Environmental Management (a) The Operator must, prior to the commencement of any Train Services (including any new or varied Train Services): (i) cause a suitably qualified person reasonably acceptable to both Parties to prepare a report (“Environmental Investigation and Risk Management Report”) containing an environmental investigation component and an environmental risk management component which respectively identify: (A) possible risks of Environmental Harm arising out of the proposed use of the Nominated Network by the Operator, including risks associated with those matters identified in Part 3 of Schedule 6; and (B) the manner in which the Operator proposes to address the possible risks of Environmental Harm identified in the Environmental Investigation and Risk Management Report as well as the roles and responsibilities, including financial responsibility, for the control measures proposed and an audit regime, provided that if the Operator has an existing Environmental Management System it proposes to use in connection with the proposed Train Services on the Nominated Network, the Environmental Investigation and Risk Management Report should also detail the extent to which the Operator believes its existing Environmental Management System addresses the risks identified in the Environmental Investigation and Risk Management Report; and (ii) provide a copy of the Environmental Investigation and Risk Management Report to Aurizon Network for its consideration and, if requested by Aurizon Network, a copy of the relevant parts of the Operator’s existing Environmental Management System referred to in the Environmental Investigation and Risk Management Report. (b) If the Environmental Investigation and Risk Management Report discloses areas of risk which, in the reasonable opinion of Aurizon Network, cannot be adequately managed by the proposals set out in the Environmental Investigation and Risk Management Report or, in the reasonable opinion of Aurizon Network, fails to identify and adequately deal with additional relevant environmental risks, then Aurizon Network may give notice to that effect to the Operator within thirty (30) days after the date on which the Environmental Investigation and Risk Management Report was received by Aurizon Network (or such other period as the Parties, acting reasonably, may agree), detailing the risks not so adequately managed or not so identified or adequately dealt with. If Aurizon Network does not give such notice, the Environmental Investigation and Risk Management Report, subject to Clause 9.1(k), shall be included in Part 1 of Schedule 9 and amendments made to this Agreement [(including variations to the Base Access Charges)] if applicable. [Bracketed text is only included where Operator pays non-TOP Access Charges] (c) If Aurizon Network gives notice pursuant to Clause 9.1 (b) the Operator may respond, by a date agreed by the Parties, with a written proposal which demonstrates how the Operator proposes to manage those risks (“Operator’s Proposal”). The Operator’s Proposal must: (i) contain an investigation of the areas of risk and/or additional relevant environmental risks referred to in Clause 9.1(b); (A) specify risk abatement or attenuation measures which the Operator proposes to undertake in relation to them; and/or (B) specify how the Access Charges might contain a component reflecting the cost to Aurizon Network of assuming all or some portion of the risk; (ii) in relation to paragraph (ii)(A) specify a timeframe for implementation of those measures; and (iii) specify details of any public consultation the Operator proposes to undertake in connection with the implementation of any such measures. (d) Aurizon Network may, acting reasonably, accept or reject all or part of the Operator’s Proposal. (e) If Aurizon Network accepts the Operator’s Proposal, then it will be incorporated into and form part of the Environmental Investigation and Risk Management Report which, subject to Clause 9.1(k), shall be included in Part 1 of Schedule 9 and amendments made to the Agreement [(including variations to the Base Access Charges)] if applicable. [Bracketed text is only included where Operator pays non-TOP Access Charges] (f) If the Operator fails to submit to Aurizon Network an Operator’s Proposal by the date agreed by the Parties or if Aurizon Network rejects all or part of the Operator’s Proposal, Aurizon Network may advise the Operator of the risks not adequately managed or not identified or adequately dealt with and then either Party may refer the issue of whether the Environmental Investigation and Risk Management Report and/or the Operator’s Proposal does or does not adequately manage or does or does not identify or adequately deal with the relevant environmental risks to an expert for determination in accordance with Clause 18.3. (g) If the expert determines that the Environmental Investigation and Risk Management Report and/or Operator’s Proposal does adequately manage the risks or identifies and adequately deals with the risks, then the Environmental Investigation and Risk Management Report as modified by the Operator’s Proposal (if applicable) will, subject to Clause 9.1(k), be accepted and included in Part 1 of Schedule 9 and amendments made to this Agreement [(including variations to the Base Access Charges)] if applicable. [Bracketed text is only included where Operator pays non-TOP Access Charges] (h) If the expert determines that the Environmental Investigation and Risk Management Report and/or Operator’s Proposal does not adequately manage the risks or does not identify and adequately deal with the risks, then provided the Operator amends