WORK CLOTHING Two sets of cotton drill protective clothing will be issued to all employees, upon request, within two weeks of commencing work with the Company. Employees will be made aware of these entitlements at the time of employment. A set of clothing will consist of either: • Two pairs of overalls; or • Two combination bib and brace; or • Two pairs of long trousers and two long sleeved shirt; or • Work denims at cost no greater than the above three choices • Clothing and footwear will be replaced on a fair wear and tear basis.
THE CONTRACT SUM The Owner shall pay the Contractor for the performance of the contract, subject to additions and deductions provided by approved change orders, in current funds, the Contract Sum as follows:
CONTRACT SUM 9.1.1 The Contract Sum is stated in the State-Contractor Agreement and, including authorized adjustments thereto, is the total amount payable by the State to the Contractor for the performance of the Work under the Contract Documents.
NO WORK STOPPAGES 5. It is mutually agreed and understood that during the period this Agreement is in force and effect the Union will not authorize or engage in any strike, slowdown or work stoppage. It shall not be a violation of this Agreement for an employee to honor a primary picket line sanctioned by the Central Labor Council or the Building and Construction Trades Council; provided however, that an employee shall first notify an appropriate supervisor of the employee's intended actions. Provided further that nothing in this Section shall limit the City's right to enforce the provisions of Section 8.346 of the Charter.
No Material Changes, Etc Since the Balance Sheet Date, there has occurred no material adverse change in the financial condition or assets or business of the Borrower as shown on or reflected in the balance sheet of the Borrower as of the Balance Sheet Date, or the statement of income for the fiscal year then ended, other than changes in the ordinary course of business that have not had any Material Adverse Effect either individually or in the aggregate.
C1 Contract Price In consideration of the Contractor’s performance of its obligations under the Contract, the Authority shall pay the Contract Price in accordance with clause C2 (Payment and VAT).
No Material Change There has been no material adverse change in the business, operations, financial condition or assets of the Company since the date of the Company's most recent financial statements;
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
No Material Changes Prior to and on each of the Closing Date and the Option Closing Date, if any, (i) there shall have been no material adverse change or development involving a prospective material adverse change in the condition or prospects or the business activities, financial or otherwise, of the Company from the latest dates as of which such condition is set forth in the Registration Statement and the Prospectus, (ii) no action suit or proceeding, at law or in equity, shall have been pending or threatened against the Company or any Insider before or by any court or federal, foreign or state commission, board or other administrative agency wherein an unfavorable decision, ruling or finding may materially adversely affect the business, operations, or financial condition or income of the Company, except as set forth in the Registration Statement and the Prospectus, (iii) no stop order shall have been issued under the Act and no proceedings therefor shall have been initiated or, to the Company’s knowledge, assuming reasonable inquiry, threatened by the Commission, and (iv) the Registration Statement, the Sale Preliminary Prospectus and the Prospectus and any amendments or supplements thereto shall contain all material statements which are required to be stated therein in accordance with the Act and the Regulations and shall conform in all material respects to the requirements of the Act and the Regulations, and neither the Registration Statement, the Sale Preliminary Prospectus nor the Prospectus nor any amendment or supplement thereto shall contain any untrue statement of a material fact or omit to state any material fact required to be stated therein or necessary to make the statements therein, in light of the circumstances under which they were made, not misleading.
Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.