How long does it take to establish a subsidiary in Austria Sample Clauses

How long does it take to establish a subsidiary in Austria. The incorporation of a GmbH can be managed within a few days. In case of urgency transfer of shelf companies is offered.
AutoNDA by SimpleDocs

Related to How long does it take to establish a subsidiary in Austria

  • Foreign-Owned Companies in Connection with Critical Infrastructure If Texas Government Code, Section 2274.0102(a)(1) (relating to prohibition on contracts with certain foreign-owned companies in connection with critical infrastructure) is applicable to this Contract, pursuant to Government Code Section 2274.0102, Contractor certifies that neither it nor its parent company, nor any affiliate of Contractor or its parent company, is: (1) majority owned or controlled by citizens or governmental entities of China, Iran, North Korea, Russia, or any other country designated by the Governor under Government Code Section 2274.0103, or (2) headquartered in any of those countries.

  • Special Permit from Relevant Ministerial/ Government Agencies and Foreign Capital Ownership Limitation Raw Material for Explosives (Ammonium Nitrate) with maximum foreign equity ownership of 49% and a special permit from the Minister of Defense (ISIC 2411) Industry of explosive materials and its components for industry need with maximum foreign equity ownership of 49% and a special permit from the Minister of Defense (ISIC 2429) Sugar Industry (Xxxxx Xxxxxxx Sugar, Refined Crystal Sugar and Raw Crystal Sugar) with maximum foreign equity ownership of 95% and a special permit from the Minister of Industry and the Minister of Agriculture, and it has to be integrated with the sugar plantation. The manufacturing of raw crystal sugar is required for any sugar manufacturer with sugarcane input capacity exceeding 8000 tons per day (ISIC 1542) Processing of plantation product industry (similar capacity or exceeding a certain capacity, according to Regulation of Minister of Agriculture Number 26 of 2007 with maximum foreign capital ownership of 95% with a special permit from Minister of Agriculture. - Fiber and Seed Cotton Industry (ISIC1514, 1711) - Crude oil industry (edible oil) from vegetable and animal, coconut oil industry, palm oil industry, rubber to be sheet, thick latex, crumb rubber industry, raw castor oil industry, sugar, sugar cane and sugar cane residue industry, black tea/green tea industry, dry tobacco leaves industry, Copra, Fiber, Coconut Charcoal, Dust, Nata de coco industry, Coffee sorting, cleaning and peeling industry, Cocoa cleaning, peeling and drying industry, cleaning and peeling seed other than coffee and cacao industry, cashew to be dry seed cashew and Cashew Nut Shell Liquid (CNSL) Industry, Peppercorn to be dry white pepper and dry black pepper industry (ISIC 1514, 2429, 1542, 1549, 1600, 2519, 1531)

  • Additional Domestic Subsidiaries Notify the Administrative Agent of the creation or acquisition of any Domestic Subsidiary (including, without limitation, upon the formation of any Domestic Subsidiary that is a Divided LLC) and promptly thereafter (and in any event within thirty (30) days after such creation or acquisition or such later time as may be determined by the Administrative Agent in its sole discretion), other than with respect to an Excluded Subsidiary or an Excluded Securitization Subsidiary, cause such Domestic Subsidiary, and cause each direct and indirect parent of such Domestic Subsidiary (if it has not already done so), to (i) become a Global Guarantor by delivering to the Administrative Agent a duly executed joinder agreement or such other document as the Administrative Agent shall deem appropriate for such purpose, (ii) grant a security interest in all Collateral (subject to the exceptions specified in the Collateral Agreement) owned by such Subsidiary by delivering to the Administrative Agent a duly executed supplement to each Collateral Document or such other document as the Administrative Agent shall deem appropriate for such purpose and comply with the terms of each Collateral Document, (iii) deliver to the Administrative Agent such documents and certificates referred to in Section 4.01 as may be reasonably requested by the Administrative Agent, (iv) deliver to the Administrative Agent such original certificates representing the Pledged Equity or other certificates of such Person accompanied by undated irrevocable stock powers executed in blank, (v) deliver to the Administrative Agent such updated Schedules to the Loan Documents as requested by the Administrative Agent with respect to such Person, and (vi) deliver to the Administrative Agent such other documents as may be reasonably requested by the Administrative Agent, all in form, content and scope reasonably satisfactory to the Administrative Agent.

