Modifications to the Utility Plant Sample Clauses

Modifications to the Utility Plant. Subject always to the obligation to comply with Applicable Laws and Good Utility Practice, the Owner will not make or require the Operator to make any modifications to the Utility Plant that will have a direct material adverse effect on (i) the Operator’s ability to perform the Services hereunder; (ii) on the overall operation of the Facility; or (iii) on the Operator’s Mill or its operation. Subject always to the requirement to comply with Applicable Laws and Good Utility Practice, the Owner will not make any material modifications to the Utility Plant without first providing the Operator with reasonable Notice taking into account the nature of the modification and the urgency with which such modification is to be made.
AutoNDA by SimpleDocs

Related to Modifications to the Utility Plant

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Modifications to service This Auction Site reserves the right to modify or discontinue the Service with or without notice to user. This Auction Site shall not be liable to users or any third party should this Auction Site exercise its right to modify or discontinue the Service.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Subloop that may diminish the capability of the Loop or Subloop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the BellSouth’s TR 73600 Unbundled Local Loop Technical Specification. 2.5.2 BellSouth will remove load coils only on copper Loops and Subloops that are less than eighteen thousand (18,000) feet in length. 2.5.3 For any copper loop being ordered by NewPhone which has over six thousand (6,000) feet of combined bridged tap will be modified, upon request from NewPhone, so that the loop will have a maximum of six thousand (6,000) feet of bridged tap. This modification will be performed at no additional charge to NewPhone. Loop conditioning orders that require the removal of bridged tap that serves no network design purpose on a copper Loop that will result in a combined total of bridged tap between two thousand five hundred (2,500) and six thousand (6,000) feet will be performed at the rates set forth in Exhibit A. 2.5.4 NewPhone may request removal of any unnecessary and non-excessive bridged tap (bridged tap between zero (0) and two thousand five hundred (2,500) feet which serves no network design purpose), at rates pursuant to BellSouth’s SC Process as mutually agreed to by the Parties. 2.5.5 Rates for ULM are as set forth in Exhibit A. 2.5.6 BellSouth will not modify a Loop in such a way that it no longer meets the technical parameters of the original Loop type (e.g., voice grade, ADSL, etc.) being ordered. 2.5.7 If NewPhone requests ULM on a reserved facility for a new Loop order, BellSouth may perform a pair change and provision a different Loop facility in lieu of the reserved facility with ULM if feasible. The Loop provisioned will meet or exceed specifications of the requested Loop facility as modified. NewPhone will not be charged for ULM if a different Loop is provisioned. For Loops that require a DLR or its equivalent, BellSouth will provide LMU detail of the Loop provisioned. 2.5.8 NewPhone shall request Loop make up information pursuant to this Attachment prior to submitting a service inquiry and/or a LSR for the Loop type that NewPhone desires BellSouth to condition. 2.5.9 When requesting ULM for a Loop that BellSouth has previously provisioned for NewPhone, NewPhone will submit a SI to BellSouth. If a spare Loop facility that meets the Loop modification specifications requested by NewPhone is available at the location for which the ULM was requested, NewPhone will have the option to change the Loop facility to the qualifying spare facility rather than to provide ULM. In the event that BellSouth changes the Loop facility in lieu of providing ULM, NewPhone will not be charged for ULM but will only be charged the service order charges for submitting an order.

  • Modifications to the Agreement This Agreement constitutes the entire understanding of the parties on the subjects covered. The Employee expressly warrants that he or she is not executing this Agreement in reliance on any promises, representations, or inducements other than those contained herein. Modifications to this Agreement or the Plan can be made only in an express written contract executed by a duly authorized officer of the Company.

  • Modifications to the General Conditions The modifications to the General Conditions are as follows: 1. Paragraph (a) of Section 2.07 is modified to read as follows:

  • Modification, etc No modification, amendment or waiver of any provision of this Article, nor the consent to any departure by a Guarantor therefrom, shall in any event be effective unless the same shall be in writing and signed by the Trustee, and then such waiver or consent shall be effective only in the specific instance and for the purpose for which given. No notice to or demand on a Guarantor in any case shall entitle such Guarantor or any other guarantor to any other or further notice or demand in the same, similar or other circumstances.

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • Modifications, etc Any renewal, extension, modification, increase, decrease, alteration, rearrangement, exchange or reissuance of all or any part of the Liabilities or the Credit Agreement or any instrument executed in connection therewith, or any contract or understanding between Borrower and any of the Lenders, or any other Person, pertaining to the Liabilities;

  • Modifications to Documents reference to any agreement (including this Agreement and any other Loan Document together with the schedules and exhibits hereto or thereto), document or instrument means such agreement, document or instrument as amended, modified, replaced, substituted for, superseded or restated;

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!