GENERATING PLANT. 1.1 Operation and maintenance costs shall include the following expenses to the extent that they are charge-able to the Navajo Generating Station in accordance with sound accounting practice: 1.1.1 The operation expenses chargeable to FPC Accounts 500, 502, 503, 504, 505, 506, 507, 556, 557 and any costs in the following FPC Accounts pertaining to load dispatching: 1.1.1.1 560, 561, 562, 566 and 567. 1.1.2 The maintenance expenses chargeable to FPC Accounts 510 through 514, inclusive, and any costs in the following FPC Accounts pertaining to load dispatching: 1.1.2.1 568, 569, 570 and 573. 1.1.3 Overhead expenses included in Sections 1.1.1 and 1.1.2 of this Exhibit F incurred by the Operating Agent which are allocable to the operation and maintenance of the Navajo Generating Station. Such overhead expenses shall be determined in accordance with the following allocation procedure: 1.1.3.1 Overhead expenses of the Operating Agent applicable to the Navajo Generating Station operation and maintenance expenses will be generated at two sources: 1.1.3.1.1 The salaries and expenses of the Operating Agent's functional area responsible for power supply and system operations, the supervisory, administrative and clerical staff, including members of the staff that perform system protection, operation and production functions, including appropriate system dispatching costs. 1.1.3.1.2 The salaries and expenses of the Operating Agent's supervisor of steam generation, if not included within Section 1.1.3.1.1 of this Exhibit F, and his supervisory, administrative, engineering and clerical staff.
GENERATING PLANT. 1.1 Operation and maintenance costs shall include the following expenses to the extent that they are charge-able to the Navajo Generating Station in accordance with sound accounting practice: 1.
GENERATING PLANT. XXXXXXXXXXXXXX
GENERATING PLANT. GENERATING UNIT DATA UNIT GENERATOR TRANSFORMER DATA UNIT 10. DESIGN FAULT LEVEL 11. MAXIMUM FAULT CONTRIBUTION FROM [XXX]

Related to GENERATING PLANT

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.

  • Access to Project Site Redeveloper shall permit the representatives of the City to enter Project Site at any and all reasonable times, as the City may deem necessary for the purposes of this Redevelopment Agreement, including but not limited to work and inspection of all work being performed in connection with the construction of the Redeveloper Improvements. Similarly, the City shall permit Redeveloper such entry upon the public rights of way for such purposes. No compensation shall be payable nor shall any charges be made in any form by any party for the access or inspection provided for in this Section. The City’s right of access granted under this Section shall terminate upon issuance by the City of the Redeveloper’s Certificate of Completion of Redeveloper Improvements. Notwithstanding the above, Redeveloper shall not be relieved of the provisions contained in Chapter 14.29 of the Lincoln Municipal Code regarding the use of streets for private construction purposes.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.