Obtaining Wage Determinations. (a) Subrecipients must obtain proposed wage determinations for specific localities at xxx.xxxx.xxx. After the Subrecipient obtains its proposed wage determination, it must submit the wage determination to the Grant Officer identified in Section IX of Attachment A for approval prior to inserting the wage determination into a solicitation, contract or issuing task orders, work assignments or similar instruments to existing contractors (ordering instruments unless subsequently directed otherwise by the State recipient Award Official. (b) Subrecipients shall obtain the wage determination for the locality in which a covered activity subject to DB will take place prior to issuing requests for bids, proposals, quotes or other methods for soliciting contracts (solicitation) for activities subject to DB. These wage determinations shall be incorporated into solicitations and any subsequent contracts. Prime contracts must contain a provision requiring that subcontractors follow the wage determination incorporated into the prime contract. (i) While the solicitation remains open, the subrecipient shall monitor xxx.xxxx.xxx. on a weekly basis to ensure that the wage determination contained in the solicitation remains current. The subrecipients shall amend the solicitation if DOL issues a modification more than 10 days prior to the closing date (i.e. bid opening) for the solicitation. If DOL modifies or supersedes the applicable wage determination less than 10 days prior to the closing date, the subrecipients may request a finding from the State recipient that there is not a reasonable time to notify interested contractors of the modification of the wage determination. The State recipient will provide a report of its findings to the subrecipient. (ii) If the subrecipient does not award the contract within 90 days of the closure of the solicitation, any modifications or supersedes DOL makes to the wage determination contained in the solicitation shall be effective unless the State recipient, at the request of the subrecipient, obtains an extension of the 90 day period from DOL pursuant to 29 CFR 1.6(c)(3)(iv). The subrecipient shall monitor xxx.xxxx.xxx on a weekly basis if it does not award the contract within 90 days of closure of the solicitation to ensure that wage determinations contained in the solicitation remain current.
Appears in 2 contracts
Samples: Grant Agreement, Grant Agreement
Obtaining Wage Determinations. (a) Subrecipients must obtain proposed wage determinations for specific localities at xxx.xxxx.xxx. After the Subrecipient obtains its proposed wage determination, it must submit the wage determination to the Grant Officer identified in Section IX of Attachment A for approval prior to inserting the wage determination into a solicitation, contract or issuing task orders, work assignments or similar instruments to existing contractors (ordering instruments unless subsequently directed otherwise by the State recipient Award Official.
(b) Subrecipients The Recipient shall obtain the wage determination for the locality in which a covered activity subject to DB will take place prior to issuing requests for bids, proposals, quotes or other methods for soliciting contracts (solicitation) for activities subject to DB. These wage determinations shall be incorporated into solicitations and any subsequent contracts. Prime contracts must contain a provision requiring that subcontractors follow the wage determination incorporated into the prime contract.
(i) While the solicitation remains open, the subrecipient Recipient shall monitor xxx.xxxx.xxx. xxx.xxxx.xxx on a weekly basis to ensure that the wage determination contained in the solicitation remains current. The subrecipients Recipient shall amend the solicitation if DOL issues a modification more than 10 days prior to the closing date (i.e. bid opening) for the solicitation. If DOL modifies or supersedes the applicable wage determination less than 10 days prior to the closing date, the subrecipients Recipient may request a finding from the State recipient Water Board that there is not a reasonable time to notify interested contractors of the modification of the wage determination. The State recipient Water Board will provide a report of its findings to the subrecipientRecipient.
(ii) If the subrecipient Recipient does not award the contract within 90 days of the closure of the solicitation, any modifications or supersedes DOL makes to the wage determination contained in the solicitation shall be effective unless the State recipientWater Board, at the request of the subrecipientRecipient, obtains an extension of the 90 day period from DOL pursuant to 29 CFR 1.6(c)(3)(iv). The subrecipient Recipient shall monitor xxx.xxxx.xxx on a weekly basis if it does not award the contract within 90 days of closure of the solicitation to ensure that wage determinations contained in the solicitation remain current.
