Instrumentation/Control Systems Sample Clauses

Instrumentation/Control Systems. TANK CONTRACTOR shall recommend the necessary instrumentation and controls required to safely operate and protect each of the storage tanks. These recommendations shall be submitted to PURCHASER and shall include, as a minimum but without limitation, the following: • Tank Data Acquisition System (see below); • Tank wall temperature sensors (Cool Down); • Tank bottom temperature sensors (Cool Down); • Outer tank floor and suspended deck low temperature sensors; • Density/level/temperature sensor (servo type); • Tank level sensors (redundant, servo type); • High level switch; • Tank pressure transmitter (redundant); • Tank temperature profile sensors; • Vapor space temperature sensors; • Inner tank movement monitoring system; • Tank pressure/vacuum relief valves.** ** It is the TANK CONTRACTOR’s responsibility to size the pressure/vacuum relief valves. All electronic instruments shall be designed and wired to TANK CONTRACTOR-supplied junction boxes located at grade, 20 feet horizontally from the base of the tank (i.e. within the Battery Limits) and include: • Cable trays and supports; • Installation materials, including cables, tubes, conduits, junction boxes, etc. TANK CONTRACTOR shall provide calculations and certification for pressure/vacuum relief valves. TANK CONTRACTOR shall be responsible for installing control valves and other instrumentation shown within the boundary limits of TANK CONTRACTOR’s package on the referenced P&ID’s. TANK CONTRACTOR shall clearly identify the location and physical interconnection of this equipment on approval drawings submitted to PURCHASER. TANK CONTRACTOR shall design and supply running instrument air sub-headers (with isolation valves for take-offs) from TANK CONTRACTOR Battery Limits to those areas requiring this service. TANK CONTRACTOR shall perform calibration tests for all instruments provided by TANK CONTRACTOR or any Subcontractor or Sub-subcontractor for the Phase 2 Tanks. TANK CONTRACTOR shall provide additional gas detection instrumentation to cover the air gap below the elevated slab. A minimum of 8 gas detectors per tank shall be furnished. The gas detectors shall be wired to the junction boxes at the Battery Limits. TANK CONTRACTOR shall provide complete and comprehensive testing procedures for all equipment and systems provided. TANK CONTRACTOR shall develop as part of this Scope of Work the following information, as a minimum but without limitation: • ISA (Instrument Society of America) data sheets for a...
AutoNDA by SimpleDocs
Instrumentation/Control Systems. Test and install all equipment and materials, including those items supplied by PURCHASER in order to provide a complete and operating control and instrumentation system per this “Exhibit D.” • Install cable and complete all cable terminations between instruments and control panels/junction boxes within TANK CONTRACTOR’s battery limit. • Install instrument air pipe and tubing, valves, and tube fittings, as required. • All cables shall be supported in cable tray or in channels. • Inspect, calibrate and test all transmitting instruments and process switches. • Perform continuity loop checks for each instrument loop in coordination with and witnessed by PURCHASER. • TANK CONTRACTOR shall maintain all test and calibration documentation and turn over such documentation upon final acceptance of the Work. • Complete instrumentation, data acquisition, and communication interface units shall be configured and tested by TANK CONTRACTOR and witnessed and accepted by PURCHASER.

Related to Instrumentation/Control Systems

  • Management and Control Systems Grantee will: 1. maintain an appropriate contract administration system to ensure that all terms, conditions, and specifications are met during the term of the contract through the completion of the closeout procedures. 2. develop, implement, and maintain financial management and control systems that meet or exceed the requirements of Uniform Statewide Accounting System (UGMS). Those requirements and procedures include, at a minimum, the following: i. Financial planning, including the development of budgets that adequately reflect all functions and resources necessary to carry out authorized activities and the adequate determination of costs; ii. Financial management systems that include accurate accounting records that are accessible and identify the source and application of funds provided under each Contract of this Contract, and original source documentation substantiating that costs are specifically and solely allocable to a Contract and its Contract and are traceable from the transaction to the general ledger; iii. Effective internal and budgetary controls; iv. Comparison of actual costs to budget; determination of reasonableness, allowableness, and allocability of costs; v. Timely and appropriate audits and resolution of any findings; vi. Billing and collection policies; and vii. Mechanism capable of billing and making reasonable efforts to collect from clients and third parties.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.