the Environmental Investigation and Risk Management Report in accordance with the expert’s determination and/or recommendations within the time frame specified by the expert, the Environmental Investigation and Risk Management Report as amended will, subject to Clause 9.1(k), be accepted and included in Part 1 of Schedule 9 and amendments made to the Agreement [(including variations to the Base Access Charges)] if applicable. [Bracketed text is only included where Operator pays non-TOP Access Charges] (i) If the expert determines that the Environmental Investigation and Risk Management Report and/or Operator’s Proposal does not adequately manage the risks or does not identify and adequately deal with the risks and the Operator fails to amend the Environmental Investigation and Risk Management Report in accordance with the expert’s determination and/or recommendations within the time frame specified by the expert, Aurizon Network may terminate this Agreement by written notice to the Operator and the End User. (j) The Parties agree to implement the determination of the expert. (k) If: (i) an Environmental Investigation and Risk Management Report is included in Part 1 of Schedule 9; and (ii) amendments (if any) are made to this Agreement as a result of or in connection with that inclusion of the Environmental Investigation and Risk Management Report, then the commencement of the amendment of this Agreement to include the Environmental Investigation and Risk Management Report and those amendments is subject to and conditional upon the Operator being notified by Aurizon Network that all necessary amendments (if any) to the End User Access Agreement (including variations to the amounts payable by the End User) have been made in respect of such matters and any relevant nomination of the Operator by the End User in accordance with the End User Access Agreement has, if necessary, been varied.
Environmental Compliance (a) No Loan Party or Restricted Subsidiary (i) has failed to comply in all material respects with applicable Environmental Law or to obtain, maintain or comply with any Environmental Permit, (ii) has become subject to any Environmental Liability, (iii) has received notice of any claim with respect to any material Environmental Liability or (iv) has a Responsible Officer with knowledge of any basis for any material Environmental Liability, except, in each case, as would not, individually or in the aggregate, reasonably be expected to have a Material Adverse Effect. (i) None of the properties currently or formerly owned or operated by any Loan Party or Restricted Subsidiary is or was listed or, to the knowledge of any Responsible Officer was proposed for listing on the NPL or on the CERCLIS or any analogous state or local list at any time while such property was owned by such Loan Party or, to the knowledge of any Responsible Officer, at any time prior to or after such property was owned by such Loan Party, and, to the knowledge of any Responsible Officer, no property currently owned or operated by any Loan Party or Restricted Subsidiary is adjacent to any such property, in each case in connection with any matter for which any Loan Party or Restricted Subsidiary would have any material Environmental Liability; (ii) there are no, or, to the knowledge of any Responsible Officer, never have been any underground or above-ground storage tanks or any surface impoundments, septic tanks, pits, sumps or lagoons in which Hazardous Materials are being or have been treated, stored or disposed on any property currently owned or operated by any Loan Party or Restricted Subsidiary in violation of any Environmental Laws or, to the knowledge of any Responsible Officer, on any property formerly owned or operated by any Loan Party or Restricted Subsidiary; (iii) there is no friable asbestos or friable asbestos-containing material on any property currently owned or operated by any Loan Party or Restricted Subsidiary; (iv) Hazardous Materials have not been Released, discharged or disposed of on any property currently or formerly owned or operated by any Loan Party or Restricted Subsidiary in violation of any Environmental Laws; and (v) to the knowledge of any Responsible Officer, there are no pending or threatened Liens under or pursuant to any applicable Environmental Laws on any real property or other assets owned or leased by any Loan Party or Restricted Subsidiary, and to the knowledge of any Responsible Officer, no actions by any Governmental Authority have been taken or are in process which would subject any of such properties or assets to such Liens, except, in the case of clauses (i) through (v) above, as would not, individually or in the aggregate, reasonably be expected to have a Material Adverse Effect. (c) No Loan Party or Restricted Subsidiary is undertaking, and no Loan Party or Restricted Subsidiary has completed, either individually or together with other potentially responsible parties, any investigation or assessment or remedial or response action relating to any actual or threatened Release, discharge or disposal of Hazardous Materials at any site, location or operation, either voluntarily or pursuant to the order of any Governmental Authority or the requirements of any Environmental Law that has or would reasonably be expected to have a Material Adverse Effect; and all Hazardous Materials generated, used, treated, handled or stored at, or transported to or from, any property currently or formerly owned or operated by any Loan Party or Restricted Subsidiary have been disposed of in a manner not reasonably expected, individually or in the aggregate, to have a Material Adverse Effect.
