INCIDENTAL STONE BASE. (7-1-95) (Rev.8-21-12) 545 SP5 R28R Description Place incidental stone base on driveways, mailboxes, etc. immediately after paving and do not have the paving operations exceed stone base placement by more than one week without written permission of the Engineer. Materials and Construction Provide and place incidental stone base in accordance with Section 545 of the 2012 Standard Specifications.
Appears in 12 contracts
Samples: Proposal Item Sheet, Proposal Item Sheet, connect.ncdot.gov
INCIDENTAL STONE BASE. (7-1-95) (Rev.8-21-12) 545 SP5 R28R Description Place incidental stone base on driveways, mailboxes, etc. immediately after paving and do not have the paving operations exceed stone base placement by more than one week without written permission of the Engineer. Materials and Construction Provide and place incidental stone base in accordance with Section 545 of the 2012 2018 Standard Specifications. Measurement and Payment Incidental Stone Base will be measured and paid in accordance with Article 545-6 of the 2018 Standard Specifications.
Appears in 7 contracts
Samples: Proposal Item Sheet, connect.ncdot.gov, Proposal Item Sheet