Ground Survey. 2.1 The Engineer will provide a boundary and topographic improvements survey of the entire roadway corridor. Survey information beyond/outside the ROW will require permission from the impacted property Owner(s). Requests for access from private property owner(s) and surveys in private property will be the responsibility of the Engineer. 2.2 Perform any ditch/channel cross-sections at 25-foot intervals along and perpendicular to the ditch/channel centerline for a distance of 100 feet left and right of the existing right-of-way (ROW) . 2.3 Survey the horizontal location of visible aboveground utility appurtenances within the existing ROW. 2.4 Survey the horizontal and vertical location of the existing roadway for a distance of 1,000 feet each side of the Project limits. • A telephone order to Dig Tess will be placed to have the underground utilities marked (painted) on the surface. The survey will include tying these marks. • The topographic survey will include tying all visible utility features to include the following: water valves; water meters; sanitary sewer manholes; storm sewer manholes; electrical manholes; power poles; light poles; overhead lines; electrical control panels; traffic signals; traffic signs; telephone manholes and pedestals; stem walls; chain link fences; rock walls; trees, etc. • The survey will also include existing pavement, paint stripes, existing asphalt and concrete driveways, existing concrete sidewalks, ditches, stairs, steps, and existing concrete curb and gutter
Appears in 4 contracts
Samples: Contract for Engineering Services, Contract for Engineering Services, Contract for Engineering Services