WORK CLOTHING Two sets of cotton drill protective clothing will be issued to all employees, upon request, within two weeks of commencing work with the Company. Employees will be made aware of these entitlements at the time of employment. A set of clothing will consist of either: • Two pairs of overalls; or • Two combination bib and brace; or • Two pairs of long trousers and two long sleeved shirt; or • Work denims at cost no greater than the above three choices • Clothing and footwear will be replaced on a fair wear and tear basis.
THE CONTRACT SUM The Owner shall pay the Contractor for the performance of the contract, subject to additions and deductions provided by approved change orders, in current funds, the Contract Sum as follows:
CONTRACT SUM 9.1.1 The Contract Sum is stated in the State-Contractor Agreement and, including authorized adjustments thereto, is the total amount payable by the State to the Contractor for the performance of the Work under the Contract Documents.
NO WORK STOPPAGES 5. It is mutually agreed and understood that during the period this Agreement is in force and effect the Union will not authorize or engage in any strike, slowdown or work stoppage. It shall not be a violation of this Agreement for an employee to honor a primary picket line sanctioned by the Central Labor Council or the Building and Construction Trades Council; provided however, that an employee shall first notify an appropriate supervisor of the employee's intended actions. Provided further that nothing in this Section shall limit the City's right to enforce the provisions of Section 8.346 of the Charter.
C1 Contract Price In consideration of the Contractor’s performance of its obligations under the Contract, the Authority shall pay the Contract Price in accordance with clause C2 (Payment and VAT).
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.
Construction Phase Services 3.1.1 – Basic Construction Services
Construction, Etc Each covenant contained herein shall be construed (absent express provision to the contrary) as being independent of each other covenant contained herein, so that compliance with any one covenant shall not (absent such an express contrary provision) be deemed to excuse compliance with any other covenant. Where any provision herein refers to action to be taken by any Person, or which such Person is prohibited from taking, such provision shall be applicable whether such action is taken directly or indirectly by such Person. For the avoidance of doubt, all Schedules and Exhibits attached to this Agreement shall be deemed to be a part hereof.
Contract Schedule The information set forth in the Contract Schedule is true and correct.