Common use of Financial Close Clause in Contracts

Financial Close. 24.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.2% (zero point two per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 16 contracts

Samples: Concession Agreement, Concession Agreement, Concession Agreement

AutoNDA by SimpleDocs

Financial Close. 24.1.1 23.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] ) days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.2% (zero point two per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] ) days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 16 contracts

Samples: Concession Agreement, Concession Agreement, Concession Agreement

Financial Close. 24.1.1 The 22.1.1. Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 90 (one hundred and twenty)] Ninety) days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and or for a further period not exceeding [80 180 (one hundred and eighty)] ) days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 3 contracts

Samples: Draft Concession Agreement, Draft Concession Agreement, Draft Concession Agreement

Financial Close. 24.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] ) days, subject to payment of Damages to the Authority MPRDC in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and or for a further period not exceeding [80 200 (eighty)] two hundred) days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority MPRDC in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 3 contracts

Samples: Concession Agreement, Concession Agreement, Concession Agreement

Financial Close. 24.1.1 21.1.1. The Concessionaire SPD hereby agrees and undertakes that it shall achieve Financial Close within 180 120 (one hundred and eightytwenty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 90 (one hundred and twentyninety)] days, subject to payment of Damages to the Authority Railways in a sum calculated at the rate of 0.2[0.1% (zero point two one per cent) )] of the Performance Security for each day of delay, and for a further period not exceeding [80 30 (eightythirty)] days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 [90 (one hundred and eighty) ninety)] days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority Railways in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire SPD shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 2 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement

Financial Close. 24.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] days, subject to payment of Damages to the Authority MOR in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority MOR in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 2 contracts

Samples: Model Agreement, Model Agreement

Financial Close. 24.1.1 22.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close Close, for and in respect of debt equal to at least 35% (thirty five per cent) of the Total Project Cost, within a period 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 90 (one hundred and twenty)] ninety) days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.20.05% (zero point two zero five per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 2 contracts

Samples: Concession Agreement, Concession Agreement

Financial Close. 24.1.1 21.1.1 The Concessionaire Operator hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, delay and for a further period not exceeding [80 (eighty)] days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire Operator shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 2 contracts

Samples: Operation and Maintenance Agreement, Operation and Maintenance Agreement

Financial Close. 24.1.1 25.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 2 contracts

Samples: Model Concession Agreement, Model Concession Agreement

Financial Close. 24.1.1 25.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and or for a further period not exceeding [80 200 (eighty)] two hundred) days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 1 contract

Samples: Concession Agreement

Financial Close. 24.1.1 23.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 150 (one hundred and eightyfifty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 30 (one hundred and twenty)] thirty) days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.2% (zero point two per cent) of the Performance Security for each day of delay, and or for a further period not exceeding [80 100 (eighty)] one hundred) days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 150 (one hundred and eightyfifty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 1 contract

Samples: Concession Agreement

Financial Close. 24.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 1 contract

Samples: Model Concession Agreement

Financial Close. 24.1.1 1) The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] days, subject to payment of Damages at the rate specified in Clause 4.315.2; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 1 contract

Samples: Concession Agreement

Financial Close. 24.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] days, subject to payment of Damages to the Authority MOR in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] days, subject to payment of Damages at the rate specified in Clause inClause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority MOR in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 1 contract

Samples: Model Agreement

Financial Close. 24.1.1 22.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 8 (one hundred and eightyeight) days months from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 30 (one hundred and twenty)] thirty) days, subject to payment of Damages to the Authority Lead ULB in a sum calculated at the rate of 0.2% (zero point two per cent) of the Construction Performance Security for each day of delay, and or for a further period not exceeding [80 100 (eighty)] one hundred) days, subject to payment of Damages at the rate specified in Clause 4.34.2; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 8 (one hundred and eightyeight) days months shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority Participating ULBs in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.34.2.

