We use cookies on our site to analyze traffic, enhance your experience, and provide you with tailored content.

For more information visit our privacy policy.

No Additional Authority Contribution Required Sample Clauses

No Additional Authority Contribution Required. Other than as provided in Section 4.3 hereof, the Authority shall not be obligated to make any contribution of funds to the Trustee in connection with the delivery of the 2023DE Bonds, but the Authority may, at any time on or after the Closing Date, make additional deposits to the Program Fund, including the 2023 Series D Restricted Loan Subaccount, the 2023 Series E Restricted Loan Subaccount, the 2023 Series D subaccount of the Cost of Issuance Account and the 2023 Series D subaccount of the Negative Arbitrage Account within the Program Fund.
No Additional Authority Contribution Required. Other than as provided in Section 4.2 hereof, the Authority shall not be obligated to make any contribution of funds to the Trustee in connection with the delivery of the 2020E Bonds, but the Authority may, at any time on or after the Closing Date, make additional deposits to the Program Fund, including the Restricted Loan Subaccount, the Collateral Fund Subaccount, the 2020 Series E subaccount of the Cost of Issuance Account and the 2020 Series E subaccount of the Negative Arbitrage Account within the Program Fund. ARTICLE V. ESTABLISHMENT OF CERTAIN SUBACCOUNTS; APPLICATION OF 2020 SERIES E SUBACCOUNT OF THE ACQUISITION ACCOUNT
No Additional Authority Contribution Required. Other than as provided in Section 4.2 hereof, the Authority shall not be obligated to make any contribution of funds to the Trustee in connection with the delivery of the 2020E Bonds, but the Authority may, at any time on or after the Closing Date, make additional deposits to the Program Fund, including the Restricted Loan Subaccount, the Collateral Fund Subaccount, the 2020 Series E subaccount of the Cost of Issuance Account and the 2020 Series E subaccount of the Negative Arbitrage Account within the Program Fund. ARTICLE V. ESTABLISHMENT OF CERTAIN SUBACCOUNTS; APPLICATION OF 2020 SERIES E SUBACCOUNT OF THE ACQUISITION ACCOUNT

Related to No Additional Authority Contribution Required

  • Construction Requirements (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. (b) Electric panel schedules must be brought up to date identifying all new circuits added. (c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. (d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. (e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. (f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. (g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. (i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. (ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. (iii) The Building Engineer will inspect the construction on a periodic basis as well. (j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.