Common use of Guidelines and Assumptions Clause in Contracts

Guidelines and Assumptions. The NMS Test Procedures shall include technologically-appropriate tests on all material systems and subsystems of the NMS, and shall be based on the guidelines and assumptions listed below: Most faults internal to the repeater will be simulated either from the Network Operating Center (the "NOC") or locally by a simple process. (a) Faults external to the repeater will be manually initiated at the Sites, including: (1) Satellite LNA fault (if applicable) (2) Receive cable fault (3) Transmission cable fault (4) Power/emergency power fault (5) Telco line fault/backup circuit (if applicable) (6) Ground fault (7) Security system fault (if applicable) (8) Repeater unauthorized entry fault (b) NOC operation will have been verified by the NOC vendor prior to the City-wide NOC testing process. (c) Contractor personnel will operate the NOC and will run the test sequence at the NOC during the NMS testing. (d) If specified in the task order, City-wide NMS testing will be coincident with Repeater Acceptance Testing. (e) Actual equipment faults and system-level checks will be in accordance with the final NMS configuration and capabilities. ***** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions.

Appears in 3 contracts

Samples: Contract for Engineering and Construction of Terrestrial Repeater Network System (Xm Satellite Radio Holdings Inc), Contract for Engineering and Construction (Xm Satellite Radio Holdings Inc), Contract for Engineering and Construction (Xm Satellite Radio Holdings Inc)

AutoNDA by SimpleDocs

Guidelines and Assumptions. The NMS Test Procedures shall include technologically-appropriate tests on all material systems and subsystems of the NMS, and shall be based on the guidelines and assumptions listed below: Most faults internal to the repeater will be simulated either from the Network Operating Center (the "NOC") or locally by a simple process. (a) Faults external to the repeater will be manually initiated at the Sites, including: (1) Satellite LNA fault (if applicable) (2) Receive cable fault (3) Transmission cable fault (4) Power/emergency power fault (5) Telco line fault/backup circuit (if applicable) (6) Ground fault (7) Security system fault (if applicable) (8) Repeater unauthorized entry fault (b) NOC operation will have been verified by the NOC vendor prior to the City-wide NOC testing process. (c) Contractor personnel will operate the NOC and will run the test sequence at the NOC during the NMS testing. (d) If specified in the task order, City-wide NMS testing will be coincident with Repeater Acceptance Testing. (e) Actual equipment faults and system-level checks will be in accordance with the final NMS configuration and capabilities. ***** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions.

Appears in 1 contract

Samples: Contract for Engineering and Construction of Terrestrial Repeater Network System (LCC International Inc)

AutoNDA by SimpleDocs
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!