INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141
Appears in 50 contracts
Samples: Service Timber Sale Contract, Service Timber Sale Contract, Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) SAMPLE CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141141 SAMPLE
Appears in 12 contracts
Samples: Service Timber Sale Contract, Service Timber Sale Contract, Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage (Timber) Claim Clearcutting Units Construct Continuous Scaling Services Contract Area Contract Area Map Contract Term Adjustment Contract Term Extension Contractor’s Operations Current Contract Rates Current Contract Value Current Unit Rates Design Change Excess Timber Value Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B2.31 B5.1 B6.81 B1.0 B1.1 B8.21 B8.23 B6.3 B3.1 B3.1 B5.251 B5.253 B4.53 B6.81 B4.217 B7.2 A4 B3.1 B2.1 B8.221 B6.81 B2.35 B7.42 Term Integrated Resource Account Intermittent Scaling Services Marked Negligent Fire Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Stewardship Credits Streamcourses Subcontractor Substantially Completed Technical Proposal Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Expenditure Utilization Standards Weighing Services Agreement Reference B4.2 B6.81 B2.35 B7.42 B6.31 B6.35 B7.41 B8.35 B2.3 B2.33 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B4.5 B6.5 B8.64 B5.23 B6.311 B5.1 A4 B3.1 B8.2 B4.2 B2.3 B2.34 B8.35 A2, B2.2 B6.814 Contract FS-2400-613, Pages 110 through 141 144 (06/200610/2019) CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141110 CONTENTS
Appears in 8 contracts
Samples: Integrated Resource Timber Contract, Integrated Resource Timber Contract, Integrated Resource Timber Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141
Appears in 6 contracts
Samples: Service Timber Sale Contract, Service Timber Sale Contract, Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) 110 SAMPLE CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 111 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141141 SAMPLE 112
Appears in 4 contracts
Samples: Service Timber Sale Contract, Service Timber Sale Contract, Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) SAMPLE CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141141 SAMPLE
Appears in 3 contracts
Samples: Service Timber Sale Contract, Service Timber Sale Contract, Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141
Appears in 2 contracts
Samples: Service Timber Sale Contract, Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) 110 CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 111 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141141 112
Appears in 1 contract
Samples: Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees STrees AM Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 PB5.12 L B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization FACILITIESAuthorization Requirements of Rights-of-Way Use of Roads REoads by Purchaser Specified Roads Engineering RoadsEngineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection SProtection AM Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 PB8.31 L B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed ChangeEd Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141
Appears in 1 contract
Samples: Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) DRAFT CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141141 DRAFT B1.0—SALE AREA DRAFT
Appears in 1 contract
Samples: Service Timber Sale Contract
INDEX TO TERMS. Term Reference Term Reference Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates A4 A4 A4 Integrated Resource Account Intermittent Scaling Services Marked B4.2 B6.81 B2.35 Bid Premium Rates A4 Negligent Fire Reference B7.42 Bid Rates A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season B6.31 Catastrophic Damage (Timber) B2.133 Off-Road Equipment B6.35 Claim B9.2 Operations Fire B7.41 Clearcutting Units B2.31 Out-of-Pocket Expenses B8.35 Construct B5.1 Overstory Removal Units B2.33 Continuous Scaling Services B6.81 Plans Purchaser’s Operations B5.211 Contract Area B1.0 Required Deposits Sale Area Sale A4 Contract Area Map B1.1 Scaling B6.8 Contract Term Adjustment B8.21 Schedule of Items B5.2 Contract Term Extension B8.23 Shop Drawings B5.211 Contractor’s Operations B6.3 Specified Roads B5.2 Current Contract Rates B3.1 Stewardship Credits B4.5 Current Contract Value B3.1 Streamcourses B6.5 Current Unit Rates B5.251 Subcontractor B8.64 Design Change B5.253 Substantially Completed B5.23 Excess Timber Value B4.53 Technical Proposal B6.311 Extended Scaling Services B6.81 Temporary Roads B5.1 Extension Deposit B4.217 Tentative Rate B3.1 Fire Precautionary Period