Environmental Audits There are no environmental audits, evaluations, assessments, studies or tests relating to the Corporation except for ongoing assessments conducted by or on behalf of the Corporation in the ordinary course.
Environmental Monitoring (a) Borrower shall give prompt written notice to Lender of (i) any proceeding or inquiry by any party (including any Governmental Authority) with respect to the presence of any Hazardous Substance on, under, from or about the Property, (ii) all claims made or threatened by any third party (including any Governmental Authority) against Borrower or the Property or any party occupying the Property relating to any loss or injury resulting from any Hazardous Substance, and (iii) Borrower’s discovery of any occurrence or condition on any real property adjoining or in the vicinity of the Property that could cause the Property to be subject to any investigation or cleanup pursuant to any Environmental Law. Upon becoming aware of the presence of mold or fungus at the Property, Borrower shall (i) undertake an investigation to identify the source(s) of such mold or fungus and, to the extent required by applicable law, shall develop and implement an appropriate remediation plan to eliminate the presence of any Toxic Mold, (ii) perform or cause to be performed all acts reasonably necessary for the remediation of any Toxic Mold (including taking any action necessary to clean and disinfect any portions of the Property affected by Toxic Mold, including providing any necessary moisture control systems at the Property), and (iii) provide evidence reasonably satisfactory to Lender of the foregoing. Borrower shall permit Lender to join and participate in, as a party if it so elects, any legal or administrative proceedings or other actions initiated with respect to the Property in connection with any Environmental Law or Hazardous Substance, and Borrower shall pay all reasonable attorneys’ fees and disbursements incurred by Lender in connection therewith. (b) If Lender, on its good faith judgment, determines that reasonable cause exists for the performance of an environmental inspection or audit of the Property, at any time and from time to time upon Lender’s request, Borrower shall provide such inspection or audit of the Property prepared by a licensed hydrogeologist, licensed environmental engineer or qualified environmental consulting firm approved by Lender assessing the presence or absence of Hazardous Substances on, in or near the Property, and if Lender in its good faith judgment determines that reasonable cause exists for the performance of such environmental inspection or audit, then the cost and expense of such audit or inspection shall be paid by Borrower. Such inspections and audit may include soil borings and ground water monitoring. If Borrower fails to provide any such inspection or audit within thirty (30) days after such request, Lender may order same, and Borrower hereby grants to Lender and its employees and agents access to the Property and a license to undertake such inspection or audit. (c) If any environmental site assessment report prepared in connection with such inspection or audit recommends that an operations and maintenance plan be implemented for any Hazardous Substance, whether such Hazardous Substance existed prior to the ownership of the Property by Borrower, or presently exists or is reasonably suspected of existing, Borrower shall cause such operations and maintenance plan to be prepared and implemented at its expense upon request of Lender, to the extent required by applicable law, and with respect to any Toxic Mold, Borrower shall, to the extent required by applicable law, take all action necessary to clean and disinfect any portions of the Improvements affected by Toxic Mold in or about the Improvements, including providing any necessary moisture control systems at the Property. If any investigation, site monitoring, containment, cleanup, removal, restoration or other work of any kind is reasonably necessary under an applicable Environmental Law (“Remedial Work”), Borrower shall commence all such Remedial Work within thirty (30) days after written demand by Lender and thereafter diligently prosecute to completion all such Remedial Work within such period of time as may be required under applicable law. All Remedial Work shall be performed by licensed contractors approved in advance by Lender and under the supervision of a consulting engineer approved by Lender which approval shall not be unreasonably withheld or delayed. All costs of such Remedial Work shall be paid by Borrower, including Lender’s reasonable attorneys’ fees and disbursements incurred in connection with the monitoring or review of such Remedial Work. If Borrower does not timely commence and diligently prosecute to completion the Remedial Work, Lender may (but shall not be obligated to) cause such Remedial Work to be performed at Borrower’s expense. Notwithstanding the foregoing, Borrower shall not be required to commence such Remedial Work within the above specified time period: (x) if prevented from doing so by any Governmental Authority, (y) if commencing such Remedial Work within such time period would result in Borrower or such Remedial Work violating any Environmental Law, or (z) if Borrower, at its expense and after prior written notice to Lender, is contesting by appropriate legal, administrative or other proceedings, conducted in good faith and with due diligence, the need to perform Remedial Work. Borrower shall have the right to contest the need to perform such Remedial Work, provided that, (1) Borrower is permitted by the applicable Environmental Laws to delay performance of the Remedial Work pending such proceedings, (2) neither the Property nor any part thereof or interest therein will be sold, forfeited or lost if Borrower fails to promptly perform the Remedial Work being contested, and if Borrower fails to prevail in contest, Borrower would thereafter have the opportunity to perform such Remedial Work, (3) Lender would not, by virtue of such permitted contest, be exposed to any risk of any civil liability for which Borrower has not furnished additional security as provided in clause (4) below, or to any risk of criminal liability, and neither the Property nor any interest therein would be subject to the imposition of any Lien for which Borrower has not furnished additional security as provided in clause (4) below, as a result of the failure to perform such Remedial Work and (4) Borrower shall have furnished to Lender additional security in respect of the Remedial Work being contested and the loss or damage that may result from Borrower’s failure to prevail in such contest in such amount as may be reasonably requested by Lender but in no event less than the cost of such Remedial Work as estimated by Lender and Borrower or Lender’s Consultant and any loss or damage that may result from Borrower’s failure to prevail in such contest. (d) Borrower shall not install or permit to be installed on the Property any underground storage tank.
