Key Issues for the Coming Month. 7.3.1 Key issues to be considered in the coming months:- - Site runoff should be properly collected and treated prior to discharge; - Minimize loss of sediment from filling works; - Regular review and maintenance of silt curtain systems, drainage systems and desilting facilities; - Exposed surfaces/soil stockpiles should be properly treated to avoid generation of silty surface run- off during rainstorm; - Regular review and maintenance of wheel washing facilities provided at all site entrances/exits; - Conduct regular inspection of various working machineries and vessels within works areas to avoid any dark smoke emission; - Suppress dust generated from work processes with use of bagged cements, earth movements, excavation activities, exposed surfaces/soil stockpiles and haul road traffic; - Quieter powered mechanical equipment should be used; - Provision of proper and effective noise control measures for operating equipment and machinery on- site, such as erection of movable noise barriers or enclosure for noisy plants; - Closely check and replace the sound insulation materials regularly; - Better scheduling of construction works to minimize noise nuisance; - Properly store and label oil drums and chemical containers placed on site; - Proper chemicals, chemical wastes and wastes management; - Maintenance works should be carried out within roofed, paved and confined areas; - Collection and segregation of construction waste and general refuse on land and in the sea should be carried out properly and regularly; and - Proper protection and regular inspection of existing trees, transplanted/retained trees. - Control night-time lighting and glare by hooding all lights. - Regular review and provide maintenance to dust control measures such as sprinkler system.
Appears in 4 contracts
Samples: Environmental Monitoring & Audit Report, Environmental Monitoring & Audit Report, Environmental Monitoring & Audit Report
Key Issues for the Coming Month. 7.3.1 7.2.1 Key issues to be considered in the coming months:- - Site runoff should be properly collected and treated prior to discharge; - Minimize loss of sediment from filling works; - Regular review and maintenance of silt curtain systems, drainage systems and desilting facilities; - Exposed surfaces/soil stockpiles should be properly treated to avoid generation of silty surface run- off during rainstorm; - Regular review and maintenance of wheel washing facilities provided at all site entrances/exits; - Conduct regular inspection of various working machineries and vessels within works areas to avoid any dark smoke emission; - Suppress dust generated from work processes with use of bagged cements, earth movements, excavation activities, exposed surfaces/soil stockpiles and haul road traffic; - Quieter powered mechanical equipment should be used; - Provision of proper and effective noise control measures for operating equipment and machinery on- site, such as erection of movable noise barriers or enclosure for noisy plants; - Closely check and replace the sound insulation materials regularly; - Better scheduling of construction works to minimize noise nuisance; - Properly store and label oil drums and chemical containers placed on site; - Proper chemicals, chemical wastes and wastes management; - Maintenance works should be carried out within roofed, paved and confined areas; - Collection and segregation of construction waste and general refuse on land and in the sea should be carried out properly and regularly; and - Proper protection and regular inspection of existing trees, transplanted/retained trees. - Control night-time lighting and glare by hooding all lights. - Regular review and provide maintenance to dust control measures such as sprinkler system.
Appears in 1 contract