B7.2 Termination Date Timber Sale Account B8.2 Flat Rates B3.1 Understory Removal Units B2.34 Included Timber B2.1 Unrecovered Expenditures Expenditure B8.35 Indicated Advertised Rates B8.221 Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Weighing Services Agreement B6.814 Contract FS-2400-613, Pages 110 through 141 144 (06/200610/2019) 110 CONTENTS Reference Reference SAMPLE Number Title Page Number Title Page B1.0 CONTRACT AREA 114 B4.1 Amount Payable for Timber 118 B1.1 Contract Area Map 114 B4.2 Integrated Resource Account 118 B1.2 Claims 114 B4.21 Cash Deposits 118 B2.0 TIMBER SPECIFICATIONS 114 B4.211 Downpayment 118 B2.1 Included Timber 114 B4.212 Advanced Deposits 118 B2.11 Standard Timber 114 B4.213 Periodic Payment Schedule 119 B2.12 Substandard Timber 114 B4.214 Deposits for Charges Subject to B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Contractor 114 114 B4.215 Escalation Deposits When Payment Guaranteed 119 119 B2.132 Negligent or Willful Damage Damaged 114 B4.216 Blanket Cash Deposits 119 B2.133 Damage by Catastrophe 114 B4.217 Extension Deposits 119 B2.134 Minor Damage by Natural Causes 115 B4.218 Cooperative Deposits 119 B2.14 Unintentionally Cut Timber 115 B4.22 Temporary Reduction of Downpayment 119 B2.15 Construction Timber 115 B4.23 Refund of Excess Cash 119 B2.16 B2.2 B2.3 Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond 120 120 120 B2.31 Clearcutting Units 115 B4.32 Letters of Credit for Payment Bond 120 B2.32 Construction Clearing 115 B4.4 Payments Not Received 120 B2.33 Overstory Removal Units 115 B4.5 Stewardship Credits 121 B2.34 Understory Removal Units 115 B4.51 Progress Estimates 121 B2.35 Individual Trees 115 B4.52 Excess Stewardship Credits 121 B2.36 Incompletely Marked Timber 115 B4.53 Excess Timber Value 121 B2.37 Minor Changes 115 B4.54 Cash Payment for Stewardship B2.4 Volume Estimate 115 Projects 121 B2.41 Adjustment for Volume Deficit 115 B4.55 Refund of Unused Stewardship Credits 121 B2.42 Adjustment for Excess Volume 116 B5.0 TRANSPORTATION FACILITIES 121 B3.0 RATES OF PAYMENT 116 B5.1 Authorization 121 B3.1 Current Contract Rates 116 B5.11 Requirements of Rights-of-Way 121 B3.2 Escalation Procedure 116 B5.12 Use of Roads by Purchaser Contractor 121 B3.21 Unavailable Index 116 B5.2 Specified Roads 121 B3.3 Rate Redetermination 116 B5.21 Engineering 122 B3.31 Rate Redetermination for B5.211 Contract Plans 122 Environmental Modification 117 B5.212 Construction Staking 123 B3.32 Rate Redetermination after B5.22 Material Delivery 123 Catastrophic Damage 117 B5.23 Use of Partially Constructed Roads 123 B3.33 Rate Redetermination for Market B5.24 Estimated Cost 123 Change 117 B5.25 Construction Cost Adjustment 123 B3.34 Emergency Rate Redetermination 117 B5.251 Variation in Quantities 123 B3.4 Other Payment Rates 117 B5.252 Physical Change 124 B3.41 Material Not in A2 117 B5.253 Design Change 124 B3.42 B3.43 Timber Cut Through Mistake Designated Timber Cut But Not Removed 117 118 B5.26 B5.27 Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost 125 125 B3.44 Undesignated Timber Damaged B5.3 Road Maintenance 125 Without Negligence 118 B5.4 Use by Others 125 B3.45 Undesignated Timber Unnecessarily B6.0 OPERATIONS 126 Damaged or Negligently or Willfully Cut 118 B6.1 Representatives 126 B6.11 Notices 126 B3.46 Liquidated Damages 118 B6.2 Improvements 126 B3.47 Defect Caused by Abnormal Delay 118 B6.21 Removal 126 B4.0 PAYMENT 118 B6.22 Protection of Improvements 126 Reference Reference Number Title Page Number Title Page B6.221 Protection of Improvements Not 127 Owned by Forest Service 127 B6.851 Scaling Lost Sample Loads 134 B6.222 Protection of Property 127 B6.86 Scale Reports 135 B6.23 Protection of Land Survey Monuments 127 B6.9 Stewardship Projects 135 B6.24 Protection Measures Needed for B7.0 FIRE PRECAUTIONS AND CONTROL 135 Plants, Animals, Cultural Resources, B7.1 Plans 135 and Cave Resources 127 B7.2 Fire Precautions 135 B6.3 Control of Operations 128 B7.21 Substitute Precautions 135 B6.31 Operating Schedule Plan 128 B7.22 Emergency Precautions 135 B6.311 Inclusion of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number Technical Proposal 128 B7.3 Fire Control 135 B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road B7.31 Contractor’s Reinforcement Obligations 135 B6.32 Construction Protection of Residual Trees 128 128 B7.311 B7.312 Suspend Operations Personnel 135 135 B6.33 Safety 128 B7.313 Equipment 135 B6.34 Sanitation and Servicing 129 B7.4 Fire Suppression Costs 135 B6.341 Prevention of Oil Spills 129 B7.41 Operations Fire 135 B6.342 Hazardous Substances 129 B7.42 Negligent Fire 136 B6.35 Equipment Cleaning 129 B7.43 Other Fires on Contract