Common use of Final Working Drawings Clause in Contracts

Final Working Drawings. After the Final Design Drawings have been approved by Landlord, Tenant shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all permits required for the construction of the Tenant Improvements (the "PERMITS") and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") to Landlord for Landlord's approval, which approval shall not be unreasonably withheld or delayed. Tenant shall supply Landlord with three (3) copies signed by Tenant of such Final Working Drawings. Landlord shall advise Tenant within five (5) business days after Landlord's receipt of the Final Working Drawings for the Premises if the same are unsatisfactory or incomplete in any respect. If Tenant is so advised, Tenant shall promptly cause the Final Working Drawings to be revised in accordance with such review and any disapproval of Landlord in connection therewith.

Appears in 2 contracts

Samples: Disclosure Agreement (Formfactor Inc), Disclosure Agreement (Formfactor Inc)

AutoNDA by SimpleDocs

Final Working Drawings. After the approval of the Final Design Drawings have been approved Space Plan by LandlordLessor and Lessee, Tenant Lessee shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all applicable permits required for the construction of the Tenant Improvements (collectively, the "PERMITSFinal Working Drawings") and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") to Landlord Lessor for LandlordLessor's approval, which approval shall not be unreasonably withheld or delayed. Tenant Lessee shall supply Landlord Lessor with three four (34) copies signed by Tenant Lessee of such Final Working Drawings. Landlord Lessor shall advise Tenant Lessee within five (5) business days after LandlordLessor's receipt of the Final Working Drawings for the Premises if the same are is unsatisfactory or incomplete in any respect, provided that Lessor's approval of the Final Working Drawings shall not be unreasonably withheld or conditioned. If Tenant Lessee is so advised, Tenant the parties shall promptly cause meet and reasonably reach agreement upon the Final Working Drawings to be revised in accordance with such review and Drawings, correcting any disapproval of Landlord in connection therewithdeficiencies therein.

Appears in 2 contracts

Samples: Office Lease (Netgravity Inc), Office Lease (Doubleclick Inc)

Final Working Drawings. After the Final Design Drawings have Space Plan has been approved by Landlord, Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, B.T.U. calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the "Final Working Drawings" (as that term is defined below) in the manner as set forth below. Upon the approval of the Final Space Plan by Landlord and Tenant, Tenant shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all applicable permits required for the construction of the Tenant Improvements (collectively, the "PERMITSFinal Working Drawings") and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") to Landlord for Landlord's approval, which approval shall not be unreasonably withheld or delayed. Tenant shall supply Landlord with three four (34) copies signed by Tenant of such Final Working Drawings. Landlord shall advise Tenant within five ten (510) business days after LandlordXxxxxxxx's receipt of the Final Working Drawings for the Premises if the same are is unsatisfactory or incomplete in any respect. If Tenant is so advised, Tenant Xxxxxx shall promptly cause immediately revise the Final Working Drawings to be revised in accordance with such review and any disapproval of Landlord in connection therewith.

Appears in 1 contract

Samples: Office Lease (Atara Biotherapeutics, Inc.)

Final Working Drawings. After the Final Design Drawings have Space Plan has been approved ---------------------- by LandlordLessor, Tenant Lessee shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications for the Premises, to enable the Engineers and the Architect to complete the "Final Working Drawings" (as that term is defined below) in the manner as set forth below. Upon the approval of the Final Space Plan by Lessor and Lessee, Lessee shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all applicable permits required for the construction of the Tenant Improvements (collectively, the "PERMITSFinal Working Drawings") and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") to Landlord Lessor for LandlordLessor's approval, which approval shall not be unreasonably withheld or delayed. Tenant Lessee shall supply Landlord Lessor with three four (34) copies signed by Tenant Lessee of such Final Working Drawings. Landlord Lessor shall advise Tenant Lessee within five (5) business days after LandlordLessor's receipt of the Final Working Drawings for the Premises if the same are is unsatisfactory or incomplete in any respect. If Tenant Lessee is so advised, Tenant Lessee shall promptly cause immediately revise the Final Working Drawings to be revised in accordance with such review and any disapproval of Landlord Lessor in connection therewith.

