Interconnection and Metering Facilities Clause Samples

The Interconnection and Metering Facilities clause defines the requirements and responsibilities for establishing and maintaining the physical and technical infrastructure that connects a generating facility to the utility grid, as well as the systems used to measure the flow of electricity. This clause typically outlines the specifications for equipment, installation procedures, ownership, and ongoing maintenance of both interconnection points and metering devices. Its core practical function is to ensure accurate measurement of energy delivered and reliable, safe integration of the facility with the grid, thereby preventing disputes and ensuring compliance with regulatory standards.
Interconnection and Metering Facilities. The Company shall provide dedicated core for the check metering. Both the main meter and the check meter shall be installed nearest to the PT in the outdoor yard and shall be housed in a suitable weatherproof cubicle.
Interconnection and Metering Facilities. The Company at the injection point and the consumer at the drawal point, shall provide at their cost dedicated core for the metering. Both the main meter and the check meter shall be installed nearest to the PT at both the injection point and the drawal point and shall be housed in a suitable weatherproof cubicle.
Interconnection and Metering Facilities. 8.1 Operator shall be responsible for the design, construction, installation, operation, maintenance and ownership of the Facility and Operator’s Interconnection Facilities under the Agreement for Interconnection and Parallel Operation. 8.2 Buckeye shall be responsible for the design, construction, installation, operation, maintenance and ownership of the Metering Facilities, except that Buckeye shall coordinate with Operator the design, construction, installation, operation and maintenance of any Metering Facilities installed on Operator’s property. 8.3 Power Company shall be responsible for the design, construction, installation, operation, maintenance and ownership of its Interconnection Facilities under the Agreement for Interconnection and Parallel Operation. 8.4 Within sixty (60) Days of the execution of this Agreement, Operator shall provide to Buckeye (1) a functional one-line diagram of the Facility showing at least the generator(s), protective relay functions, step-up transformers and circuit breakers that they propose to install on Operator’s side of the Interconnection Point and (2) a site plat showing the exact location of the proposed site. 8.5 If Buckeye determines that the Buckeye-owned Metering Facilities to be installed on each generating unit (which may include current and potential transformers and telemetering equipment) should be installed on Operator’s property, Operator shall be responsible for the installation of, and payment for, such Metering Facilities. The installation of any Buckeye- owned Metering Facilities on Operator’s side of the Interconnection Point shall be subject to Buckeye’s approval, which approval shall not be unreasonably withheld. 8.6 Operator shall reimburse Buckeye for the cost of the Metering Facilities installed by Buckeye. 8.7 Operator agrees to grant or have granted to Buckeye all necessary rights of way, easements, and adequate continuing access rights on property of Operator or on the Facility site and sufficient to install, operate, maintain, replace and/or remove the Metering Facilities located on property of Operator or on the Facility site. Prior to the construction by Buckeye of the Metering Facilities, Operator agrees to execute such other grants, deeds or documents as Buckeye may require to record such rights of way, easements, or other grants. Consideration for such grants, deeds or documents shall be the execution of this Agreement and no other consideration shall be required. Operator agrees th...