  • CONTROL SYSTEM (a) SELLER shall provide and maintain a quality control system to an industry recognized Quality Standard and in compliance with any other specific quality requirements identified in this Contract. (b) Records of all quality control inspection work by SELLER shall be kept complete and available to LOCKHEED XXXXXX and its customers.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Electronic and Information Resources Accessibility and Security Standards a. Applicability: The following Electronic and Information Resources (“EIR”) requirements apply to the Contract because the Grantee performs services that include EIR that the System Agency's employees are required or permitted to access or members of the public are required or permitted to access. This Section does not apply to incidental uses of EIR in the performance of the Agreement, unless the Parties agree that the EIR will become property of the State of Texas or will be used by HHSC’s clients or recipients after completion of the Agreement. Nothing in this section is intended to prescribe the use of particular designs or technologies or to prevent the use of alternative technologies, provided they result in substantially equivalent or greater access to and use of a Product.

  • Compliance Control Services (1) Support reporting to regulatory bodies and support financial statement preparation by making the Fund's accounting records available to the Trust, the Securities and Exchange Commission (the “SEC”), and the independent accountants. (2) Maintain accounting records according to the 1940 Act and regulations provided thereunder. (3) Perform its duties hereunder in compliance with all applicable laws and regulations and provide any sub-certifications reasonably requested by the Trust in connection with any certification required of the Trust pursuant to the Xxxxxxxx-Xxxxx Act of 2002 (the “SOX Act”) or any rules or regulations promulgated by the SEC thereunder, provided the same shall not be deemed to change USBFS’s standard of care as set forth herein. (4) Cooperate with the Trust’s independent accountants and take all reasonable action in the performance of its obligations under this Agreement to ensure that the necessary information is made available to such accountants for the expression of their opinion on the Fund’s financial statements without any qualification as to the scope of their examination.

  • Technical Security Controls 35 a. Workstation/Laptop encryption. All workstations and laptops that store PHI COUNTY 36 discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of 37 COUNTY either directly or temporarily must be encrypted using a FIPS 140-2 certified algorithm which 1 is 128bit or higher, such as AES. The encryption solution must be full disk unless approved by the 2 COUNTY.

  • Implementation Report Within 150 days after the Effective Date, Ensign Group shall submit a written report to OIG summarizing the status of its implementation of the requirements of this CIA (Implementation Report). The Implementation Report shall, at a minimum, include: 1. the name, address, phone number, and position description of the Compliance Officer required by Section III.A, and a summary of other noncompliance job responsibilities the Compliance Officer may have; 2. the names and positions of the members of the Compliance Committee required by Section III.A; 3. the names and positions of the members of the Board of Directors who are responsible for satisfying the Board of Directors compliance obligations described in Section III.A.3; 4. a copy of Ensign Group’s Code of Conduct required by Section III.B.1; 5. the number of individuals required to complete the Code of Conduct certification required by Section III.B.1, the percentage of individuals who have completed such certification, and an explanation of any exceptions (the documentation supporting this information shall be available to OIG upon request); 6. a summary of all Policies and Procedures required by Section III.B (copies of the Policies and Procedures shall be made available to OIG upon request); 7. the following information regarding each type of training required by Section III.C: a. a description of such training, including a summary of the topics covered, the length of sessions, and a schedule of training sessions; b. the number of individuals required to be trained, percentage of individuals actually trained, and an explanation of any exceptions. A copy of all training materials and the documentation supporting this information shall be made available to OIG upon request. 8. a description of the Disclosure Program required by Section III.E; 9. the following information regarding the IRO(s): (a) identity, address, and phone number; (b) a copy of the engagement letter; (c) information to demonstrate that the IRO has the qualifications outlined in Appendix A to this CIA; (d) a summary and description of any and all current and prior engagements and agreements between Ensign Group and the IRO; and (e) a certification from the IRO regarding its professional independence and objectivity with respect to Ensign Group; 10. a description of the process by which Ensign Group fulfills the requirements of Section III.F regarding Ineligible Persons; 11. a list of all of Ensign Group’s locations (including locations and mailing addresses); the corresponding name under which each location is doing business; the corresponding phone numbers and fax numbers; each location’s Medicare and state Medicaid program provider number and/or supplier number(s); and the name and address of each Medicare and state Medicaid program contractor to which Ensign Group currently submits claims; 12. a description of Ensign Group’s corporate structure, including identification of any parent and sister companies, subsidiaries, and their respective lines of business; and