Environmental Assessments Foreclose on or take a deed or title to any commercial real estate without first conducting a Phase I environmental assessment of the property or foreclose on any commercial real estate if such environmental assessment indicates the presence of a Hazardous Substance in amounts which, if such foreclosure were to occur, would be material.
Environmental Conditions A Phase I environmental site assessment (or update of a previous Phase I and or Phase II environmental site assessment) and, with respect to certain Mortgage Loans, a Phase II environmental site assessment (collectively, an “ESA”) meeting ASTM requirements conducted by a reputable environmental consultant in connection with such Mortgage Loan within 12 months prior to its origination date (or an update of a previous ESA was prepared), and such ESA (i) did not identify the existence of recognized environmental conditions (as such term is defined in ASTM E1527-13 or its successor, hereinafter “Environmental Condition”) at the related Mortgaged Property or the need for further investigation, or (ii) if the existence of an Environmental Condition or need for further investigation was indicated in any such ESA, then at least one of the following statements is true: (A) an amount reasonably estimated by a reputable environmental consultant to be sufficient to cover the estimated cost to cure any material noncompliance with applicable Environmental Laws or the Environmental Condition has been escrowed by the related Mortgagor and is held or controlled by the related Mortgagee; (B) if the only Environmental Condition relates to the presence of asbestos-containing materials, radon in indoor air, lead based paint or lead in drinking water, the only recommended action in the ESA is the institution of such a plan, an operations or maintenance plan has been required to be instituted by the related Mortgagor that can reasonably be expected to mitigate the identified risk; (C) the Environmental Condition identified in the related environmental report was remediated or abated in all material respects prior to the date hereof, and, if and as appropriate, a no further action or closure letter was obtained from the applicable governmental regulatory authority (or the environmental issue affecting the related Mortgaged Property was otherwise listed by such governmental authority as “closed” or a reputable environmental consultant has concluded that no further action is required); (D) an environmental policy or a lender’s pollution legal liability insurance policy that covers liability for the identified circumstance or condition was obtained from an insurer rated no less than “A-” (or the equivalent) by Xxxxx’x Investors Service, Inc., S&P Global Ratings, acting through Standard & Poor’s Financial Services LLC, Fitch Ratings, Inc. and/or A.M. Best Company; (E) a party not related to the Mortgagor was identified as the responsible party for such condition or circumstance and such responsible party has financial resources reasonably estimated to be adequate to address the situation; or (F) a party related to the Mortgagor having financial resources reasonably estimated to be adequate to address the situation is required to take action. To the Mortgage Loan Seller’s knowledge, except as set forth in the ESA, there is no Environmental Condition (as such term is defined in ASTM E1527-13 or its successor) at the related Mortgaged Property.