Appears in 1 contract

Samples: New Century Financial Corp

Final Working Drawings. After the Final Design Drawings have Space Plan has been approved by Landlord, Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, B.T.U. calculations, electrical requirements and special electrical receptacle requirements for the Improved Space, to enable the Engineers and the Architect to complete the "Final Working Drawings" (as that term is defined below) in the manner as set forth below. Upon the approval of the Final Space Plan by Landlord and Tenant, Tenant shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the PremisesImproved Space, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all applicable permits required for the construction of the Tenant Improvements (the "PERMITS") and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") and shall submit the same to Landlord for Landlord's approval, which approval shall not be unreasonably withheld or delayed. Tenant shall supply Landlord with three two (32) copies signed by Tenant of such Final Working Drawings. Landlord shall advise Tenant within five (5) business days after Landlord's receipt of the Final Working Drawings for the Premises Improved Space if the same are is unsatisfactory or incomplete in any respect. If Tenant is so advised, Tenant shall promptly cause immediately revise the Final Working Drawings to be revised in accordance with such review and any disapproval of Landlord in connection therewith.

Appears in 1 contract

Samples: Lease (Investment Technology Group Inc)

Final Working Drawings. After the Final Design Drawings have Plan has been approved by Landlord, Tenant shall supply the Engineers with a complete listing of standard and non-standard, structural elements, systems, equipment and specifications! including, without limitation, BTU calculations, electrical requirements and special electrical receptacle requirements for the Building and Premises, to enable the Engineers and the Architect to complete the "Final Working Drawings" (as that term is defined below) in the manner as set forth below. Upon the approval of the Plan by Landlord and Tenant, Tenant shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Building and Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in conformance with the approved Plan and in a form which is sufficiently complete to allow contractors and subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all applicable permits required for the construction of the Tenant Improvements (collectively, the "PERMITSFinal Working Drawings") ), together with a proposed time schedule for commencement, progress and completion of Tenant's Work, and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") to Landlord for Landlord's approval, which approval shall not be unreasonably withheld or delayed. Tenant shall supply Landlord with three four (34) copies signed by Tenant of such Final Working DrawingsDrawings and one (1) copy of the time schedule. Landlord shall advise Tenant within five (5) business days after Landlord's receipt of the Final Working Drawings for the Premises if the same are unsatisfactory or incomplete in any respect. If Tenant is so advised, Tenant shall promptly cause the Final Working Drawings to be revised in accordance with such review and any disapproval of Landlord in connection therewith.within

Appears in 1 contract

Samples: Construction Provisions Agreement (Cinemastar Luxury Theaters Inc)

Final Working Drawings. After Upon the approval of the Final Design Drawings have been approved Space Plan by LandlordLessor, Tenant Lessee shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the PremisesLeasehold Improvements, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing the final architectural working drawings in a form which is sufficiently complete to allow subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all applicable permits required for (collectively, the construction of the Tenant Improvements (the "PERMITS"“Final Working Drawings”) and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") to Landlord Lessor for Landlord's Lessor’s approval, which approval shall not be unreasonably withheld or delayed. Tenant Lessee shall supply Landlord Lessor with three four (34) copies signed by Tenant Lessee of such Final Working Drawings. Landlord Lessor shall advise Tenant Lessee within five (5) business days after Landlord's Lessor’s receipt of the Final Working Drawings for the Premises if the same are is unsatisfactory or incomplete in any respect. If Tenant Lessee is so advised, Tenant Lessee and Lessor shall promptly cause meet and cooperate to agree upon the revisions to the Final Working Drawings to be revised in accordance with such review and any disapproval of Landlord Lessor in connection therewith. Lessor may not object to any items previously approved in the Final Space Plan unless additional information is provided in the Final Working Drawings which reasonably justifies such disapproval. Lessor and Lessee shall promptly cooperate to resolve any objections to the drawings and specifications for the Leasehold Improvements.

Appears in 1 contract

Samples: Attornment Agreement (Pfenex Inc.)

