Interconnection Customer Interconnection Facilities (ICIFs Sample Clauses

The Interconnection Customer Interconnection Facilities (ICIFs) clause defines the specific equipment and systems that the interconnection customer is responsible for installing, owning, and maintaining to connect their facility to the transmission provider’s grid. This typically includes items such as step-up transformers, protective relays, and the physical connection point up to the demarcation with the transmission provider’s system. By clearly delineating these responsibilities, the clause ensures that both parties understand their obligations regarding infrastructure, thereby reducing the risk of disputes and facilitating a smooth and reliable interconnection process.
Interconnection Customer Interconnection Facilities (ICIFs. As depicted in Attachment 3, Figure 1, the ICIFs will be located on property owned or leased by the Interconnection Customer, and, will consist of two (2) 4.16 kV feeder circuits (1 for the existing plant (“Plant 1”)(generators 1-3) and 1 for the new plant (“Plant 2”) (generators 4-7) that will bring the power from both facilities to new 4.16 kV switchgear, from which the power will be stepped up through a new Plant Step Up (“PSU”) Transformer Station, and interconnect to the electric system via the 34.5 kV switchgear. The ICIFs shall be designed constructed, operated, and maintained in accordance with the Connecting Transmission Owner’s Electric Service Bulletin 750 Series (“ESB 750s”) and Good Utility Practice.
Interconnection Customer Interconnection Facilities (ICIFs. Engineering review and acceptance of ICIFs, including, but not limited to: ICIF drawings and equipment specs, ground grid system, system protection and coordination study, andrelay settings. $69,000 CTO IFs: Engineering, design, construction, testing and energization of revenue metering equipment. $38,000 TOTAL $107,000
Interconnection Customer Interconnection Facilities (ICIFs. Engineering review and acceptance of ICIFs, including, but not limited to: ICIF drawings and equipment specs, ground grid system, system protection and coordination study, andrelay settings. $69,000 SUFs: Engineering, design, construction, testing and energization. Remote Stations: Station #1 ▇▇▇▇▇▇ Relay settings modifications. $4,000 *COMPANY’s specifications for electrical requirements referenced for this Agreement include: ESB-750; ESB-752; ESB-755 and ESB-756, Appendix A as such may be amended, modified and superseded from time to time. See: Task Milestone Date Responsible Party 1. Interconnection Executed Agreement January 2012 Customer/Company 2. Written Authorization to proceed; Engineering and Procurement February 2012 Company 3. Security provided, Engineering, design and procurement started February 2012 Company