(b) If the Recipient carries out activity subject to DB by issuing a task order, work assignment or similar instrument to an existing contractor (ordering instrument) rather than by publishing a solicitation, the Recipient shall insert the appropriate DOL wage determination from xxx.xxxx.xxx into the ordering instrument.
(c) The Recipient shall review all subcontracts subject to DB entered into by prime contractors to verify that the prime contractor has required its subcontractors to include the applicable wage determinations.
(d) As provided in 29 CFR 1.6(f), DOL may issue a revised wage determination applicable to a Recipient’s contract after the award of a contract or the issuance of an ordering instrument if DOL determines that the Recipient has failed to incorporate a wage determination or has used a wage determination that clearly does not apply to the contract or ordering instrument. If this occurs, the Recipient shall either terminate the contract or ordering instrument and issue a revised solicitation or ordering instrument or incorporate DOL’s wage determination retroactive to the beginning of the contract or ordering instrument by change order. The Recipient’s contractor must be compensated for any increases in wages resulting from the use of XXX’s revised wage determination.
Appears in 2 contracts
Samples: Project Finance Agreement, Project Finance Agreement
Obtaining Wage Determinations. (a) Subrecipients must obtain proposed wage determinations for specific localities at xxx.xxxx.xxx. After the Subrecipient obtains its proposed wage determination, it must submit the wage determination to the Grant Officer identified in Section IX of Attachment A for approval prior to inserting the wage determination into a solicitation, contract or issuing task orders, work assignments or similar instruments to existing contractors (ordering instruments unless subsequently directed otherwise by the State recipient Award Official.
(b) Subrecipients shall obtain the wage determination for the locality in which a covered activity subject to DB will take place prior to issuing requests for bids, proposals, quotes or other methods for soliciting contracts (solicitation) for activities subject to DB. These wage determinations shall be incorporated into solicitations and any subsequent contracts. Prime contracts must contain a provision requiring that subcontractors follow the wage determination incorporated into the prime contract.
(i) While the solicitation remains open, the subrecipient shall monitor xxx.xxxx.xxx. on a weekly basis to ensure that the wage determination contained in the solicitation remains current. The subrecipients shall amend the solicitation if DOL issues a modification more than 10 days prior to the closing date (i.e. bid opening) for the solicitation. If DOL modifies or supersedes the applicable wage determination less than 10 days prior to the closing date, the subrecipients may request a finding from the State recipient that there is not a reasonable time to notify interested contractors of the modification of the wage determination. The State recipient will provide a report of its findings to the subrecipient.
(ii) If the subrecipient does not award the contract within 90 days of the closure of the solicitation, any modifications or supersedes DOL makes to the wage determination contained in the solicitation shall be effective unless the State recipient, at the request of the subrecipient, obtains an extension of the 90 day period from DOL pursuant to 29 CFR 1.6(c)(3)(iv). The subrecipient shall monitor xxx.xxxx.xxx on a weekly basis if it does not award the contract within 90 days of closure of the solicitation to ensure that wage determinations contained in the solicitation remain current.
Appears in 2 contracts
Samples: Grant Agreement, Grant Agreement
Obtaining Wage Determinations. (a) Subrecipients The Recipient must obtain proposed wage determinations for specific localities at xxx.xxxx.xxx. After the Subrecipient Recipient obtains its proposed wage determination, it must submit the wage determination to the Grant Officer identified in Section IX of Attachment A State Water Board for approval prior to inserting the wage determination into a solicitation, contract or issuing task orders, work assignments or similar instruments to existing contractors (ordering instruments unless subsequently directed otherwise by the State recipient Award OfficialWater Board.
(b) Subrecipients The Recipient shall obtain the wage determination for the locality in which a covered activity subject to DB will take place prior to issuing requests for bids, proposals, quotes or other methods for soliciting contracts (solicitation) for activities subject to DB. These wage determinations shall be incorporated into solicitations and any subsequent contracts. Prime contracts must contain a provision requiring that subcontractors follow the wage determination incorporated into the prime contract.
