Mechanical (i) Large scale mechanical details complete. (ii) Mechanical schedules for equipment completed. (iii) Completed electrical schematic for environmental cooling and exhaust equipment. (iv) Complete energy conservation calculations and report.
Mechanical Rights The Licensor hereby grants to Licensee a non-exclusive License to use Master Recording in the reproduction, duplication, manufacture, and distribution of phonograph records, cassette tapes, compact disks, internet downloads, other and miscellaneous audio and digital recordings, and any lifts and versions thereof (collectively ,”Recordings”) worldwide for up to the pressing or selling a total of 5000 copies of such Recordings or any combination of such Recordings. Additionally, Licensor shall be permitted to distribute unlimited internet downloads for non-profit and non-commercial use.
DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.
Technical Documentation Prior to commencement of the Tests on Completion, the Contractor shall supply to the Engineer the technical documentation as specified in the Employer’s Requirements. The Works or Section shall not be considered to be completed for the purposes of taking- over under sub-clause 10.1 [Taking Over of the Works and Sections] until the Engineer has received the technical documentation as defined in this sub-clause 5.7, the "history file" including design calculations and certain certification as well as any other documents required to meet the CE Marking requirements.
Tools (a) The Employer shall provide on all construction jobs, and elsewhere where reasonably necessary and practicable (or if requested by the Employee), a suitable and secure waterproof lock-up solely for the purpose of storing Employees’ tools, and on multi-storey and major projects the Employer shall provide, where possible, a suitable lock-up for Employees’ tools within a reasonable distance of the work area of large groups of Employees. (b) Where an Employee is absent from work because of illness or accident the Employer shall ensure that the Employee’s tools are securely stored during his/her absence.
Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.
Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.
General specifications For the purpose of this Regulation, the vehicle shall fulfil the following requirements:
Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.
Instrumentation The acceleration shall be recorded during the test, using equipment in accordance with channel frequency class 1000 as specified in the latest version of ISO 6487.