Area 136 B6.36 Acceptance of Work 130 B7.5 State Law 136 B6.361 B6.4 Acceptance of Specified Roads Conduct of Logging 130 130 B7.6 B8.0 Performance by Contractor OTHER CONDITIONS 136 136 B6.41 Felling and Bucking 130 B8.1 Title and Liability 136 B6.411 Felling in Clearings 130 B8.11 Title Passage 136 B6.412 Xxxxx Heights 130 B8.12 Liability for Loss 136 B6.413 Bucking Lengths 130 B8.2 Period of Contract 136 B6.414 Limbing 130 B8.21 Contract Term Adjustment 136 B6.42 Skidding and Yarding 130 B8.211 Delay in Reconstruction of B6.421 Rigging 131 Processing Facilities 137 B6.422 Landings and Skid Trails 131 B8.212 Market-Related Contract Term B6.423 Skidding on Roads 131 Addition 137 B6.424 Arches and Dozer Blades 131 B8.22 Termination for Catastrophe 137 B6.5 Streamcourse Protection 131 B8.221 Termination by Contractor 137 B6.6 Erosion Prevention and Control 131 B8.222 Termination by Forest Service 137 B6.61 Meadow Protection 131 B8.23 Contract Term Extension 137 B6.62 Wetlands Protection 131 B8.3 Contract Modification 138 B6.63 Temporary Roads 131 B8.31 Changed Conditions 138 B6.631 Temporary Roads to Remain Open 131 B8.32 Modification for Catastrophe 138 B6.64 Landings 132 B8.33 Contract Suspension and Modification 138 B6.65 Skid Trails and Fire Lines 132 B8.34 Contract Termination 139 B6.66 Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses 139 B6.67 Erosion Control Structure Maintenance 132 B8.36 Termination for Market Change 140 B6.7 Slash Disposal 132 B8.4 Performance by Other than Purchaser Contractor 140 B6.8 B6.81 B6.811 Scaling Scaling Services Scaling Locations 000 000 000 B8.5 B8.6 B8.61 Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees 140 140 140 B6.812 Scaling Adjustments 132 B8.62 Officials Not to Benefit 140 B6.813 Delayed or Interrupted Scaling B8.63 Nondiscrimination in Employment 140 Services 133 B8.64 Debarment and Suspension B6.814 Weighing Services 133 Certification 141 B6.82 Presentation for Scaling 133 B8.65 Contract Consistency With Other LawsPERFORMANCE Laws 141 B6.83 Scaling Other Products 133 B9.0 PERFORMANCE AND SETTLEMENT 141 B6.84 Accountability 133 B9.1 Performance Bond 141 B6.841 Route of Haul 134 B9.11 Bond Reduction 141 B6.842 Product Identification 134 B9.12 Letters of Credit 142 B6.85 Scaling Lost Product 134 B9.13 Temporary Bond Reduction 142 SAMPLE Reference Number Title Page B9.2 Disputes 142 B9.21 Time Limits for Submission of Claim 142 B9.22 Contract Documents 142 B9.3 Breach 143 B9.31 Termination for Breach 143 B9.4 Damages for Failure to Cut Complete Contract or Termination for Breach 143 B9.5 Settlement 144 B9.6 Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141144 SAMPLE
Appears in 1 contract
Samples: Integrated Resource Timber Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage (Timber) Claim Clearcutting Units Construct Continuous Scaling Services Contract Area Contract Area Map Contract Term Adjustment Contract Term Extension Contractor’s Operations Current Contract Rates Current Contract Value Current Unit Rates Design Change Excess Timber Value Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B2.31 B5.1 B6.81 B1.0 B1.1 B8.21 B8.23 B6.3 B3.1 B3.1 B5.251 B5.253 B4.53 B6.81 B4.217 B7.2 A4 B3.1 B2.1 B8.221 B6.81 B2.35 B7.42 Term Integrated Resource Account Intermittent Scaling Services Marked Negligent Fire Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Stewardship Credits Streamcourses Subcontractor Substantially Completed Technical Proposal Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Expenditure Utilization Standards Weighing Services Agreement Reference B4.2 B6.81 B2.35 B7.42 B6.31 B6.35 B7.41 B8.35 B2.3 B2.33 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B4.5 B6.5 B8.64 B5.23 B6.311 B5.1 A4 B3.1 B8.2 B4.2 B2.3 B2.34 B8.35 A2, B2.2 B6.814 Contract FS-2400-613, Pages 110 through 141 144 (06/200610/2019) CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141110 SAMPLE CONTENTS
Appears in 1 contract
Samples: Integrated Resource Timber Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) 110 CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 111 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141141 112
Appears in 1 contract
Samples: Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION ReceivedTRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141
Appears in 1 contract
Samples: Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) 110 SAMPLE CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 111 SAMPLE Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141141 112 SAMPLE
Appears in 1 contract
Samples: Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) SAMPLE CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141141 SAMPLE B1.0—SALE AREA SAMPLE
