Evaporation Pond Sample Clauses

Evaporation Pond. The evaporation pond collects start-up flush water and cooling tower blowdown wastewater for disposal. This allows for disposal of settleable solids and pollutants on a rubberized liner which prevents the start-up and blowdown wastewater from entering the Gila River and the groundwater regional aquifer well water system. The present pond is 250 surface acres. The future ponds will comprise an additional 455 acres. This system includes the earthen dike surrounding the pond, a rubberized liner and related environmental monitoring xxxxx and equipment.
AutoNDA by SimpleDocs

Related to Evaporation Pond

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Natural Gas 21.1 Subject to Article 21.2, the Indian domestic market shall have the first call on the utilisation of Natural Gas discovered and produced from the Contract Area. Accordingly, any proposal by the Contractor relating to Discovery and production of Natural Gas from the Contract Area shall be made in the context of the Government's policy for the utilisation of Natural Gas and shall take into account the objectives of the Government to develop its resources in the most efficient manner and to promote conservation measures. 21.2 The Contractor shall have the right to use Natural Gas produced from the Contract Area for the purpose of Petroleum Operations including reinjection for pressure maintenance in Oil Fields, gas lifting and captive power generation required for Petroleum Operations. 21.3 For the purpose of sales in the domestic market pursuant to this Article 21, the Contractor shall have freedom to market the Gas and sell its entitlement.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Electrical Power Corporation shall provide Contractor with convenient access to electrical power required to perform the work. The electrical outlets used by Contractor shall be those designated or approved by Corporation.

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Air and Water Subrecipient agrees to comply with the following regulations in so far as they apply to the performance of this Contract: Clean Air Act, 42 U.S.C., 1857, et seq. Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251, et seq. Environmental Protection Agency (EPA) regulations pursuant to 00 XXX 00 xxx 00 XXX 00.

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.

  • Gas If Customer has selected a Gas Fixed Rate, Customer’s Price will be based on the Fixed Rate(s), plus the Administration Charge, set forth in the Application, which includes RITERATE ENERGY’s compressor fuel and transportation charges, administrative and transaction costs and the Gas Balancing Amount and any Regulatory Charges (defined below).