteristics of the Site (including cultural heritage significance); and the additional objectives specified in the Subcontract Particulars.
Appears in 1 contract
Samples: Medium Works Subcontract
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities Subcontractor’s Activities, the Subcontract Works or the MCC Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the Contractor's Subcontractor’s Activities or the Subcontract Works. The plan prepared by the Contractor Subcontractor and finalised under clause 9.2, which must set out in adequate detail the procedures the Contractor Subcontractor will implement to manage the Contractor's Subcontractor’s Activities and the Subcontract Works from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must not be inconsistent with the Contractor’s Environmental Management Plan and must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (eb), all ESD Principles and WOL Objectives; , the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the Contractor's Subcontractor’s key people under clause 3.6(a)) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding the Environment during the Contractor's Subcontractor’s Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.2; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the Contractor's Subcontractor’s Activities and the Subcontract Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Subcontractor’s Activities and the Subcontract Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the Contractor's Subcontractor’s Activities and the Subcontract Works); the procedure for ensuring subcontractor subsubcontractor compliance with the Environmental Management Plan; the procedure for regular regularly auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Subcontractor’s Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by theby: Contractthe Subcontract; or Contract Administratorthe Contractor’s Representative. The Environmental Objectives are: to encourage best practice environmental management through the planning, development, implementation and continuous improvement of environmental management procedures during the Subcontractor’s Activities and the Subcontract Works; to prevent and minimise adverse impacts on the Environment; to recognise and protect any special environmental characteristics of the Site (including cultural heritage significance); and the additional objectives specified in the Subcontract Particulars.
Appears in 1 contract
Samples: Major Works Subcontract
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities or the Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the Contractor's Activities or the Works. The plan prepared by the Contractor and finalised under clause 9.2, which must set out in adequate detail the procedures the Contractor will implement to manage the Contractor's Activities and the Works from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor personnel (including the Contractor's key people under clause 3.6(a)) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding the Environment during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.2; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the Contractor's Activities and the Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the Contractor's Activities and the Works); the procedure for ensuring subcontractor compliance with the Environmental Management Plan; the procedure for regular regularly auditing or other monitoring of Contractor and subcontractor compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by theby: the Contract; or the Contract Administrator.
Appears in 1 contract
Samples: Head Contract
Environmental Clearance Certificate. The Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities Subcontract Services or the Works and any conditions incorporated in that certificate. Any actual or threatened adverse impact on, or damage to, the Environment. Any Environmental Harm or Contamination arising out of or in connection with the Contractor's Activities Subcontract Services or the Works. The plan prepared by the Contractor Subconsultant and finalised under clause 9.27.4, which must set out in adequate detail the procedures the Contractor Subconsultant will implement to manage the Contractor's Activities and the Works Subcontract Services from an environmental perspective to: ensure compliance with the Environmental Requirements and Statutory Requirements; and xxxxxxxx the achievement of the Environmental Objectives, the ESD Principles and the WOL Objectives. The Environmental Management Plan must not be inconsistent with the Consultant’s Environmental Management Plan and must address, at a minimum: all Environmental Requirements; without limiting paragraph (c), all Statutory Requirements; all Environmental Objectives; without limiting paragraph (e), all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor Subconsultant personnel (including the Contractor's Subconsultant’s key people under clause 3.6(a4.4(a)(i)) regarding the Environment; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the DSC Contract Administrator, the Commonwealth Consultant, the Consultant’s Representative and Other Contractors regarding the Environment during the Contractor's Activities Subcontract Services and the Works; the training and awareness programmes provided to Contractor and subcontractor Subconsultant personnel regarding the Environment; the procedure for preparing (including tailoring) and finalising the Environmental Management Plan under clause 9.27.4; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on the Environment associated with the Contractor's Activities Subcontract Services and the Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities Subcontract Services and the Works; the procedure for regularly reviewing, updating and amending the Environmental Management Plan under clause 9.2 7.4 (including as a result of any complaint, incident (including Environmental Incidents), near misses and other situations or accidents on Commonwealth property or the Site during the Contractor's Activities Subcontract Services and the Works); the procedure for ensuring subcontractor compliance with the Environmental Management Plan; the procedure for regular auditing or other monitoring of Contractor and subcontractor Subconsultant compliance with the Environmental Management Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints, incidents (including Environmental Incidents), near misses and other situations or accidents regarding the Environment during the Contractor's Activities Subcontract Services and the Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by the: ContractSubcontract; or Contract AdministratorConsultant’s Representative. The Environmental Objectives are: to encourage best practice environmental management through the planning, development, implementation and continuous improvement of environmental management procedures during the Subcontract Services; to prevent and minimise adverse impacts on the Environment; to recognise and protect any special environmental characteristics of the Site (including cultural heritage significance); and the additional objectives specified in the Subcontract Particulars.
Appears in 1 contract
Samples: Design Services Subcontract