  • International Olympic Committee; International Red Cross and Red Crescent Movement As instructed from time to time by ICANN, the names (including their IDN variants, where applicable) relating to the International Olympic Committee, International Red Cross and Red Crescent Movement listed at xxxx://xxx.xxxxx.xxx/en/resources/registries/reserved shall be withheld from registration or allocated to Registry Operator at the second level within the TLD. Additional International Olympic Committee, International Red Cross and Red Crescent Movement names (including their IDN variants) may be added to the list upon ten (10) calendar days notice from ICANN to Registry Operator. Such names may not be activated in the DNS, and may not be released for registration to any person or entity other than Registry Operator. Upon conclusion of Registry Operator’s designation as operator of the registry for the TLD, all such names withheld from registration or allocated to Registry Operator shall be transferred as specified by ICANN. Registry Operator may self-­‐allocate and renew such names without use of an ICANN accredited registrar, which will not be considered Transactions for purposes of Section 6.1 of the Agreement.

  • Unbundled Copper Loop – Non-Designed (UCL-ND 2.4.3.1 The UCL–ND is provisioned as a dedicated 2-wire metallic transmission facility from BellSouth’s Main Distribution Frame to a customer’s premises (including the NID). The UCL-ND will be a “dry copper” facility in that it will not have any intervening equipment such as load coils, repeaters, or digital access main lines (“DAMLs”), and may have up to 6,000 feet of bridged tap between the end user’s premises and the serving wire center. The UCL-ND typically will be 1300 Ohms resistance and in most cases will not exceed 18,000 feet in length, although the UCL-ND will not have a specific length limitation. For loops less than 18,000 feet and with less than 1300 Ohms resistance, the loop will provide a voice grade transmission channel suitable for loop start signaling and the transport of analog voice grade signals. The UCL-ND will not be designed and will not be provisioned with either a DLR or a test point. 2.4.3.2 The UCL-ND facilities may be mechanically assigned using BellSouth’s assignment systems. Therefore, the Loop Make Up process is not required to order and provision the UCL-ND. However, Lightyear can request Loop Make Up for which additional charges would apply. 2.4.3.3 At an additional charge, BellSouth also will make available Loop Testing so that Lightyear may request further testing on the UCL-ND. Rates for Loop Testing are as set forth in Exhibit B of this Attachment. 2.4.3.4 UCL-ND loops are not intended to support any particular service and may be utilized by Lightyear to provide a wide-range of telecommunications services so long as those services do not adversely affect BellSouth’s network. The UCL-ND will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the loop to the customer’s inside wire. 2.4.3.5 Order Coordination (OC) will be provided as a chargeable option and may be utilized when the UCL-ND provisioning is associated with the reuse of BellSouth facilities. Order Coordination -Time Specific (OC-TS) does not apply to this product. 2.4.3.6 Lightyear may use BellSouth’s Unbundled Loop Modification (ULM) offering to remove bridge tap and/or load coils from any loop within the BellSouth network. Therefore, some loops that would not qualify as UCL-ND could be transformed into loops that do qualify, using the ULM process.

  • Admission of the Corporate Taxpayer into a Consolidated Group; Transfers of Corporate Assets (a) If the Corporate Taxpayer is or becomes a member of an affiliated or consolidated group of corporations that files a consolidated income tax return pursuant to Sections 1501 et seq. of the Code or any corresponding provisions of state or local law, then: (i) the provisions of this Agreement shall be applied with respect to the group as a whole; and (ii) Tax Benefit Payments, Early Termination Payments and other applicable items hereunder shall be computed with reference to the consolidated taxable income of the group as a whole. (b) If any entity that is obligated to make a Tax Benefit Payment or Early Termination Payment hereunder transfers one or more assets to a corporation (or a Person classified as a corporation for U.S. federal income tax purposes) with which such entity does not file a consolidated tax return pursuant to Section 1501 of the Code, such entity, for purposes of calculating the amount of any Tax Benefit Payment or Early Termination Payment (e.g., calculating the gross income of the entity and determining the Realized Tax Benefit of such entity) due hereunder, shall be treated as having disposed of such asset in a fully taxable transaction on the date of such contribution. The consideration deemed to be received by such entity shall be equal to the fair market value of the contributed asset. For purposes of this Section 7.11, a transfer of a partnership interest shall be treated as a transfer of the transferring partner’s share of each of the assets and liabilities of that partnership.