(i) While the solicitation remains open, the subrecipient Recipient shall monitor xxx.xxxx.xxx. on a weekly basis to ensure that the wage determination contained in the solicitation remains current. The subrecipients Recipient shall amend the solicitation if DOL issues a modification more than 10 days prior to the closing date (i.e. bid opening) for the solicitation. If DOL modifies or supersedes the applicable wage determination less than 10 days prior to the closing date, the subrecipients Recipient may request a finding from the State recipient Water Board that there is not a reasonable time to notify interested contractors of the modification of the wage determination. The State recipient Water Board will provide a report of its findings to the subrecipientRecipient.
(ii) If the subrecipient Recipient does not award the contract within 90 days of the closure of the solicitation, any modifications or supersedes DOL makes to the wage determination contained in the solicitation shall be effective unless the State recipientWater Board, at the request of the subrecipientRecipient, obtains an extension of the 90 day period from DOL pursuant to 29 CFR 1.6(c)(3)(iv). The subrecipient Recipient shall monitor xxx.xxxx.xxx on a weekly basis if it does not award the contract within 90 days of closure of the solicitation to ensure that wage determinations contained in the solicitation remain current.
Appears in 1 contract
Samples: Project Finance Agreement
Obtaining Wage Determinations. (a) Subrecipients must obtain proposed wage determinations for specific localities at xxx.xxxx.xxx. After the Subrecipient obtains its proposed wage determination, it must submit the wage determination to the Grant Officer identified in Section IX of Attachment A for approval prior to inserting the wage determination into a solicitation, contract or issuing task orders, work assignments or similar instruments to existing contractors (ordering instruments unless subsequently directed otherwise by the State recipient Award Official.
(b) Subrecipients shall obtain the wage determination for the locality in which a covered activity subject to DB will take place prior to issuing requests for bids, proposals, quotes or other methods for soliciting contracts (solicitation) for activities subject to DB. These wage determinations shall be incorporated into solicitations and any subsequent contracts. Prime contracts must contain a provision requiring that subcontractors follow the wage determination incorporated into the prime contract.
(i) While the solicitation remains open, the subrecipient shall monitor xxx.xxxx.xxx. on a xxx.xxxx.xxx weekly basis to ensure that the wage determination contained in the solicitation remains current. The subrecipients shall amend the solicitation if DOL issues a modification more than 10 days prior to the closing date (i.e. bid opening) for the solicitation. If DOL modifies or supersedes the applicable wage determination less than 10 days prior to the closing date, the subrecipients may request a finding from the State recipient that there is not a reasonable time to notify interested contractors of the modification of the wage determination. The State recipient will provide a report of its findings to the subrecipient.
(ii) If the subrecipient does not award the contract within 90 days of the closure of the solicitation, any modifications or supersedes DOL makes to the wage determination contained in the solicitation shall be effective unless the State recipient, at the request of the subrecipient, obtains an extension of the 90 day period from DOL pursuant to 29 CFR 1.6(c)(3)(iv). The subrecipient shall monitor xxx.xxxx.xxx on a weekly basis if it does not award the contract within 90 days of closure of the solicitation to ensure that wage determinations contained in the solicitation remain current.
(b) If the subrecipient carries out activity subject to DB by issuing a task order, work assignment or similar instrument to an existing contractor (ordering instrument) rather than by publishing a solicitation, the subrecipient shall insert the appropriate DOL wage determination from xxx.xxxx.xxx into the ordering instrument.
(c) Subrecipients shall review all subcontracts subject to DB entered into by prime contractors to verify that the prime contractor has required its subcontractors to include the applicable wage determinations.
