Factor A and Factor Sample Clauses

Factor A and Factor. E will remain constant until the end of the Concession Term, upon their incorporation through ordinary review.
AutoNDA by SimpleDocs

Related to Factor A and Factor

  • Non pre-priced Adjustment Factor To be applied to Work determined not to be included in the CTC but within the general scope of the work: 1.1900.

  • Power Factor The Power Producer shall maintain the Power Factor as per the prevailing GERC regulations and as may be stipulated / specified by GETCO from time to time. The Power Producer shall provide suitable protection devices, so that the Electric Generators could be isolated automatically when grid supply fails. Connectivity criteria like short circuit level (for switchgear), neutral Grounding, fault clearance time, current unbalance (including negative and zero sequence currents), limit of harmonics etc. shall be as per Grid Code.

  • Aircraft Basic Price The Aircraft Basic Price is listed in Table 1 and is subject to escalation in accordance with the terms of this Purchase Agreement.

  • Adjustment Factor The Bidder’s competitively bid price adjustment to the unit prices published in the Construction Task Catalog®.

  • Interest Factor With respect to this Floating Rate Note, accrued interest is calculated by multiplying the principal amount of such Note by an accrued interest factor. The accrued interest factor is computed by adding the interest factor calculated for each day in the particular Interest Reset Period. The interest factor for each day will be computed by dividing the interest rate applicable to such day by 360, in the case of a Floating Rate Note as to which the CD Rate, the Commercial Paper Rate, the Federal Funds Open Rate, the Federal Funds Rate, LIBOR or the Prime Rate is an applicable Interest Rate Basis, or by the actual number of days in the year, in the case of a Floating Rate Note as to which the CMT Rate or the Treasury Rate is an applicable Interest Rate Basis. In the case of a series of Notes that bear interest at floating rates as to which the Constant Maturity Swap Rate is the Interest Rate Basis, the interest factor for each day will be computed by dividing the number of days in the interest period by 360 (the number of days to be calculated on the base is of a year of 360 days with twelve 30-day months (unless (i) the last day of the interest period is the 31st day of a month but the first day of the interest period is a day other than the 30th or 31st day of a month, in which case the month that includes that last day shall not be considered to be shortened to a 30-day month, or (ii) the last day of the interest period is the last day of the month of February, in which case the month of February shall not be considered to be lengthened to a 30-day month)). The interest factor for a Floating Rate Note as to which the interest rate is calculated with reference to two or more Interest Rate Bases will be calculated in each period in the same manner as if only the applicable Interest Rate Basis specified above applied.

  • ADJUSTMENT FACTORS The Contractor will perform any or all Tasks in the Construction Task Catalog for the Unit Price appearing therein multiplied by the following Adjustment Factors. See the General Terms and Conditions for additional information.

  • Economic Price Adjustment is the adjustment to the Aircraft Basic Price (Base Airframe, Engine and Special Features) as calculated pursuant to Exhibit D.

  • Data Universal Number System (DUNS) number Requirement Grantee will provide their valid DUNS number contemporaneous with execution of this Agreement.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Performance Adjustment One-twelfth of the annual Performance Adjustment Rate will be applied to the average of the net assets of the Portfolio (computed in the manner set forth in the Fund's Declaration of Trust or other organizational document) determined as of the close of business on each business day throughout the month and the performance period.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!