Appears in 1 contract
Samples: Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates B3.1 Schedule of Items B5.2 Current Contract Value B3.1 Shop Drawings B5.211 Current Unit Rates B5.251 Specified Roads B5.2 Design Change B5.253 Streamcourses B6.5 Extended Scaling Services B6.81 Subcontractor B8.64 Extension Deposit B4.217 Substantially Completed B5.23 Fire Precautionary Period B7.2 TemporaryRoads B5.1 Flat Rates A4 Tentative Rate A4 Included Timber B2.1 Termination Date B8.2 Indicated Advertised Rates B8.221 Timber Sale Account B4.2 Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units B2.3 Marked B2.35 Unrecovered Expenditures B8.35 Negligent Fire B7.42 Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) 110 SAMPLE CONTENTS Reference Reference Number Title Page Number Title Page B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA 113 B4.211 Downpayment 117 B1.1 Sale Area Map 113 B4.212 Advance Deposits 117 B1.2 Claims 113 B4.213 Periodic Payment Schedule 117 B2.0 TIMBER SPECIFICATIONS 113 B4.214 Deposits for Charges Subject to B2.1 Included Timber 113 Escalation 117 B2.11 Standard Timber Substandard Timber 113 B4.215 Deposits When Payment B2.12 SubstandardTimber 113 Guaranteed 117 B2.13 Damaged Timber 113 B4.216 Blanket Cash Deposits 117 B2.131 Damaged by Purchaser 113 B4.217 Extension Deposits 117 B2.132 Negligent or Willful Damage 113 B4.218 Cooperative Deposits 118 B2.133 Damaged by Catastrophe 113 B4.22 Temporary Reduction of B2.134 Minor Damage by Natural Causes 113 Downpayment 118 B2.14 Unintentionally Cut Timber Construction Timber 113 B4.23 Refund of Excess Cash 118 B2.15 ConstructionTimber 114 B4.24 Refund after Scaling Completed 118 B2.16 Other Material 114 B4.3 Payment Guaranteed by Xxxx or B2.2 Utilization and Removal of Included Deposited Securities 118 Timber 114 B4.31 Blanket Bond 118 B2.3 Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond 118 B2.31 Clearcutting Units 114 B4.4 Payments Not Received 118 B2.32 ConstructionClearing 114 B5.0 TRANSPORTATION FACILITIES 119 B2.33 Overstory Removal Units 114 B5.1 Authorization 119 B2.34 Understory Removal Units 114 B5.11 Requirements of Rights-of-Way 119 B2.35 Individual Trees 114 B5.12 Use of Roads by Purchaser 119 B2.36 Incompletely Marked Timber 114 B5.2 Specified Roads 119 B2.37 Minor Changes 114 B5.21 Engineering 120 B2.4 Volume Estimate 114 B5.211 Contract Plans 120 B2.41 Adjustment for Volume Deficit 114 B5.212 Construction Staking 120 B2.42 Adjustment for Excess Volume 114 B5.22 Material Delivery 121 B3.0 RATES OF PAYMENT 115 B5.23 Use of Partially Constructed Roads 121 B3.1 Current Contract Rates 115 B5.24 Estimated Cost 121 B3.2 Escalation Procedure 115 B5.25 Construction Cost Adjustment 121 B3.21 Unavailable Index 115 B5.251 Variation in Quantities 121 B3.3 Rate Redetermination 115 B5.252 Physical Change 121 B3.31 Rate Redetermination for B5.253 Design Change 122 Environmental Modification B3.32 Rate Redetermination after Catastrophic Damage 115 115 B5.26 B5.27 Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost 122 123 B3.33 Rate Redetermination for Market B5.3 Road Maintenance 123 B3.34 Change 116 EmergencyRate Redetermination 116 B5.4 B6.0 Use by Others OPERATIONS 123 123 B3.4 Other Payment Rates 116 B6.1 Representatives 123 B3.41 Material Not in A2 116 B6.11 Notices 124 B3.42 Timber Cut Through Mistake 116 B6.2 Improvements 124 B3.43 Designated Timber Cut But Not B6.21 Removal 124 Removed 116 B6.22 Protection of Improvements 124 B3.44 Undesignated Timber Damaged B6.221 Protection of Improvements Not Without Negligence 116 Owned by Forest Service 124 B4.1 Amount Payable for Timber 117 B6.31 Operating Schedule 125 B4.2 Timber Sale Account 117 B6.311 Plan of Operations 125 B4.21 Cash Deposits 117 B3.45 Undesignated Timber Unnecessarily Damaged or Negligently or Willfully B6.222 Protection of Property 124 B6.23 Protection of Land Survey Monuments 124 Cut 116 B6.24 Protection Measures Needed for B3.46 Liquidated Damages 116 Plants, Animals, Cultural Resources, B3.47 Defect Caused by Abnormal Delay 116 and Cave Resources 125 B4.0 PAYMENTS 117 B6.3 Control of Operations Operating Schedule 125 111 Reference Number Title Page Reference Number Title Page B6.312 Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 for Road B7.313 Equipment 132 Construction 125 125 125 125 Reference Number B6.312 B7.4 Fire Suppression Costs 132 B6.32 Protection of Residual Trees 126 B7.41 Operations Fire 132 B6.33 Safety 126 B7.42 Negligent Fire 132 B6.34 Sanitation and Servicing 126 B7.43 Other Fires on Sale Area 133 B6.341 Prevention of Oil Spills 126 B7.5 State Law 133 B6.342 HazardousSubstances 126 B7.6 