Net Power Output Minimum Acceptance Criteria Sample Clauses

Net Power Output Minimum Acceptance Criteria. Each Unit’s Net Power Output shall be greater than or equal to *** (the “Net Power Output Minimum Acceptance Criteria” or “Net Power Output MAC”). As used in this Attachment T and Attachment S, the “Electric Delivery Point” means the PG&E Contra Costa Switchyard.
AutoNDA by SimpleDocs

Related to Net Power Output Minimum Acceptance Criteria

  • Acceptance Criteria The Services and Deliverables must meet the following acceptance criteria or the JBE may reject the applicable Services or Deliverables. The JBE may use the attached Acceptance and Signoff Form to notify Contractor of the acceptance or rejection of the Services and Deliverables. Contractor will not be paid for any rejected Services or Deliverables.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Contract Goals A. For purposes of this procurement, OGS conducted a comprehensive search and determined that the Contract does not offer sufficient opportunities to set goals for participation by MWBEs as subcontractors, service providers, or suppliers to Contractor. Contractor is, however, encouraged to make every good faith effort to promote and assist the participation of MWBEs on this Contract for the provision of services and materials. The directory of New York State Certified MWBEs can be viewed at: xxxxx://xx.xxxxxxxxxxxxxx.xxx/FrontEnd/VendorSearchPublic.asp?TN=ny&XID=2528. Additionally, following Contract execution, Contractor is encouraged to contact the Division of Minority and Women’s Business Development ((000) 000-0000; (000) 000-0000; or (000) 000-0000) to discuss additional methods of maximizing participation by MWBEs on the Contract. B. Good Faith Efforts Pursuant to 5 NYCRR § 142.8, evidence of good faith efforts shall include, but not be limited to, the following: 1. A list of the general circulation, trade, and MWBE-oriented publications and dates of publications in which the Contractor solicited the participation of certified MWBEs as subcontractors/suppliers, copies of such solicitations, and any responses thereto. 2. A list of the certified MWBEs appearing in the Empire State Development (“ESD”) MWBE directory that were solicited for this Contract. Provide proof of dates or copies of the solicitations and copies of the responses made by the certified MWBEs. Describe specific reasons that responding certified MWBEs were not selected. 3. Descriptions of the Contract documents/plans/specifications made available to certified MWBEs by the Contractor when soliciting their participation and steps taken to structure the scope of work for the purpose of subcontracting with, or obtaining supplies from, certified MWBEs. 4. A description of the negotiations between the Contractor and certified MWBEs for the purposes of complying with the MWBE goals of this Contract. 5. Dates of any pre-bid, pre-award, or other meetings attended by Contractor, if any, scheduled by OGS with certified MWBEs whom OGS determined were capable of fulfilling the MWBE goals set in the Contract. 6. Other information deemed relevant to the request.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.

  • Project Specific Milestones In addition to the milestones stated in Section 212.5 of the Tariff, as applicable, during the term of this ISA, Interconnection Customer shall ensure that it meets each of the following development milestones: 6.1 Substantial Site work completed. On or before December 31, 2020 Interconnection Customer must demonstrate completion of at least 20% of project site construction. At this time, Interconnection Customer must submit to Interconnected Transmission Owner and Transmission Provider initial drawings, certified by a professional engineer, of the Customer Interconnection Facilities. 6.2 Delivery of major electrical equipment. On or before December 31, 2021, Interconnection Customer must demonstrate that all generating units have been delivered to Interconnection Customer’s project site.

  • Project Goals The schedule, budget, physical, technical and other objectives for the Project shall be defined.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Sales Milestones (a) As to each Therapeutic Product, SANOFI-AVENTIS shall pay MERRIMACK up to a total of Sixty Million Dollars (US$60,000,000) upon the first achievement of the following Net Sales milestones, on a Therapeutic Product-by-Therapeutic Product basis: (i) Total Worldwide Net Sales for such Therapeutic Product exceed $[**] in any four (4) consecutive calendar quarters $ [**] (ii) Total Worldwide Net Sales for such Therapeutic Product exceed $[**] in any four (4) consecutive calendar quarters $ [**] (iii) Total Worldwide Net Sales for Therapeutic Product exceed $[**] in any four (4) consecutive calendar quarters $ [**] (b) Each milestone payment set forth in Section 8.4(a) shall be payable by SANOFI-AVENTIS upon the achievement of the related milestone event by SANOFI-AVENTIS and its Affiliates or sublicensees, and SANOFI-AVENTIS shall provide notice to MERRIMACK promptly upon achievement of such milestone event. SANOFI-AVENTIS shall pay MERRIMACK each such milestone payment within [**] days of such achievement of the related milestone event. (c) For purposes of clarity, more than one of the Net Sales milestones set forth above may be earned in the same four (4) consecutive calendar quarter period with respect to a Therapeutic Product. For example, if total worldwide Net Sales with respect to a given Therapeutic Product have not achieved any of the lower sales milestone thresholds set forth in clause (i) or (ii) of Section 8.3(a) above in any previous four (4) consecutive calendar quarter period, but total worldwide Net Sales with respect to such Therapeutic Product exceed $[**] in a subsequent four (4) consecutive calendar quarter period, then all three milestone payments, totaling $60 Million, payable upon achievement of the sales milestone thresholds set forth in clause (i), (ii) and (iii) of Section 8.3(a) above shall become payable to MERRIMACK hereunder.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!