  • CERTIFICATION REGARDING CERTAIN FOREIGN-OWNED COMPANIES IN CONNECTION WITH CRITICAL INFRASTRUCTURE (Texas law as of September 1, 2021) By submitting a proposal to this Solicitation, you certify that you agree to the following required by Texas law as of September 1, 2021: Proposing Company is prohibited from entering into a contract or other agreement relating to critical infrastructure that would grant to the company direct or remote access to or control of critical infrastructure in this state, excluding access specifically allowed by the Proposing Company for product warranty and support purposes. Company, certifies that neither it nor its parent company nor any affiliate of company or its parent company, is (1) owned by or the majority of stock or other ownership interest of the company is held or controlled by individuals who are citizens of China, Iran, North Korea, Russia, or a designated country; (2) a company or other entity, including governmental entity, that is owned or controlled by citizens of or is directly controlled by the government of China, Iran, North Korea, Russia, or a designated country; or (3) headquartered in China, Iran, North Korea, Russia, or a designated country. For purposes of this contract, “critical infrastructure” means “a communication infrastructure system, cybersecurity system, electric grid, hazardous waste treatment system, or water treatment facility.” See Tex. Gov’t Code § 2274.0101(2) of SB 1226 (87th leg.). The company verifies and certifies that company will not grant direct or remote access to or control of critical infrastructure, except for product warranty and support purposes, to prohibited individuals, companies, or entities, including governmental entities, owned, controlled, or headquartered in China, Iran, North Korea, Russia, or a designated country, as determined by the Governor.

  • Subsidiaries, Partnerships and Joint Ventures Each of the Loan Parties shall not, and shall not permit any of its Unregulated Subsidiaries to, own or create directly or indirectly any Subsidiaries other than (i) any Subsidiary which is a Regulated Entity, (ii) any Subsidiary which is an Inactive Subsidiary of the Borrower, (iii) Conserve to Preserve Foundation, a non-profit corporation organized under the laws of the State of New Jersey, (iv) any Subsidiary which has joined this Agreement as Guarantor on the Closing Date, (v) any Project Subsidiary, and (vi) any Subsidiary formed after the Closing Date which joins this Agreement as a Guarantor pursuant to Section 11.19 [Joinder of Guarantors]. Each of the Loan Parties shall not become or agree to (1) become a general or limited partner in any general or limited partnership, except that the Loan Parties may be general or limited partners in other Loan Parties, (2) become a member or manager of, or hold a limited liability company interest in, a limited liability company, except that the Loan Parties may be members or managers of, or hold limited liability company interests in, other Loan Parties, or (3) become a joint venturer or hold a joint venture interest in any joint venture, except in each case in respect of a Permitted Related Business Opportunity.

  • Disposal of Subsidiary Interests Except for any sale of all of its interests in the Equity Interests of any of its Subsidiaries in compliance with the provisions of Section 8.9 and except for Liens securing the Obligations, no Credit Party shall, nor shall it permit any of its Subsidiaries to, (a) directly or indirectly sell, assign, pledge or otherwise encumber or dispose of any Equity Interests of any of its Subsidiaries, except to qualify directors if required by Applicable Laws; or (b) permit any of its Subsidiaries directly or indirectly to sell, assign, pledge or otherwise encumber or dispose of any Equity Interests of any of its Subsidiaries, except to another Credit Party (subject to the restrictions on such disposition otherwise imposed hereunder), or to qualify directors if required by Applicable Laws.

  • Unbundled Copper Loops (UCL) 2.4.1 BellSouth shall make available Unbundled Copper Loops (UCLs). The UCL is a copper twisted pair Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters) and is not intended to support any particular telecommunications service. The UCL will be offered in two types – Designed and Non-Designed.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!