Exhibitor Setup Schedule and Electrical Power Sample Clauses

Exhibitor Setup Schedule and Electrical Power. Exhibitor setup will be from 2pm- 10pm Wednesday, July 20, 2022 ONLY. No exceptions. No setup is allowed on event day, July 21, 2022. Testing of equipment MUST be completed during setup times. Assistance with electrical power will be made available during setup times. Additional power needs exceeding 600 xxxxx must be requested at least 60 days in advance of event day.
AutoNDA by SimpleDocs

Related to Exhibitor Setup Schedule and Electrical Power

  • COSTS DISTRIBUTED THROUGH COUNTYWIDE COST ALLOCATIONS The indirect overhead and support service costs listed in Schedule A (attached) are formally approved as actual costs for fiscal year 2016-17, and as estimated costs for fiscal year 2018-19 on a “fixed with carry-forward” basis. These costs may be included as part of the county departments’ costs indicated effective July 1, 2018, for further allocation to federal grants and contracts performed by the respective county departments. County of Tehama - 2 - April 30, 2018

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

Time is Money Join Law Insider Premium to draft better contracts faster.