Fixed Fire Extinguishing System Sample Clauses
Fixed Fire Extinguishing System. Demonstrate the proper operation of the installed fixed fire extinguishing system. The demonstration shall include: • Operation of local activation system. • Operation of all remote pull stations. • Operation of the audible alarms in the engine room. • Verify required signage, including warnings and instructions are posted.
Fixed Fire Extinguishing System. Protected spaces Engine room, type (Halon/CO2): CO2 Paint locker, type (Halon/CO2): CO2 Emergency generator, type (Halon/CO2): CO2 SCR room, type (Halon/CO2): VFD room CO2 Other - location: Cargo pump room, thrusters rooms, boiler room, fwd aux. mach. room, buzz type panel rooms, engine control room, galley, switchboard rooms, purifier rooms, IGG room, drilling switch gear room and cement room. CO2 Alarms (audible, visual or both): Both Automatic shutting of mechanical ventilation in protected spaces: yes/no Auto and Manual Remote manual release located at: Main CO2 room, aft deck Remote manual release located at: Fwd Emergency Locker Remote manual release located at: Engine Room entrance
Fixed Fire Extinguishing System. Protected spaces: Engine room, type (Halon/CO2): Inergen, Water mist system Paint locker, type (Halon/CO2): CO2 Emergency generator, type (Halon/CO2): Inergen SCR room, type (Halon/CO2): N/A Other - location:thrusters rooms, aux. mach. room, engine control room, switchboard rooms, Inergen, water mist system, water deluge system, CO2 system, foam system Alarms (audible, visual or both): Both Automatic shutting of mechanical ventilation in protected spaces: None Remote manual release located at: WATER MIST SYSTEM - ▇▇▇ ▇▇▇▇, ▇▇▇▇, ▇▇▇▇▇, ▇▇▇▇, ▇▇▇▇▇, ▇▇▇▇▇, ▇▇▇▇▇, ▇▇▇▇, ▇▇▇▇, ▇▇▇▇, ▇▇▇▇. Remote manual release located at: WATER DELUGE SYSTEM - ▇▇▇ ▇▇▇▇, ▇▇▇. ▇▇▇▇▇▇ p/s, Drill floor fwd/aft, Well test area upper deck, Secondary embarkation station, M313, LECR, FWD Embarkation station, Cellar deck M167 port / stbd side. Remote manual release located at: WATER DELUGE SYSTEM - CCR M801, Nay. Bridge p/s, Drill floor fwd/aft, Well test area upper deck, Secondary embarkation station, M313, LECR, FWD Embarkation station, Cellar deck M167 port / stbd side.
