IT System Installation Sample Clauses

IT System Installation. Landlord and Tenant shall arrange for Tenant to have access to the Premises (which access shall be subject to the provisions of the initial paragraph of this Section 8.3 above) on a floor by floor basis as early as possible, but in all events prior to the installation of ceiling grids on each floor, as coordinated with Landlord, the Premises Contractor, and their respective contractors and agents working in the same space, in order to allow Tenant to install telephone lines and telephone systems, fiber optics, computer cabling, information technology systems and related similar items (“IT Systems”). The access Tenant is given to the Premises shall be at a time before the ceiling grids are installed by Landlord so as to allow more quick, cost effective and efficient installation of cabling and other wiring. Landlord shall use reasonable efforts to provide Tenant, as early as is reasonably practicable, with a range of estimated dates (which range shall be given approximately fifteen (15) to twenty-eight (28) days prior to the estimated date of installation) for installation of the ceiling grids on each floor so that Tenant can arrange for its contractors to do the installations of the IT Systems with the least amount of disruption and cost to both Landlord and Tenant, provided that Landlord shall have no liability for failure to provide Tenant with such range of estimated dates.
AutoNDA by SimpleDocs
IT System Installation. Landlord and Tenant shall arrange for Tenant to have access to the Premises on a floor by floor basis as early as possible, but in all events prior to the installation of ceiling grids on each floor, as coordinated with Landlord, the Premises Contractor, and their respective contractors and agents working in the same space, in order to allow Tenant to install telephone lines and telephone systems, fiber optics, computer cabling, information technology systems and related similar items (“IT Systems”). The access Tenant is given to the Premises shall be at a time before the ceiling grids are installed by Landlord so as to allow more quick, cost effective and efficient installation of cabling and other wiring. Landlord shall use reasonable efforts to provide Tenant, as early as is reasonably practicable, with a range of estimated dates (which range shall be given by notice to Tenant approximately fifteen (15) to twenty-one (21) days prior to the estimated date of installation) for installation of the ceiling grids on each floor so that Tenant can arrange for its contractors to do the installations of the IT Systems with the least amount of disruption and cost to both Landlord and Tenant.
IT System Installation. Arrow cannot guarantee how any equipment, IT System or Services supplied will work with other equipment, systems or processes already used by the Customer unless a written specification of requirement is included in the IT Product Order. On termination for any reason, Arrow shall not be liable for any charges to reprogram or re-configure the Customer’s equipment for subsequent services and shall be entitled to charge the Customer for any such work carried out by Arrow in accordance with paragraph 2.12 below.

Related to IT System Installation

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the equipment or parts in the required locations at no additional charge, unless otherwise specified in the Price Sheets. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the equipment or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the equipment or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Installation Services The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!