(d) As provided in 29 CFR 1.6(f), DOL may issue a revised wage determination applicable to a subrecipient’s contract after the award of a contract or the issuance of an ordering instrument if DOL determines that the subrecipient has failed to incorporate a wage determination or has used a wage determination that clearly does not apply to the contract or ordering instrument. If this occurs, the subrecipient shall either terminate the contract or ordering instrument and issue a revised solicitation or ordering instrument or incorporate DOL’s wage determination retroactive to the beginning of the contract or ordering instrument by change order. The subrecipient’s contractor must be compensated for any increases in wages resulting from the use of DOL’s revised wage determination. xxxx://xxx.xxxx.xxx/ xxxx://xxx.xxxx.xxx/ xxxx://xxx.xxxx.xxx/ C01072C17 page 19 of 39 §00800 Rev (04/06/2016) Supplemental Terms and Conditions
Appears in 1 contract
Samples: Contract C01072c17
Obtaining Wage Determinations. (a) Subrecipients must obtain proposed wage determinations for specific localities at xxx.xxxx.xxx. After the Subrecipient obtains its proposed wage determination, it must submit the wage determination to the Grant Officer identified in Section IX of Attachment A for approval prior to inserting the wage determination into a solicitation, contract or issuing task orders, work assignments or similar instruments to existing contractors (ordering instruments unless subsequently directed otherwise by the State recipient Award Official.
(b) Subrecipients shall obtain the wage determination for the locality in which a covered activity subject to DB will take place prior to issuing requests for bids, proposals, quotes or other methods for soliciting contracts (solicitation) for activities subject to DB. These wage determinations shall be incorporated into solicitations and any subsequent contracts. Prime contracts must contain a provision requiring that subcontractors follow the wage determination incorporated into the prime contract.
(i) While the solicitation remains open, the subrecipient shall monitor xxx.xxxx.xxx. on a xxx.xxxx.xxx weekly basis to ensure that the wage determination contained in the solicitation remains current. The subrecipients shall amend the solicitation if DOL issues a modification more than 10 days prior to the closing date (i.e. bid opening) for the solicitation. If DOL modifies or supersedes the applicable wage determination less than 10 days prior to the closing date, the subrecipients may request a finding from the State recipient that there is not a reasonable time to notify interested contractors of the modification of the wage determination. The State recipient will provide a report of its findings to the subrecipient.
(ii) If the subrecipient does not award the contract within 90 days of the closure of the solicitation, any modifications or supersedes DOL makes to the wage determination contained in the solicitation shall be effective unless the State recipient, at the request of the subrecipient, obtains an extension of the 90 day period from DOL pursuant to 29 CFR 1.6(c)(3)(iv). The subrecipient shall monitor xxx.xxxx.xxx on a weekly basis if it does not award the contract within 90 days of closure of the solicitation to ensure that wage determinations contained in the solicitation remain current.
(b) If the subrecipient carries out activity subject to DB by issuing a task order, work assignment or similar instrument to an existing contractor (ordering instrument) rather than by publishing a solicitation, the subrecipient shall insert the appropriate DOL wage determination from xxx.xxxx.xxx into the ordering instrument.
(c) Subrecipients shall review all subcontracts subject to DB entered into by prime contractors to verify that the prime contractor has required its subcontractors to include the applicable wage determinations.
(d) As provided in 29 CFR 1.6(f), DOL may issue a revised wage determination applicable to a subrecipient’s contract after the award of a contract or the issuance of an ordering instrument if DOL determines that the subrecipient has failed to incorporate a wage determination or has used a wage determination that clearly does not apply to the contract or ordering instrument. If this occurs, the subrecipient shall either terminate the contract or ordering instrument and issue a revised solicitation or ordering instrument or incorporate DOL’s wage determination retroactive to the beginning of the contract or ordering instrument by change order. The subrecipient’s contractor must be compensated for any increases in wages resulting from the use of DOL’s revised wage determination.