Environmental Except as would not, individually or in the aggregate, reasonably be expected to have a Material Adverse Effect, (i) the Company is in compliance with and not subject to any known liability under applicable Environmental Laws (as defined below), (ii) the Company has made all filings and provided all notices required under all applicable Environmental Laws, and has, and is in compliance with, all permits required under any applicable Environmental Laws, each of which is in full force and effect, (iii) (a) there are no pending Proceedings with respect to any Environmental Laws affecting the Company, (b) the Company has not received any demand, claim or notice of violation of any Environmental Laws and (c) to the knowledge of the Company, there is no Proceeding, notice or demand letter or request for information threatened against the Company under any Environmental Law, (iv) no Lien or restriction has been recorded under any Environmental Law with respect to any assets, facility or property owned, operated, leased or controlled by the Company, (v) the Company has not received notice that it has been identified as a potentially responsible party under the Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended (“CERCLA”), or any comparable state law, (vi) no property or facility of the Company (a) is listed or, to the knowledge of the Company, proposed for listing on the National Priorities List under CERCLA or any state list of hazardous substance sites requiring cleanup, (b) is listed in the Comprehensive Environmental Response, Compensation, Liability Information System List promulgated pursuant to CERCLA, or on any comparable list maintained by any state or local governmental authority, (vii) no Hazardous Materials are being released (as defined below) at, on or under any facility owned, operated, leased or controlled by the Company or have been Released at, on or under any facility owned, operated, leased or controlled by the Company (except as may be allowed by permit) and, to the knowledge of the Company, none of the facilities owned, operated, leased or controlled by the Company are adversely affected by any Release of Hazardous Materials originating or emanating from any other property.
Environmental Audit If required by the Administrative Agent, reports and other information in form, scope and substance satisfactory to the Administrative Agent and prepared by environmental consultants satisfactory to the Administrative Agent, concerning any environmental hazards or liabilities to which any Credit Party may be subject with respect to such Additional Mortgaged Property; and
Environmental Condition Except as set forth on Schedule 5.12 to the Information Certificate, (a) to each Loan Party’s knowledge, no properties or assets of any Loan Party or any of its Subsidiaries have ever been used by a Loan Party, its Subsidiaries, or by previous owners or operators in the disposal of, or to produce, store, handle, treat, release, or transport, any Hazardous Materials, where such disposal, production, storage, handling, treatment, release or transport was in violation, in any material respect, of any applicable Environmental Law, (b) to each Loan Party’s knowledge, after due inquiry, no Loan Party’s nor any of its Subsidiaries’ properties or assets have ever been designated or identified in any manner pursuant to any environmental protection statute as a Hazardous Materials disposal site, (c) no Loan Party nor any of its Subsidiaries has received notice that a Lien arising under any Environmental Law has attached to any revenues or to any Real Property owned or operated by a Loan Party or its Subsidiaries, and (d) no Loan Party nor any of its Subsidiaries nor any of their respective facilities or operations is subject to any outstanding written order, consent decree, or settlement agreement with any Person relating to any Environmental Law or Environmental Liability that, individually or in the aggregate, could reasonably be expected to result in a Material Adverse Change.
Environmental Assessment Buyer shall have the right for a period commencing upon execution of this Agreement by both parties and ending on November 28, 2012, to conduct an environmental assessment of the Assets, at Buyer’s sole risk, liability and expense. Seller shall make available to Buyer, during the environmental assessment period described above, Seller’s historical files regarding prior operations on the Assets, and provide Buyer and its representatives with reasonable access to the Assets to conduct the environmental assessment. Buyer shall provide Seller three (3) days prior written notice of a desired date(s) for such assessment and Seller shall have the right to be present during any assessment and, if any testing is conducted pursuant to Seller’s express prior written consent, Seller may require splitting of all samples. Notwithstanding any other provision of this Agreement to the contrary, Buyer shall not have the right to drill any test, monitor or other xxxxx or to extract samples of any air, soil, water or other substance from the Assets without Seller’s express prior written consent. If Buyer proposes a reasonable request to drill a test well or extract a sample pursuant to a systematic and customary procedure for the assessment of the environmental condition of the Assets and Seller refuses to grant its consent to such a well or sampling, then Buyer shall have the right, for a period of seventy-two (72) hours following notification of Seller’s refusal to consent, to deliver written notice to Seller of Buyer’s election to exclude from this transaction the portion of the Assets affected by such proposed test well or sample, and the Purchase Price shall be adjusted accordingly by the Allocated Value of such portion of the Assets so excluded. Under no circumstances whatsoever shall Seller ever be obligated to grant its consent to any such test xxxxx or sampling proposed by Buyer, and Buyer’s sole and exclusive remedy for any refusal by Seller to grant its consent shall be the limited right contained in the preceding sentence to exclude the affected Assets from the transactions contemplated by this Agreement. If Buyer fails to exercise the right to exclude such Assets by written notice to Seller delivered prior to the expiration of the seventy-two hour period described above, then Buyer shall be conclusively deemed to have waived such right and shall be obligated to purchase the affected Assets without conducting such testing or sampling or any adjustment of the Purchase Price unless otherwise provided in this Agreement.