Loading Marine Vessels Sample Clauses

Loading Marine Vessels. Loading of Vessels at the Docks is subject to this Schedule “B” and Schedule “C”. Seabrook will designate a berth for the Vessel. Notwithstanding any other provision in this Agreement, neither Seabrook nor Magellan warrants the safety of any channel, anchorage or other waterway used in approaching or departing from the designated berth, and neither Seabrook nor Magellan will be liable for any loss, damage, injury or delay to the Vessel resulting from the Vessel’s use of such channel, anchorage or waterway. All Vessels will be dimensionally acceptable and meet all requirements of the Terminal’s wharf facilities and governmental agencies. Available draft for Vessels at the Terminal Docks can vary significantly due to tides and weather conditions. Magellan will incur no liability for inadequate draft being available for a particular Vessel at a particular time as a result of natural causes.
AutoNDA by SimpleDocs

Related to Loading Marine Vessels

  • Vessels Each Vessel is

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Cargo THE CARRIER shall not be liable for damages provided it proves that the destruction, loss or damage resulted from one of the following:

  • Casual Loading (e) Superannuation contributions are to be made for periods when Employees are on:

  • Leave Loading 10.2 The employer and the individual employee must have genuinely made the agreement without coercion or duress.

  • Passengers THE CARRIER shall be liable for damages resulting from the death of a Passenger or any bodily injury sustained by a Passenger if the act causing the damages took place on board the aircraft or during boarding or deboarding operations.

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!