Common use of FULL BENCH CONSTRUCTION Clause in Contracts

FULL BENCH CONSTRUCTION. Where side slopes exceed 45%, Purchaser shall use full bench construction for the entire subgrade width except as construction staked or designed. SUBSECTION DITCH CONSTRUCTION

Appears in 2 contracts

Samples: Sale, www.dnr.wa.gov

AutoNDA by SimpleDocs

FULL BENCH CONSTRUCTION. Where side slopes exceed 45%, Purchaser shall use full bench construction shall be utilized for the entire subgrade width except as construction staked or designed. SUBSECTION DITCH CONSTRUCTION.

Appears in 2 contracts

Samples: www.dnr.wa.gov, www.dnr.wa.gov

FULL BENCH CONSTRUCTION. Where side slopes exceed 45%, Purchaser shall use full bench construction for the entire subgrade width except as construction staked or designed. SUBSECTION DITCH CONSTRUCTIONwidth.

Appears in 1 contract

Samples: www.dnr.wa.gov

AutoNDA by SimpleDocs

FULL BENCH CONSTRUCTION. Where side slopes exceed 45%, Purchaser shall use full bench construction shall be utilized for the entire subgrade width except as construction staked or designed. SUBSECTION DITCH CONSTRUCTIONWaste material shall be end hauled to the location specified by the Contract Administrator.

Appears in 1 contract

Samples: Unit 8