Performance by Contractor 133 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 Equipment Cleaning 126 B8.0 OTHER CONDITIONS 133 B6.67 Erosion Control Structure Maintenance 129 B8.35 Out-of-Pocket Expenses 137 B6.7 Slash Disposal 129 B8.36 Termination for Market Change 137 B6.8 Scaling 129 B8.4 Performance by Other than Purchaser 137 B6.81 Scaling Services 129 B8.5 Sale of Other Materials 138 B6.811 Scaling Location 129 B8.6 Provisions Required by Statute 138 SAMPLE B6.631 Temporary Roads to Remain Open 129 B8.33 Contract Suspension and Modification 135 B6.64 Landings 129 B8.34 Contract Termination 135 B6.65 Skid Trails and Fire Lines 129 B8.341 Termination by Forest Service 136 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 Current Operating Areas 129 B8.342 Termination by Purchaser 136 B6.812 B6.813 Scaling Adjustments 130 B8.61 Covenant against Contingent Fees 138 B6.813 Delayed or Interrupted Scaling 130 B8.62 Officials Not to Benefit 138 Services 130 B8.63 Nondiscrimination in Employment 138 B6.814 Weighing Services 130 B8.64 Debarment and Suspension B6.82 Presentation for Scaling 130 Certification 138 B6.83 Scaling Other Products 130 B8.65 Contract Consistency With Other Laws 139 B6.84 Accountability 131 B9.0 PERFORMANCE AND SETTLEMENT 139 B6.841 Route of Haul 131 B9.1 Performance Bond 139 B6.842 Product Identification 131 B9.11 Bond Reduction 139 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification B7.312 Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions SubstitutePrecautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations SuspendOperations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 B9.5 Settlement 141 132 B9.6 Contract Closure 141 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141B9.12
Appears in 1 contract
Samples: Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) DRAFT CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141141 DRAFT
Appears in 1 contract
Samples: Service Timber Sale Contract
INDEX TO TERMS. Term Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates Intermittent Scaling Services Marked Negligent Fire Reference A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season Off-Road Equipment Operations Fire Out-of-Pocket Expenses Overstory Removal Units Plans Purchaser’s Operations Required Deposits Sale Area Sale Area Map Scaling Schedule of Items Shop Drawings Specified Roads Streamcourses Subcontractor Substantially Completed Temporary Roads Tentative Rate Termination Date Timber Sale Account Understory Removal Units Unrecovered Expenditures Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Contract FS-2400-6, Pages 110 through 141 (06/2006) Sample CONTENTS Reference Number B1.0 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Area Map Claims TIMBER SPECIFICATIONS Included Timber Standard Timber Substandard Timber Damaged Timber Damaged by Purchaser Negligent or Willful Damage Damaged by Catastrophe Minor Damage by Natural Causes Unintentionally Cut Timber Construction Timber Other Material Utilization and Removal of Included Timber Timber Designations Clearcutting Units Construction Clearing Overstory Removal Units Understory Removal Units Individual Trees Incompletely Marked Timber Minor Changes Volume Estimate Adjustment for Volume Deficit Adjustment for Excess Volume RATES OF PAYMENT Current Contract Rates Escalation Procedure Unavailable Index Rate Redetermination Rate Redetermination for Environmental Modification Rate Redetermination after Catastrophic Damage Rate Redetermination for Market Change Emergency Rate Redetermination Other Payment Rates Material Not in A2 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost Road Maintenance Use by Others OPERATIONS Representatives Notices Improvements Removal Protection of Improvements Protection of Improvements Not Owned by Forest Service Protection of Property Protection of Land Survey Monuments Protection Measures Needed for Plants, Animals, Cultural Resources, and Cave Resources Control of Operations Operating Schedule Plan of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road Construction Protection of Residual Trees Safety Sanitation and Servicing Prevention of Oil Spills Hazardous Substances Equipment Cleaning Acceptance of Work Acceptance of Specified Roads Conduct of Logging Felling and Bucking Felling in Clearings Xxxxx Heights Bucking Lengths Limbing Skidding and Yarding Rigging Landings and Skid Trails Skidding on Roads Arches and Dozer Blades Streamcourse Protection Erosion Prevention and Control Meadow Protection Wetlands Protection Temporary Roads Temporary Roads to Remain Open Landings Skid Trails and Fire Lines Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses Termination for Market Change Performance by Other than Purchaser Sale of Other Materials Provisions Required by Statute Covenant against Contingent Fees Officials Not to Benefit Nondiscrimination in Employment Debarment and Suspension Certification Contract Consistency With Other LawsPERFORMANCE AND SETTLEMENT Performance Bond Bond Reduction Letters of Credit Temporary Bond Reduction Disputes Time Limits for Submission of Claim Contract Documents Breach Termination for Breach Damages for Failure to Cut or Termination for Breach Settlement Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141141 Sample