Appears in 1 contract
Samples: Construction Contract
Obtaining Wage Determinations. (a) Subrecipients must obtain proposed wage determinations for specific localities at xxx.xxxx.xxx. After the Subrecipient obtains its proposed wage determination, it must submit the wage determination to the Grant Officer identified in Section IX of Attachment A for approval prior to inserting the wage determination into a solicitation, contract or issuing task orders, work assignments or similar instruments to existing contractors (ordering instruments unless subsequently directed otherwise by the State recipient Award Official.
(b) Subrecipients shall obtain the wage determination for the locality in which a covered activity subject to DB will take place prior to issuing requests for bids, proposals, quotes or other methods for soliciting contracts (solicitation) for activities subject to DB. These wage determinations shall be incorporated into solicitations and any subsequent contracts. Prime contracts must contain a provision requiring that subcontractors follow the wage determination incorporated into the prime contract.
(i1) While the solicitation remains open, the subrecipient shall monitor xxx.xxxx.xxx. on a xxx.xxxx.xxx weekly basis to ensure that the wage determination contained in the solicitation remains current. The subrecipients shall amend the solicitation if DOL issues a modification more than 10 days prior to the closing date (i.e. bid opening) for the solicitation. If DOL modifies or supersedes the applicable wage determination less than 10 days prior to the closing date, the subrecipients may request a finding from the State recipient that there is not a reasonable time to notify interested contractors of the modification of the wage determination. The State recipient will provide a report of its findings to the subrecipient.
(ii2) If the subrecipient does not award the contract within 90 days of the closure of the solicitation, any modifications or supersedes DOL makes to the wage determination contained in the solicitation shall be effective unless the State recipientrecipient , at the request of the subrecipient, obtains an extension of the 90 day period from DOL pursuant to 29 CFR 1.6(c)(3)(iv). The subrecipient shall monitor xxx.xxxx.xxx on a weekly basis if it does not award the contract within 90 days of closure of the solicitation to ensure that wage determinations contained in the solicitation remain current.
(b) If the subrecipient carries out activity subject to DB by issuing a task order, work assignment or similar instrument to an existing contractor (ordering instrument) rather than by publishing a solicitation, the subrecipient shall insert the appropriate DOL wage determination from xxx.xxxx.xxx into the ordering instrument.
(c) Subrecipients shall review all subcontracts subject to DB entered into by prime contractors to verify that the prime contractor has required its subcontractors to include the applicable wage determinations.
(d) As provided in 29 CFR 1.6(f), DOL may issue a revised wage determination applicable to a subrecipient’s contract after the award of a contract or the issuance of an ordering instrument if DOL determines that the subrecipient has failed to incorporate a wage determination or has used a wage determination that clearly does not apply to the contract or ordering instrument. If this occurs, the subrecipient shall either terminate the contract or ordering instrument and issue a revised solicitation or ordering instrument or incorporate DOL’s wage determination retroactive to the beginning of the contract or ordering instrument by change order. The subrecipient’s contractor must be compensated for any increases in wages resulting from the use of DOL’s revised wage determination.
Appears in 1 contract
Samples: State Revolving Fund Contract
Obtaining Wage Determinations. (a) Subrecipients must obtain proposed wage determinations for specific localities at xxx.xxxx.xxx. After the Subrecipient obtains its proposed wage determination, it must submit the wage determination to the Grant Officer identified in Section IX of Attachment A for approval prior to inserting the wage determination into a solicitation, contract or issuing task orders, work assignments or similar instruments to existing contractors (ordering instruments unless subsequently directed otherwise by the State recipient Award Official.
(b) Subrecipients Loan Recipients shall obtain the wage determination for the locality in which a covered activity subject to DB will take place prior to issuing requests for bids, proposals, quotes or other methods for soliciting contracts (solicitation) for activities subject to DB. These wage determinations shall be incorporated into solicitations and any subsequent contracts. Prime contracts must contain a provision requiring that subcontractors follow the wage determination incorporated into the prime contract.