Appears in 1 contract

Samples: Model Concession Agreement

Financial Close. 24.1.1 22.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and or for a further period not exceeding [80 200 (eighty)] two hundred) days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 1 contract

Samples: Concession Agreement

AutoNDA by SimpleDocs

Financial Close. 24.1.1 21.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and or for a further period not exceeding [80 200 (eighty)] two hundred) days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 1 contract

Samples: Concession Agreement

Financial Close. 24.1.1 18.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close Close, within 180 (one a period of 120(one hundred and eightytwenty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further grace period not exceeding [of 60 (sixty) days. For any delay after the expiry of grace period, it shall be entitled to a further period of 120 (one hundred and twenty)] ) days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 grace period of 60 (one hundred and eightysixty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 5.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.34.1.3.

Appears in 1 contract

Samples: Model Concession Agreement

Financial Close. 24.1.1 22.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and or for a further period not exceeding [80 200 (eighty)] two hundred) days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3. It is clarified that the Damages payable under this Agreement are the agreed pre-genuine estimate of damages suffered by the Authority on account of the delay / default by the Concessionaire.

Appears in 1 contract

Samples: Concession Agreement

Financial Close. 24.1.1 21.1.1 The Concessionaire Operator hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire Operator shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 1 contract

Samples: Operation and Maintenance Agreement

Financial Close. 24.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] ) days, subject to payment of Damages to the Authority Government in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] ) days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority MPRDC in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 1 contract

Samples: Concession Agreement

Financial Close. 24.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] ) days, subject to payment of Damages to the Authority Government in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] ) days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority Government in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.Clause

Appears in 1 contract

Samples: Concession Agreement

Financial Close. 24.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] ) days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.20.1 % (zero point two one per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] ) days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 1 contract

Samples: Concession Agreement

Financial Close. 24.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 (one hundred and eighty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 (one hundred and twenty)] ) days, subject to payment of Damages to the Authority Government in a sum calculated at the rate of 0.20.1% (zero point two one per cent) of the Performance Security for each day of delay, and for a further period not exceeding [80 (eighty)] ) days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 (one hundred and eighty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority Government in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 1 contract

Samples: Concession Agreement

Financial Close. 24.1.1 22.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 150 (one hundred and eightyfifty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 30 (one hundred and twenty)] thirty) days, subject to payment of Damages to the Authority Lead ULB in a sum calculated at the rate of 0.2% (zero point two per cent) of the Construction Performance Security for each day of delay, and or for a further period not exceeding [80 100 (eighty)] one hundred) days, subject to payment of Damages at the rate specified in Clause 4.34.2; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 150 (one hundred and eightyfifty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority Participating ULBs in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.34.2.

Appears in 1 contract

Samples: Model Concession Agreement

Financial Close. 24.1.1 9.1.1 The Concessionaire hereby agrees and undertakes that it shall achieve Financial Close within 180 120 (one hundred and eightyTwenty) days from the date of this Agreement and in the event of delay, it shall be entitled to a further period not exceeding [120 30 (one hundred and twenty)] thirty) days, subject to payment of Damages to the Authority in a sum calculated at the rate of 0.2% (zero point two per cent) of the Performance Security for each day of delay, and or for a further period not exceeding [80 100 (eighty)] one hundred) days, subject to payment of Damages at the rate specified in Clause 4.3; provided that the Damages specified herein shall be payable every week in advance and the period beyond the said 180 120 (one hundred and eightyTwenty) days shall be granted only to the extent of Damages so paid; provided further that no Damages shall be payable if such delay in Financial Close has occurred solely as a result of any default or delay by the Authority in procuring satisfaction of the Conditions Precedent specified in Clause 4.1.2 4.1.1 or due to Force Majeure. For the avoidance of doubt, the Damages payable hereunder by the Concessionaire shall be in addition to the Damages, if any, due and payable under the provisions of Clause 4.3.

Appears in 1 contract

Samples: Draft Concession Agreement