Appears in 1 contract
Samples: Service Timber Sale Contract
INDEX TO TERMS. Term Reference Term Reference Advertised Rates Base Index Base Rates Bid Premium Rates Bid Rates Catastrophic Damage Claim Clearcutting Units Continuous Scaling Services Contract Term Adjustment Contract Term Extension Current Contract Rates Current Contract Value Current Unit Rates Design Change Extended Scaling Services Extension Deposit Fire Precautionary Period Flat Rates Included Timber Indicated Advertised Rates A4 A4 A4 Integrated Resource Account Intermittent Scaling Services Marked B4.2 B6.81 B2.35 Bid Premium Rates A4 Negligent Fire Reference B7.42 Bid Rates A4 A4 A4 A4 A4 B2.133 B9.2 B2.3 B6.81 B8.21 B8.23 B3.1 B3.1 B5.251 B5.253 B6.81 B4.217 B7.2 A4 B2.1 B8.221 B6.81 B2.35 B7.42 Term Normal Operating Season B6.31 Catastrophic Damage (Timber) B2.133 Off-Road Equipment B6.35 Claim B9.2 Operations Fire B7.41 Clearcutting Units B2.31 Out-of-Pocket Expenses B8.35 Construct B5.1 Overstory Removal Units B2.33 Continuous Scaling Services B6.81 Plans Purchaser’s Operations B5.211 Contract Area B1.0 Required Deposits Sale Area Sale A4 Contract Area Map B1.1 Scaling B6.8 Contract Term Adjustment B8.21 Schedule of Items B5.2 Contract Term Extension B8.23 Shop Drawings B5.211 Contractor’s Operations B6.3 Specified Roads B5.2 Current Contract Rates B3.1 Stewardship Credits B4.5 Current Contract Value B3.1 Streamcourses B6.5 Current Unit Rates B5.251 Subcontractor B8.64 Design Change B5.253 Substantially Completed B5.23 Excess Timber Value B4.53 Technical Proposal B6.311 Extended Scaling Services B6.81 Temporary Roads B5.1 Extension Deposit B4.217 Tentative Rate B3.1 Fire Precautionary Period B7.2 Termination Date Timber Sale Account B8.2 Flat Rates B3.1 Understory Removal Units B2.34 Included Timber B2.1 Unrecovered Expenditures Expenditure B8.35 Indicated Advertised Rates B8.221 Utilization Standards Reference B6.31 B6.35 B7.41 B8.35 B2.3 B5.211 B6.3 A4 B1.1 B1.1 B6.8 B5.2 B5.211 B5.2 B6.5 B8.64 B5.23 B5.1 A4 B8.2 B4.2 B2.3 B8.35 A2, B2.2 Weighing Services Agreement B6.814 Contract FS-2400-613, Pages 110 through 141 144 (06/200610/2019) 110 CONTENTS Reference Reference SAMPLE Number Title Page Number Title Page B1.0 CONTRACT AREA 114 B4.1 Amount Payable for Timber 118 B1.1 B1.2 B2.0 B2.1 B2.11 B2.12 B2.13 B2.131 B2.132 B2.133 B2.134 B2.14 B2.15 B2.16 B2.2 B2.3 B2.31 B2.32 B2.33 B2.34 B2.35 B2.36 B2.37 B2.4 B2.41 B2.42 B3.0 B3.1 B3.2 B3.21 B3.3 B3.31 B3.32 B3.33 B3.34 B3.4 B3.41 B3.42 B3.43 B3.44 B3.45 B3.46 B3.47 B4.0 B4.1 B4.2 B4.21 Title SALE AREA Sale Contract Area Map 114 B4.2 Integrated Resource Account 118 B1.2 Claims 114 B4.21 Cash Deposits 118 B2.0 TIMBER SPECIFICATIONS 114 B4.211 Downpayment 118 B2.1 Included Timber 114 B4.212 Advanced Deposits 118 B2.11 Standard Timber 114 B4.213 Periodic Payment Schedule 119 B2.12 Substandard Timber 114 B4.214 Deposits for Charges Subject to B2.13 Damaged Timber 114 Escalation 119 B2.131 Damaged by Purchaser Contractor 114 B4.215 Deposits When Payment Guaranteed 119 B2.132 Negligent or Willful Damage Damaged 114 B4.216 Blanket Cash Deposits 119 B2.133 Damage by Catastrophe 114 B4.217 Extension Deposits 119 B2.134 Minor Damage by Natural Causes 115 B4.218 Cooperative Deposits 119 B2.14 Unintentionally Cut Timber 115 B4.22 Temporary Reduction of Downpayment 119 B2.15 Construction Timber 115 B4.23 Refund of Excess Cash 119 B2.16 Other Material 115 B4.24 Refund after Scaling Completed 120 B2.2 Utilization and Removal of Included Timber 115 B4.3 Payment Guaranteed by Bond or Deposited Securities 120 B2.3 Timber Designations 115 B4.31 Blanket Bond 120 B2.31 Clearcutting Units 115 B4.32 Letters of Credit for Payment Bond 120 B2.32 Construction Clearing 115 B4.4 Payments Not Received 120 B2.33 Overstory Removal Units 115 B4.5 Stewardship Credits 121 B2.34 Understory Removal Units 115 B4.51 Progress Estimates 121 B2.35 Individual Trees 115 B4.52 Excess Stewardship Credits 121 B2.36 Incompletely Marked Timber 115 B4.53 Excess Timber Value 121 B2.37 Minor Changes 115 B4.54 Cash Payment for Stewardship