(i1) While the solicitation remains open, the subrecipient Loan Recipient shall monitor xxx.xxxx.xxx. on a xxx.xxxx.xxx weekly basis to ensure that the wage determination contained in the solicitation remains current. The subrecipients Loan Recipients shall amend the solicitation if DOL the Department of Labor (DOL) issues a modification more than 10 days prior to the closing date (i.e. bid opening) for the solicitation. If DOL modifies or supersedes the applicable wage determination less than 10 days prior to the closing date, the subrecipients Loan Recipients may request a finding from the State recipient that there is not a reasonable time to notify interested contractors of the modification of the wage determination. The State recipient will provide a report of its findings to the subrecipientLoan Recipient.
(ii2) If the subrecipient Loan Recipient does not award the contract within 90 days of the closure of the solicitation, any modifications or supersedes DOL makes to the wage determination contained in the solicitation shall be effective unless the State recipient, at the request of the subrecipientLoan Recipient, obtains an extension of the 90 day period from DOL pursuant to 29 CFR 1.6(c)(3)(iv1.6(c) (3) (iv). The subrecipient Loan Recipient shall monitor xxx.xxxx.xxx on a weekly basis if it does not award the contract within 90 days of closure of the solicitation to ensure that wage determinations contained in the solicitation remain current.
(b) If the Loan Recipient carries out activity subject to DB by issuing a task order, work assignment or similar instrument to an existing contractor (ordering instrument) rather than by publishing a solicitation, the Loan Recipient shall insert the appropriate DOL wage determination from xxx.xxxx.xxx into the ordering instrument.
(c) Loan Recipients shall review all subcontracts subject to DB entered into by prime contractors to verify that the prime contractor has required its subcontractors to include the applicable wage determinations.
(d) As provided in 29 CFR 1.6(f), DOL may issue a revised wage determination applicable to a Loan Recipient’s contract after the award of a contract or the issuance of an ordering instrument if DOL determines that the Loan Recipient has failed to incorporate a wage determination or has used a wage determination that clearly does not apply to the contract or ordering instrument. If this occurs, the Loan Recipient shall either terminate the contract or ordering instrument and issue a revised solicitation or ordering instrument or incorporate DOL’s wage determination retroactive to the beginning of the contract or ordering instrument by change order. The Loan Recipient’s contractor must be compensated for any increases in wages resulting from the use of DOL’s revised wage determination.
Appears in 1 contract
Samples: Loan Agreement
Obtaining Wage Determinations. (a) Subrecipients The Recipient must obtain proposed wage determinations for specific localities at xxx.xxxx.xxx. After the Subrecipient Recipient obtains its proposed wage determination, it must submit the wage determination to the Grant Officer identified in Section IX of Attachment A State Water Board for approval prior to inserting the wage determination into a solicitation, contract or issuing task orders, work assignments or similar instruments to existing contractors (ordering instruments unless subsequently directed otherwise by the State recipient Award OfficialWater Board.
(b) Subrecipients The Recipient shall obtain the wage determination for the locality in which a covered activity subject to DB will take place prior to issuing requests for bids, proposals, quotes or other methods for soliciting contracts (solicitation) for activities subject to DB. These wage determinations shall be incorporated into solicitations and any subsequent contracts. Prime contracts must contain a provision requiring that subcontractors follow the wage determination incorporated into the prime contract.
(i) While the solicitation remains open, the subrecipient Recipient shall monitor xxx.xxxx.xxx. on a weekly basis to ensure that the wage determination contained in the solicitation remains current. The subrecipients Recipient shall amend the solicitation if DOL issues a modification more than 10 days prior to the closing date (i.e. bid opening) for the solicitation. If DOL modifies or supersedes the applicable wage determination less than 10 days prior to the closing date, the subrecipients Recipient may request a finding from the State recipient Water Board that there is not a reasonable time to notify interested contractors of the modification of the wage determination. The State recipient Water Board will provide a report of its findings to the subrecipientRecipient.
