Fusing and testing facilities Sample Clauses

The 'Fusing and testing facilities' clause defines the requirements and standards for the facilities and equipment used to fuse and test materials, typically in the context of construction or utility projects involving cables or pipelines. It outlines the necessary conditions that such facilities must meet, such as proper calibration, cleanliness, and suitability for the specific materials being joined or tested. This clause ensures that all fusing and testing activities are conducted in a controlled environment, thereby reducing the risk of defects and ensuring the integrity and safety of the final installation.
Fusing and testing facilities. (A) Separate fusing must be provided locally for: (i) the Main Meter; (ii) the Check Meter; and (iii) any other Facility Metering Equipment burden. (B) Local fusing must discriminate with the source fusing. (C) A typical arrangement is illustrated in Appendix 1 of these TSRs. (D) Where CTs are used on low voltage installations, the voltage supply to the Facility Metering Equipment identified in paragraph (A) above must be fused as close as practicable to the point of that supply with a set of isolating links, suitably identified, provided locally to that Metering Equipment. If that point of supply is close to the Facility Metering Equipment identified in paragraph (A), then the isolating links may be omitted.
Fusing and testing facilities. Where current and/or voltage transformers are used, testing facilities shall be provided close by the Meters of each circuit which enable such Meters to be routinely tested and/or changed safely with the circuit energised. (See Appendix C.) Separate fusing shall be provided locally for:- 5.2.1 the Meter; 5.2.2 any other Metering Equipment burden for Allocation purposes; and 5.2.3 any other equipment burden e.g. other non-Allocation Meters, protection, etc.. Local fusing shall discriminate with the source fusing. A typical arrangement is illustrated in Appendix C. Where CTs are used on low voltage installations, the voltage supply to the Metering Equipment shall be fused as close as practicable to the point of that supply with a set of isolating links provided locally, suitably identified, to the Metering Equipment. If that point of supply is close to the Metering Equipment, then the isolating links may be omitted.
Fusing and testing facilities. Separate fusing must be provided locally for:
Fusing and testing facilities. Testing facilities shall be provided close by the Meters of each circuit which enable such Meters to be routinely tested and/or changed safely with the circuit energised. (See Appendix C.) Separate fusing shall be provided locally for:- 5.2.1 the main Meters; 5.2.2 the check Meters; 5.2.3 any other Metering Equipment burden for Allocation purposes; and Superseded 5.2.4 any other non-Allocation metering burden. Local fusing shall discriminate with the source fusing. A typical arrangement is illustrated in Appendix C.