Common use of Inspection and On-Going Compliance Clause in Contracts

Inspection and On-Going Compliance. 4.1. All initial physical inspections and inspections of the Member’s documents must be verified by FKEC. If the inspection is delayed at the Member’s request, the Member shall contact FKEC to reschedule an inspection. Physical inspections and inspections of documents must be completed and approved by FKEC prior to commencement of service of the Member- owned renewable generation system. 4.2. Any inspection or observation by FKEC shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by FKEC of the safety, durability, suitability, or reliability of the Member-owned Renewable Generation or any associated control, protective, and safety devices owned or controlled by the Member, or the quality of power produced by the Member-owned renewable generation. 4.3. FKEC shall have the right to inspect Member-owned renewable generation and its component equipment to ensure compliance with this Interconnection Agreement. FKEC’s system inspections shall include, but shall not be limited to: a) any installed manual disconnect switch, as applicable; b) FKEC’s metering equipment; c) any additional metering equipment installed by Member, and d) Member utility-interactive inverter, protective device or other similar devices for compliance with applicable code and standards, as described in this Interconnection Agreement. 4.4. FKEC shall also have the right to review Member Documents to ensure compliance with this Interconnection Agreement. FKEC shall have the right to, at a minimum, review: a) technical design parameters of the system and the manufacturer’s installation; b) operation and maintenance instructions to ensure compliance with IEEE and UL standards; c) local inspection and certifications; and d) any other documents associated with specific installations. 4.5. FKEC will provide Member with as much notice as reasonably practicable; either in writing, email, facsimile or by phone as to when FKEC will conduct inspection and/or document review. Upon reasonable notice, or at any time without notice in the event of an emergency or hazardous condition, FKEC shall have access to the Member’s premises for the purpose of accessing the manual disconnect switch, performing an inspection or disconnection, or, if necessary, to meet FKEC’s legal obligation to provide service to its Members.

Appears in 1 contract

Samples: Interconnection Agreement

AutoNDA by SimpleDocs

Inspection and On-Going Compliance. 4.1. 4.1 All initial physical inspections and inspections inspection of the Member’s documents must be verified by FKEC. If the inspection is delayed at the Member’s request, the Member shall contact FKEC to reschedule an inspection. Physical inspections and inspections inspection of documents must be completed and approved by FKEC prior to commencement of service of the Member- owned renewable generation system. 4.2. 4.2 Any inspection or observation by FKEC shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by FKEC of the safety, durability, suitability, or reliability of the Member-owned Renewable Generation or any associated control, protective, and safety devices owned or controlled by the Member, Member or the quality of power produced by the Member-owned renewable generation. 4.3. 4.3 FKEC shall have the right to inspect Member-owned renewable generation and its component equipment to ensure compliance with this Interconnection Agreement. FKEC’s system inspections shall include, but shall not be limited to: a) any installed manual disconnect switch, as applicable; b) FKEC’s metering equipment; c) any additional metering equipment installed by Member, and d) Member utility-interactive inverter, protective device or other similar devices for compliance with to applicable code and standards, as described in this Interconnection Agreement. 4.4. 4.4 FKEC shall also have the right to review Member Documents to ensure compliance with this Interconnection Agreement. FKEC shall have the right to, at a minimum, review: a) technical design parameters of the system and the manufacturer’s installation; b) operation and maintenance instructions to ensure compliance with IEEE and UL standards; c) local inspection and certifications; and d) any other documents associated with specific installations. 4.5. 4.5 FKEC will provide Member with as much notice as reasonably practicable; either in writing, email, facsimile or by phone as to when FKEC will conduct inspection and/or document review. Upon reasonable notice, or at any time without notice in the event of an emergency or hazardous condition, FKEC shall have access to the Member’s premises for the purpose of accessing the manual disconnect switch, performing an inspection or disconnection, or, if necessary, to meet FKEC’s legal obligation to provide service to its Members.

