Functional Requirements Serving Existing Clients Sample Clauses

Functional Requirements Serving Existing Clients a. Process renewals or changes in each client’s program eligibility status in accordance with applicable Federal and State policies and procedures;
AutoNDA by SimpleDocs

Related to Functional Requirements Serving Existing Clients

  • Functional Requirements Applications must implement controls that protect against known vulnerabilities and threats, including Open Web Application Security Project (OWASP) Top 10 Risks and denial of service (DDOS) attacks.

  • Additional Requirements from Authorized Users An Authorized User may have distinct requirements that must be met by all individuals employed by or working for the Authorized User. The Contractor’s Staff Members will be expected to comply with these requirements as a condition of the placement.

  • Status Substantial Compliance Analysis The Compliance Officer found that PPB is in substantial compliance with Paragraph 80. See Sections IV and VII Report, p. 17. COCL carefully outlines the steps PPB has taken—and we, too, have observed—to do so. Id. We agree with the Compliance Officer’s assessment. In 2018, the Training Division provided an extensive, separate analysis of data concerning ECIT training. See Evaluation Report: 2018 Enhanced Crisis Intervention Training, Training usefulness, on-the-job applications, and reinforcing training objectives, February 2019. The Training Division assessed survey data showing broad officer support for the 2018 ECIT training. The survey data also showed a dramatic increase in the proportion of officers who strongly agree that their supervisors are very supportive of the ECIT program, reaching 64.3% in 2018, compared to only 14.3% in 2015: The Training Division analyzed the survey results of the police vehicle operator training and supervisory in-service training, as well. These analyses were helpful in understanding attendees’ impressions of training and its application to their jobs, though the analyses did not reach as far as the ECIT’s analysis of post-training on- the-job assessment. In all three training analyses, Training Division applied a feedback model to shape future training. This feedback loop was the intended purpose of Paragraph 80. PPB’s utilization of feedback shows PPB’s internalization of the remedy. We reviewed surveys of Advanced Academy attendees, as well. Attendees were overwhelmingly positive in response to the content of most classes. Though most respondents agreed on the positive aspects of keeping the selected course in the curriculum, a handful of attendees chose options like “redundant” and “slightly disagree,” indicating that the survey tools could be used for critical assessment and not merely PPB self-validation. We directly observed PPB training and evaluations since our last report. PPB provided training materials to the Compliance Officer and DOJ in advance of training. Where either identified issues, PPB worked through those issues and honed its materials. As Paragraph 80 requires, PPB’s training included competency-based evaluations, namely: knowledge checks (i.e., quizzes on directives), in-class responsive quizzes (using clickers to respond to questions presented to the group); knowledge tests (examinations via links PPB sent to each student’s Bureau-issued iPhone); demonstrated skills and oral examination (officers had to show proficiency in first aid skills, weapons use, and defensive tactics); and scenario evaluations (officers had to explain their reasoning for choices after acting through scenarios). These were the same sort of competency-based evaluations we commended in our last report. In this monitoring period, PPB applied the same type of evaluations to supervisory-level training as well as in-service training for all sworn members. PPB successfully has used the surveys, testing, and the training audit.

  • Additional Requirements for Sleeping Rooms The Contractor shall provide departing Attendees a secured area for storing belongings.

  • Closet/Urinal Requirements 6.1 Employees Closets Urinals 1-5 1 Nil 6-10 1 1 11-20 2 2 21-35 3 4 36-50 4 6 51-75 5 7 76-100 6 8

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • Obligation to Notify Owner of Existing Hazardous Materials The Contractor shall immediately notify the Owner and the Design Professional, both orally and in writing, of the presence and location of any physical evidence of, or information regarding the presence of Hazardous Materials at the Site of which it becomes aware. If the Contractor encounters Hazardous Materials on the Site the Contractor shall (i) immediately stop performance of Work or that portion of the Work affected by or affecting such Hazardous Materials; (ii) secure the contaminated area against intrusion; (iii) not disturb or remove the Hazardous Materials; (iv) not proceed, or allow any subcontractor or supplier to proceed, with any Work or other activities in the area affected by such Hazardous Materials until such materials have been properly remediated and until directed in writing to do so by the Owner; and, (v) take any other steps necessary to protect life and health and the surrounding environment. The Contractor shall be entitled to adjustment of the Contract Time and the Contract Sum pursuant to Section 5, Part 2 of these General Conditions in order to compensate for the impact of any required demolition, re-work, shutdown, delay, protection of work, disruption, and start-up resulting from the encountering of such Hazardous Materials on the Site for which the Contractor is not responsible.

  • Operational Requirements 4 At-Sea Monitors are deployed, in accordance with coverage rates developed by 5 NMFS and as assigned through the Pre-Trip Notification System (PTNS), to 6 vessels. Due to availability of funding, changes in the fishery management, 7 such as emergency closures, court ordered closures, weather, and unforeseen 8 events must remain flexible. Additional funding for sea days may be added to 9 the contract within the scope and maximum allowable sea days. 10 The following items define the operational services to be provided by the 11 contractor under this contract.

  • Independent Contractor; No Partnership; No Agency; No Utility Services 15.1 Company and Developer shall be independent contractors. This Agreement shall not be interpreted or construed to create an association, joint venture, agency relationship, or partnership between the Parties or to impose any partnership obligation or partnership liability upon any Party. No Party shall have any right, power or authority to enter into any agreement or undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise bind, the other Party. This Agreement is not an agreement to provide or take utility services of any kind, including, without limitation, interconnection or other electric transmission services.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

Time is Money Join Law Insider Premium to draft better contracts faster.