B2.4 Volume Estimate 115 Projects 121 B2.41 Adjustment for Volume Deficit 115 B4.55 Refund of Unused Stewardship Credits 121 B2.42 Adjustment for Excess Volume 116 B5.0 TRANSPORTATION FACILITIES 121 B3.0 RATES OF PAYMENT 116 B5.1 Authorization 121 B3.1 Current Contract Rates 116 B5.11 Requirements of Rights-of-Way 121 B3.2 Escalation Procedure 116 B5.12 Use of Roads by Contractor 121 B3.21 Unavailable Index 116 B5.2 Specified Roads 121 B3.3 Rate Redetermination 116 B5.21 Engineering 122 B3.31 Rate Redetermination for B5.211 Contract Plans 122 Environmental Modification 117 B5.212 Construction Staking 123 B3.32 Rate Redetermination after B5.22 Material Delivery 123 Catastrophic Damage 117 B5.23 Use of Partially Constructed Roads 123 B3.33 Rate Redetermination for Market B5.24 Estimated Cost 123 Change 117 B5.25 Construction Cost Adjustment 123 B3.34 Emergency Rate Redetermination 117 B5.251 Variation in Quantities 123 B3.4 Other Payment Rates 117 B5.252 Physical Change 124 B3.41 Material Not in A2 117 B5.253 Design Change 124 B3.42 B3.43 Timber Cut Through Mistake Designated Timber Cut But Not Removed Undesignated Timber Damaged Without Negligence Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut Liquidated Damages Defect Caused by Abnormal Delay PAYMENTS Amount Payable for Timber Timber Sale Account Cash Deposits Page 113 113 113 113 113 113 113 113 113 113 113 113 113 114 114 114 114 114 114 114 114 114 114 114 114 114 114 115 115 115 115 115 115 115 116 116 116 116 116 116 116 116 116 116 117 117 117 117 Reference Number B4.211 B4.212 B4.213 B4.214 B4.215 B4.216 B4.217 B4.218 B4.22 B4.23 B4.24 B4.3 B4.31 B4.32 B4.4 B5.0 B5.1 B5.11 B5.12 B5.2 B5.21 B5.211 B5.212 B5.22 B5.23 B5.24 B5.25 B5.251 B5.252 B5.253 118 B5.26 B5.27 B5.3 B5.4 B6.0 B6.1 B6.11 B6.2 B6.21 B6.22 B6.221 B6.222 B6.23 B6.24 B6.3 B6.31 B6.311 Title Downpayment Advance Deposits Periodic Payment Schedule Deposits for Charges Subject to Escalation Deposits When Payment Guaranteed Blanket Cash Deposits Extension Deposits Cooperative Deposits Temporary Reduction of Downpayment Refund of Excess Cash Refund after Scaling Completed Payment Guaranteed by Bond or Deposited Securities Blanket Bond Letters of Credit for Payment Bond Payments Not Received TRANSPORTATION FACILITIES Authorization Requirements of Rights-of-Way Use of Roads by Purchaser Specified Roads Engineering Contract Plans Construction Staking Material Delivery Use of Partially Constructed Roads Estimated Cost Construction Cost Adjustment Variation in Quantities Physical Change Design Change Alternate Facilities Temporary Credit for Unamortized Specified Road Construction Cost 125 125 B3.44 Undesignated Timber Damaged B5.3 Road Maintenance 125 Without Negligence 118 B5.4 Use by Others 125 B3.45 Undesignated Timber Unnecessarily B6.0 OPERATIONS 126 Damaged or Negligently or Willfully Cut 118 B6.1 Representatives 126 B6.11 Notices 126 B3.46 Liquidated Damages 118 B6.2 Improvements 126 B3.47 Defect Caused by Abnormal Delay 118 B6.21 Removal 126 B4.0 PAYMENT 118 B6.22 Protection of Improvements 126 Reference Reference Number Title Page Number Title Page B6.221 Protection of Improvements Not 127 Owned by Forest Service 127 B6.851 Scaling Lost Sample Loads 134 B6.222 Protection of Property 127 B6.86 Scale Reports 135 B6.23 Protection of Land Survey Monuments 127 B6.9 Stewardship Projects 135 B6.24 Protection Measures Needed for B7.0 FIRE PRECAUTIONS AND CONTROL 135 Plants, Animals, Cultural Resources, B7.1 Plans 135 and Cave Resources 127 B7.2 Fire Precautions 135 B6.3 Control of Operations 128 B7.21 Substitute Precautions 135 B6.31 Operating Schedule Plan 128 B7.22 Emergency Precautions 135 B6.311 Inclusion of Operations Page 117 117 117 117 117 117 117 118 118 118 118 118 118 118 118 119 119 119 119 119 120 120 120 121 121 121 121 121 121 122 122 123 123 123 123 123 124 124 124 124 124 124 124 125 125 125 125 Reference Number Technical Proposal 128 B7.3 Fire Control 135 B6.312 B6.32 B6.33 B6.34 B6.341 B6.342 B6.35 B6.36 B6.361 B6.4 B6.41 B6.411 B6.412 B6.413 B6.414 B6.42 B6.421 B6.422 B6.423 B6.424 B6.5 B6.6 B6.61 B6.62 B6.63 B6.631 B6.64 B6.65 B6.66 B6.67 B6.7 B6.8 B6.81 B6.811 B6.812 B6.813 B6.814 B6.82 B6.83 B6.84 B6.841 B6.842 B6.85 B6.851 B6.86 B6.9 B7.0 B7.1 B7.2 B7.21 B7.22 B7.3 B7.31 B7.311 B7.312 Title Plan of Operations for Road B7.31 Contractor’s Reinforcement Obligations 135 Construction 128 B7.311 Suspend Operations 135 B6.32 Protection of Residual Trees 128 B7.312 Personnel 135 B6.33 Safety 128 B7.313 Equipment 135 B6.34 Sanitation and Servicing 129 B7.4 Fire Suppression Costs 135 B6.341 Prevention of Oil Spills 129 B7.41 Operations Fire 135 B6.342 Hazardous Substances 129 B7.42 Negligent