Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.
Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)
Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.
Transportation Management Tenant shall fully comply with all present or future programs intended to manage parking, transportation or traffic in and around the Building, and in connection therewith, Tenant shall take responsible action for the transportation planning and management of all employees located at the Premises by working directly with Landlord, any governmental transportation management organization or any other transportation-related committees or entities.
Environmental Services 1. Preparation of Environmental Documentation (CEQA/NEPA) including but not limited to the following: a. Initial Study b. Categorical Exemption (CE) c. Notice of Exemption (XXX) d. Negative Declaration (ND) e. Mitigated Negative Declaration (MND) f. Notice of Preparation (NOP) g. Environmental Impact Report (EIR) i. Initial Document (Screen Check/Administrative Draft) ii. Addendum iii. Supplemental
System Protection Facilities The Interconnection Customer shall, at its expense, install, operate and maintain System Protection Facilities as a part of the Large Generating Facility or the Interconnection Customer’s Interconnection Facilities. The Participating TO shall install at the Interconnection Customer's expense any System Protection Facilities that may be required on the Participating TO’s Interconnection Facilities or the Participating TO’s Transmission System as a result of the interconnection of the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities.
Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.
ELECTRICAL SERVICES The Company must construct and reticulate electrical requirements for all amenities and facilities. The Company must construct sub-station and distribution boards necessary to reticulate power to all Company owned or leased facilities which provide amenities to the public. The electrical installation must be to the design and installation standards of the State Energy Commission of Western Australia. All electrical reticulation must be placed underground.
Traffic Management 9.2.1 During the Operating Period, Developer shall be responsible for the general management of traffic on the Project. Developer shall manage traffic so as to preserve and protect safety of traffic on the Project and Related Transportation Facilities and, to the maximum extent practicable, to avoid disruption, interruption or other adverse effects on traffic flow, throughput or level of service on the Project and Related Transportation Facilities. Developer shall conduct traffic management in accordance with all applicable Technical Provisions, Technical Documents, Laws and Governmental Approvals, and in accordance with the Traffic Management Plan. 9.2.2 Developer shall prepare and submit to TxDOT and the Independent Engineer for TxDOT approval a Traffic Management Plan for managing traffic on the Project and Related Transportation Facilities after the commencement of traffic operations on any portion of the Project, addressing (a) orderly and safe movement and diversion of traffic on Related Transportation Facilities during Project construction, (b) orderly and safe movement of traffic on the Project and (c) orderly and safe diversion of traffic on the Project and Related Transportation Facilities necessary in connection with field maintenance and repair work or Renewal Work or in response to Incidents, Emergencies and lane closures. Developer shall prepare the Traffic Management Plan according to the schedule set forth in the Technical Provisions. The Traffic Management Plan shall comply with the Technical Provisions and Technical Documents concerning traffic management and traffic operations. Developer shall carry out all traffic management during the Term in accordance with the approved Traffic Management Plan. 9.2.3 Developer shall implement the Traffic Management Plan to promote safe and efficient operation of the Project and Related Transportation Facilities at all times during the course of any construction or operation of the Project and during the Utility Adjustment Work. 9.2.4 TxDOT shall have at all times, without obligation or liability to Developer, the right 9.2.4.1 Issue Directive Letters to Developer regarding traffic management 9.2.4.2 Provide on the Project, via message signs or other means consistent with Good Industry Practice, non-Discriminatory traveler and driver information, and other public information (e.g. amber alerts), provided that the means to disseminate such information does not materially interfere with the functioning of the ETCS.
Toilet Facilities The Employer provides the Contractor access to toilet facilities. Temporary chemical toilets are provided by the Contractor where deemed necessary.