Final Working Drawings. After Within twenty (20) business days following Landxxxx'x xpproval of the Final Design Drawings have been approved by LandlordSpace Plan, Tenant shall promptly cause Tenant, Architect, the Architect MPE Subcontractors and the Engineers to Engineer shall complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set C-3 47 of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all applicable permits required for (collectively, the construction of the Tenant Improvements (the " FINAL WORKING DRAWINGS"PERMITS") ), and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") to Landlord for Landlord's approval, which approval . Landlord shall not be unreasonably withheld diligently review the Final Working Drawings and shall either approve or delayed. Tenant shall supply Landlord with disapprove the Final Working Drawings within three (3) copies signed by Tenant business days following receipt thereof, and if Landlord disapproves of such any portion of the Final Working Drawings. Landlord , the parties shall advise Tenant meet, within five two (52) business days after Landlord's receipt of the Final Working Drawings for the Premises if the same are unsatisfactory or incomplete in any respect. If Tenant is so advisedLandxxxx'x xisapproval, Tenant shall promptly cause to agree upon revisions to be made to the Final Working Drawings to be revised in accordance with such review and any disapproval meet the reasonable satisfaction of Landlord and Tenant. The Architect shall then, within two (2) business days after such meeting, revise the Final Working Drawings to the form agreed upon in connection therewithsuch meeting. Landlord shall then approve or reasonably disapprove the revised Final Working Drawings, and in the case of disapproval, the foregoing process shall be repeated until the Final Working Drawings are approved by Landlord.

Appears in 1 contract

Samples: Office Lease (Websidestory Inc)

Final Working Drawings. After the Final Design Drawings have been approved by LandlordTenant, Tenant shall promptly cause the Architect and the Engineers to shall complete the architectural and engineering drawings for the Premises, and the Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all applicable permits required for (collectively, the construction of the Tenant Improvements (the "PERMITS"“Final Working Drawings”) and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") to Landlord for Landlord's ’s approval, which approval . Landlord shall not be unreasonably withheld or delayed. Tenant shall supply diligently review the Final Working Drawings and if Landlord with three (3) copies signed by Tenant disapproves of such any portion of the Final Working Drawings. Landlord , the parties shall advise Tenant meet, within five (5) business days after Landlord's receipt of the Final Working Drawings for the Premises if the same are unsatisfactory or incomplete in any respect. If Tenant is so advised’s disapproval, Tenant shall promptly cause to agree upon revisions to be made to the Final Working Drawings to be revised in accordance with such review and any disapproval meet the reasonable satisfaction of Landlord and Tenant. The Architect shall then, within two (2) business days after such meeting, revise the Final Working Drawings to the form agreed upon in connection therewithsuch meeting. Landlord shall then approve or reasonably disapprove the revised Final Working Drawings, and in the case of disapproval, the foregoing process shall be repeated until the Final Working Drawings are finally approved by Landlord.

Appears in 1 contract

Samples: Lease Agreement (HS Spinco, Inc.)

AutoNDA by SimpleDocs

Final Working Drawings. After Based on the Final Design Drawings have been approved by LandlordSpace Plan, Tenant Lessor shall promptly cause the Architect and the Engineers to diligently complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all applicable permits required for the construction of the Tenant Improvements (collectively, the "PERMITSFinal Working Drawings") and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") to Landlord Lessee for LandlordLessee's approval, which approval shall not be unreasonably withheld or delayed. Tenant shall supply Landlord with three (3) copies signed by Tenant of such The Final Working DrawingsDrawings shall incorporate modifications to the Final Space Plan as necessary to comply with the floor load and other structural and system requirements of the Building. Landlord Lessee shall advise Tenant approve or reasonably disapprove the Final Working Drawings or any revisions thereto within five (5) business days after LandlordLessor delivers the Final Working Drawings or any revisions thereto to Lessee; provided, however, that Lessee may only disapprove the Final Working Drawings to the extent the same are not in substantial conformance with the Final Space Plan. Lessee's receipt failure to reasonably disapprove the Final Working Drawings or any revisions thereto by written notice to Lessor within said five (5) business day period shall be deemed to constitute Lessee's approval of the Final Working Drawings for the Premises if the same are unsatisfactory or incomplete in any respect. If Tenant is so advised, Tenant shall promptly cause the Final Working Drawings to be revised in accordance with such review and any disapproval of Landlord in connection therewithrevisions.