Fire 136 B6.35 Equipment Cleaning 129 B7.43 Other Fires on Contract Area 136 B6.36 Acceptance of Work 130 B7.5 State Law 136 B6.361 B6.4 Acceptance of Specified Roads Conduct of Logging 130 130 B7.6 B8.0 Performance by Contractor OTHER CONDITIONS 136 136 B6.41 Felling and Bucking 130 B8.1 Title and Liability 136 B6.411 Felling in Clearings 130 B8.11 Title Passage 136 B6.412 Xxxxx Heights 130 B8.12 Liability for Loss 136 B6.413 Bucking Lengths 130 B8.2 Period of Contract 136 B6.414 Limbing 130 B8.21 Contract Term Adjustment 136 B6.42 Skidding and Yarding 130 B8.211 Delay in Reconstruction of B6.421 Rigging 131 Processing Facilities 137 B6.422 Landings and Skid Trails 131 B8.212 Market-Related Contract Term B6.423 Skidding on Roads 131 Addition 137 B6.424 Arches and Dozer Blades 131 B8.22 Termination for Catastrophe 137 B6.5 Streamcourse Protection 131 B8.221 Termination by Contractor 137 B6.6 Erosion Prevention and Control 131 B8.222 Termination by Forest Service 137 B6.61 Meadow Protection 131 B8.23 Contract Term Extension 137 B6.62 Wetlands Protection 131 B8.3 Contract Modification 138 B6.63 Temporary Roads 131 B8.31 Changed Conditions 138 B6.631 Temporary Roads to Remain Open 131 B8.32 Modification for Catastrophe 138 B6.64 Landings 132 B8.33 Contract Suspension and Modification 138 B6.65 Skid Trails and Fire Lines 132 B8.34 Contract Termination 139 B6.66 Current Operating Areas Erosion Control Structure Maintenance Slash Disposal Scaling Scaling Services Scaling Location Scaling Adjustments Delayed or Interrupted Scaling Services Weighing Services Presentation for Scaling Scaling Other Products Accountability Route of Haul Product Identification Scaling Lost Products Scaling Lost Sample Loads Scale Reports Records FIRE PRECAUTIONS AND CONTROL Plans Fire Precautions Substitute Precautions Emergency Precautions Fire Control Purchaser’s Reinforcement Obligations Suspend Operations Personnel Page 125 126 126 126 126 126 126 127 127 127 127 128 128 128 128 128 128 128 128 128 128 128 128 129 129 129 129 129 129 129 129 129 129 129 130 130 130 130 130 130 131 131 131 131 131 132 132 132 132 132 132 132 132 132 132 132 Reference Number B7.313 B7.4 B7.41 B7.42 B7.43 B7.5 B7.6 B8.0 B8.1 B8.11 B8.12 B8.2 B8.21 B8.211 B8.212 B8.22 B8.221 B8.222 B8.23 B8.231 B8.3 B8.31 B8.32 B8.33 B8.34 B8.341 B8.342 B8.35 B8.36 B8.4 B8.5 B8.6 B8.61 B8.62 B8.63 B8.64 B8.65 B9.0 B9.1 B9.11 B9.12 B9.13 B9.2 B9.21 B9.22 B9.3 B9.31 B9.4 B9.5 B9.6 Title Equipment Fire Suppression Costs Operations Fire Negligent Fire Other Fires on Sale Area State Law Performance by Contractor OTHER CONDITIONS Title and Liability Title Passage Liability for Loss Period of Contract Contract Term Adjustment Delay in Reconstruction of Processing Facilities Market-Related Contract Term Addition Termination for Catastrophe Termination by Purchaser Termination by Forest Service Contract Term Extension Conditions for Contract Term Extension Contract Modification Changed Conditions Modification for Catastrophe Contract Suspension and Modification Contract Termination Termination by Forest Service Termination by Purchaser Out-of-Pocket Expenses 139 B6.67 Erosion Control Structure Maintenance 132 B8.36 Termination for Market Change 140 B6.7 Slash Disposal 132 B8.4 Performance by Other than Purchaser Contractor 140 B6.8 Scaling 132 B8.5 Sale of Other Materials 140 B6.81 Scaling Services 132 B8.6 Provisions Required by Statute 140 B6.811 Scaling Locations 132 B8.61 Covenant against Contingent Fees 140 B6.812 Scaling Adjustments 132 B8.62 Officials Not to Benefit 140 B6.813 Delayed or Interrupted Scaling B8.63 Nondiscrimination in Employment 140 Services 133 B8.64 Debarment and Suspension B6.814 Weighing Services 133 Certification 141 B6.82 Presentation for Scaling 133 B8.65 Contract Consistency With Other LawsPERFORMANCE Laws 141 B6.83 Scaling Other Products 133 B9.0 PERFORMANCE AND SETTLEMENT 141 B6.84 Accountability 133 B9.1 Performance Bond 141 B6.841 Route of Haul 134 B9.11 Bond Reduction 141 B6.842 Product Identification 134 B9.12 Letters of Credit 142 B6.85 Scaling Lost Product 134 B9.13 Temporary Bond Reduction 142 SAMPLE Reference Number Title Page B9.2 Disputes 142 B9.21 Time Limits for Submission of Claim 142 B9.22 Contract Documents 142 B9.3 Breach 143 B9.31 Termination for Breach 143 B9.4 Damages for Failure to Cut Complete Contract or Termination for Breach 143 B9.5 Settlement 144 B9.6 Contract Closure Page 000 000 000 132 133 133 133 133 133 133 133 133 133 134 134 134 134 134 134 134 135 135 135 135 135 136 136 137 137 137 138 138 138 138 138 138 139 139 139 139 139 139 139 140 140 140 140 141 141 141144 SAMPLE
Appears in 1 contract
Samples: Resource Timber Contract