Appears in 1 contract

Samples: Interconnection Agreement

Inspection and On-Going Compliance. 4.1. All initial physical inspections and inspections FKEC will provide Member with as much notice as reasonably practicable; either in writing, e-mail, facsimile or by phone as to when FKEC may conduct inspection and/or document review. Upon reasonable notice, or at any time without notice in the event of an emergency or hazardous condition, FKEC shall have access to the Member's premises for the purpose of accessing the manual disconnect switch, performing an inspection or disconnection, or, if necessary, to meet FKEC’s documents must be verified by FKEC. If the inspection is delayed at the Member’s request, the Member shall contact FKEC legal obligation to reschedule an inspection. Physical inspections and inspections of documents must be completed and approved by FKEC prior provide service to commencement of service of the Member- owned renewable generation systemits Members. 4.2. Any inspection or observation by FKEC shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by FKEC of the safety, durability, suitability, or reliability of the Member-owned Renewable Generation or any associated control, protective, and safety devices owned or controlled by the Member, or the quality of power produced by the Member-owned renewable generation. 4.3. FKEC shall have the right to inspect Member-owned renewable generation and its component equipment to ensure compliance with this Interconnection Agreement. FKEC’s system inspections shall include, but shall not be limited to: a) any installed manual disconnect switch, as applicable; b) FKEC’s metering equipment; c) any additional metering equipment installed by Member, and d) Member utility-interactive inverter, protective device or other similar devices for compliance with applicable code and standards, as described in this Interconnection Agreement. 4.4. FKEC shall also have the right to review Member Documents to ensure compliance with this Interconnection Agreement. FKEC shall have the right to, at a minimum, review: a) technical design parameters of the system and the manufacturer’s installation; b) operation and maintenance instructions to ensure compliance with IEEE and UL standards; c) local inspection and certifications; and d) any other documents associated with specific installations. 4.5. FKEC will provide Member with as much notice as reasonably practicable; either in writing, email, facsimile or by phone as to when FKEC will conduct inspection and/or document review. Upon reasonable notice, or at any time without notice in the event of an emergency or hazardous condition, FKEC shall have access to the Member’s premises for the purpose of accessing the manual disconnect switch, performing an inspection or disconnection, or, if necessary, to meet FKEC’s legal obligation to provide service to its Members.

Appears in 1 contract

Samples: Interconnection Agreement

AutoNDA by SimpleDocs

Inspection and On-Going Compliance. 4.1. At FKEC’s election, FKEC shall have the right to inspect the Tier 2 Member-owned renewable generation. All initial physical inspections and inspections inspection of the Member’s documents must be verified completed by FKECFKEC within thirty (30) calendar days of receipt of the Member’s executed Interconnection Agreements. If the inspection is inspections are delayed at the Member’s request, the Member shall contact FKEC to reschedule an inspection. FKEC shall reschedule the inspection within ten (10) business days of the Member’s request. Physical inspections and inspections inspection of documents must be completed and approved by FKEC prior to commencement of service of the Member- owned renewable generation system. 4.2. Any inspection or observation by FKEC shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by FKEC of the safety, durability, suitability, or reliability of the Member-owned Renewable Generation or any associated control, protective, and safety devices owned or controlled by the Member, Member or the quality of power produced by the Member-owned renewable generation. 4.3. FKEC shall have the right to inspect Member-owned renewable generation and its component equipment to ensure compliance with this Interconnection Agreement. FKEC’s system inspections shall include, but shall not be limited to: a) any installed manual disconnect switch, as applicable; b) FKEC’s metering equipment; c) any additional metering equipment installed by Member, and d) Member utility-interactive inverter, protective device or other similar devices for compliance with to applicable code and standards, as described in this Interconnection Agreement. 4.4. FKEC shall also have the right to review Member Documents to ensure compliance with this Interconnection Agreement. FKEC shall have the right to, at a minimum, review: a) technical design parameters of the system and the manufacturer’s installation; b) operation and maintenance instructions to ensure compliance with IEEE and UL standards; c) local inspection and certifications; and d) any other documents associated with specific installations. 4.5. FKEC will provide Member with as much notice as reasonably practicable; either in writing, email, facsimile or by phone as to when FKEC will may conduct inspection and/or document review. Upon reasonable notice, or at any time without notice in the event of an emergency or hazardous condition, FKEC shall have access to the Member’s premises for the purpose of accessing the manual disconnect switch, performing an inspection or disconnection, or, if necessary, to meet FKEC’s legal obligation to provide service to its Members.

Appears in 1 contract

Samples: Interconnection Agreement