Inspection of Village Electrification Materials. The materials which have been identified for pre-dispatch inspection at manufacture premises is as follows: i. Distribution Transformer, ii. Overhead Conductor, iii. Energy Meter, iv. Pole, v. Insulators, vi. Cables, At least one type from each of the aforesaid 6 (six) materials to be utilized in substations and villages’ electrification shall be inspected by the RQM as per MQP. The inspection/testing/witnessing of acceptance tests shall be as per approved Drawings/Technical Specifications/Datasheet/GTP/ and applicable national & international standard.