OASIS Posting. IPA will maintain, through the open access same-time information system (OASIS) of Operating Agent (or as IPA shall otherwise determine), a list of all pending Interconnection Requests. The list will identify, for each Interconnection Request: (i) the maximum summer and winter megawatt electrical output; (ii) the location by county and state; (iii) the point where the interconnection will be made; (iv) the projected In-Service Date; (v) the status of the Interconnection Request, including Queue Position; (vi) the availability of any studies related to the Interconnection Request; (vii) the date of the Interconnection Request; (viii) the type of Generating Facility to be constructed; (ix) any deviations from the study timelines set forth herein; (x) Interconnection Study reports and Optional Interconnection Study reports; and (xi) for Interconnection Requests that have not resulted in a completed interconnection, an explanation as to why it was not completed. The list will not disclose the identity of Interconnection Customer until Interconnection Customer executes a GIA.
Appears in 3 contracts
Samples: Generator Interconnection Procedures, Generator Interconnection Procedures, Generator Interconnection Procedures
OASIS Posting. 3.4.1 IPA will maintain, through the open access same-time information system (OASIS) of Operating Agent (or as IPA shall otherwise determine), a list of all pending Interconnection Requests. The list will identify, for each Interconnection Request: :
(i) the maximum summer and winter megawatt electrical output; (ii) the location by county and state; (iii) the point where the interconnection will be made; (iv) the projected In-Service Date; (v) the status of the Interconnection Request, including Queue Position; (vi) the availability of any studies related to the Interconnection Request; (vii) the date of the Interconnection Request; (viii) the type of Generating Facility to be constructed; (ix) any deviations from the study timelines set forth herein; (x) Interconnection Study reports and Optional Interconnection Study reports; and (xi) for Interconnection Requests that have not resulted in a completed interconnection, an explanation as to why it was not completed. The list will not disclose the identity of Interconnection Customer until Interconnection Customer executes a GIA.
Appears in 2 contracts
Samples: Generator Interconnection Agreement (Gia), Generator Interconnection Agreement (Gia)