Appears in 1 contract

Samples: Lease (Pricesmart Inc)

Final Working Drawings. After the Final Design Drawings have Space Plan has been approved by Landlord, Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, Btu calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the "Final Working Drawings" (as that term is defined below) in the manner as set forth below. Upon the approval of the Final Space Plan by Landlord and Tenant, Tenant shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all applicable permits required for the construction of the Tenant Improvements (the "PERMITS") and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") and shall submit the same to Landlord for Landlord's approval, which approval shall not be unreasonably withheld or delayed. Tenant shall supply Landlord with three four (34) copies signed by Tenant of such Final Working Drawings. Landlord shall advise Tenant within five (5) business days after Landlord's receipt of the Final Working Drawings for the Premises if the same are is unsatisfactory or incomplete in any respect. If Tenant is so advised, Tenant shall promptly cause immediately revise the Final Working Drawings to be revised in accordance with such review and any disapproval of Landlord in connection therewith.

Appears in 1 contract

Samples: Office Lease (First Consulting Group Inc)

Final Working Drawings. After the Final Design Drawings have Space Plan has been approved by Landlord, Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, B.T.U. calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the "Final Working Drawings" (as that term is defined below) in the manner as set forth below. Upon the approval of the Final Space Plan by Landlord and Tenant, Tenant shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all applicable permits required for the construction of the Tenant Improvements (collectively, the "PERMITSFinal Working Drawings") and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") to Landlord for Landlord's approval, which approval shall not be unreasonably withheld or delayed. Tenant shall supply Landlord with three four (34) copies signed by Tenant of such Final Working Drawings. Landlord shall advise Tenant within five (5) business days after LandlordXxxxxxxx's receipt of the Final Working Drawings for the Premises if the same are is unsatisfactory or incomplete in any respect. If Tenant is so advised, Tenant Xxxxxx shall promptly cause immediately revise the Final Working Drawings to be revised in accordance with such review and any disapproval of Landlord in connection therewith.

Appears in 1 contract

Samples: Multi (Aehr Test Systems)

Final Working Drawings. After As soon as possible after the Final Design Drawings have been approved by Landlorddate hereof, Tenant shall promptly cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and cause the Architect shall to compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all applicable permits required for the construction of the Tenant Improvements (collectively, the "PERMITSFinal Working Drawings") ), and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") to Landlord for Landlord's approval, which approval shall not be unreasonably withheld withheld, conditioned or delayed. Tenant shall supply Landlord with three (3) electronic copies signed by Tenant of such Final Working Drawings. Landlord shall advise Tenant within five three (53) business days after Landlord's receipt of the Final Working Drawings for the Premises if the same are is unsatisfactory or incomplete in any respect. If Tenant is so advised, Tenant shall promptly cause (i) revise the Final Working Drawings to be revised in accordance with such review and any disapproval of Landlord in connection therewith., and

Appears in 1 contract

Samples: And Maintenance Agreement (Tocagen Inc)

Final Working Drawings. After the Final Design Drawings have been approved by LandlordTenant, Tenant shall promptly cause the Architect and the Engineers to shall complete the architectural and engineering drawings for the Premises, and the Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is sufficiently complete to allow subcontractors with a reasonable level of competence and experience in the industry to bid on the work and to obtain all applicable permits required for (collectively, the construction of the Tenant Improvements (the "PERMITS"“Final Working Drawings”) and shall submit the same (collectively, the "FINAL WORKING DRAWINGS") to Landlord for Landlord's ’s approval, which approval . Landlord shall not be unreasonably withheld or delayed. Tenant shall supply diligently review the Final Working Drawings and if Landlord with three (3) copies signed by Tenant disapproves of such any portion of the Final Working Drawings. Landlord , the parties shall advise Tenant meet, within five seven (57) business days after Landlord's receipt of the Final Working Drawings for the Premises if the same are unsatisfactory or incomplete in any respect. If Tenant is so advised’s disapproval, Tenant shall promptly cause to agree upon revisions to be made to the Final Working Drawings to be revised in accordance with such review and any disapproval meet the reasonable satisfaction of Landlord and Tenant. The Architect shall then, within two (2) business days after such meeting, revise the Final Working Drawings to the form agreed upon in connection therewithsuch meeting. Landlord shall then approve or reasonably disapprove the revised Final Working Drawings, and in the case of disapproval, the foregoing process shall be repeated until the Final Working Drawings are finally approved by Landlord.

Appears in 1 contract

Samples: Lease Agreement (HS Spinco, Inc.)