(ii) If the subrecipient Recipient does not award the contract within 90 days of the closure of the AFT solicitation, any modifications or supersedes DOL makes to the wage determination contained in the solicitation shall be effective unless the State recipientWater Board, at the request of the subrecipientRecipient, obtains an extension of the 90 day period from DOL pursuant to 29 CFR 1.6(c)(3)(iv). The subrecipient Recipient shall monitor xxx.xxxx.xxx on a weekly basis if it does not award the contract within 90 days of closure of the solicitation to ensure that wage determinations contained in the solicitation remain current.
Appears in 1 contract
Samples: Project Finance Agreement
Obtaining Wage Determinations. (a) Subrecipients must obtain proposed wage determinations for specific localities at xxx.xxxx.xxx. After the Subrecipient obtains its proposed wage determination, it must submit the wage determination to the Grant Officer identified in Section IX of Attachment A for approval prior to inserting the wage determination into a solicitation, contract or issuing task orders, work assignments or similar instruments to existing contractors (ordering instruments unless subsequently directed otherwise by the State recipient Award Official.
(b) Subrecipients Sub recipients shall obtain the wage determination for the locality in which a covered activity subject to DB will take place prior to issuing requests for bids, proposalsBids, quotes or other methods for soliciting contracts (solicitation) for activities subject to DB. These wage determinations shall be incorporated into solicitations and any subsequent contracts. Prime contracts must contain a provision requiring that subcontractors follow the wage determination incorporated into the prime contract.
(i) While the solicitation remains open, the subrecipient sub recipient shall monitor xxx.xxxx.xxx. on a xxx.xxxx.xxx weekly basis to ensure that the wage determination contained in the solicitation remains current. The subrecipients sub recipients shall amend the solicitation if DOL issues a modification more than 10 days prior to the closing date (i.e. i.e., bid opening) for the solicitation. If DOL modifies or supersedes the applicable wage determination less than 10 days prior to the closing date, the subrecipients sub recipients may request a finding from the State recipient that there is not a reasonable time to notify interested contractors of the modification of the wage determination. The State recipient will provide a report of its findings to the subrecipientsub recipient.
(ii) If the subrecipient sub recipient does not award the contract within 90 days of the closure of the solicitation, any modifications or supersedes DOL makes to the wage determination contained in the solicitation shall be effective unless the State recipient, at the request of the subrecipientsub recipient, obtains an extension of the 90 day period from DOL pursuant to 29 CFR 1.6(c)(3)(iv). The subrecipient sub recipient shall monitor xxx.xxxx.xxx on a weekly basis if it does not award the contract within 90 days of closure of the solicitation to ensure that wage determinations contained in the solicitation remain current.
(b) If the sub recipient carries out activity subject to DB by issuing a task order, work assignment or similar instrument to an existing contractor (ordering instrument) rather than by publishing a solicitation, the sub recipient shall insert the appropriate DOL wage determination from xxx.xxxx.xxx into the ordering instrument.
(c) Sub recipients shall review all subcontracts subject to DB entered into by prime contractors to verify that the prime contractor has required its subcontractors to include the applicable wage determinations.
(d) As provided in 29 CFR 1.6(f), DOL may issue a revised wage determination applicable to a sub recipient’s contract after the award of a contract or the issuance of an ordering instrument if DOL determines that the sub recipient has failed to incorporate a wage determination or has used a wage determination that clearly does not apply to the contract or ordering instrument. If this occurs, the sub recipient shall either terminate the contract or ordering instrument and issue a revised solicitation or ordering instrument or incorporate DOL’s wage determination retroactive to the beginning of the contract or ordering instrument by change order. The sub recipient’s contractor must be compensated for any increases in wages resulting from the use of DOL’s revised wage determination.
Appears in 1 contract
Samples: Professional Services Agreement
Obtaining Wage Determinations. (a) Subrecipients must obtain proposed wage determinations for specific localities at xxx.xxxx.xxx. After the Subrecipient obtains its proposed wage determination, it must submit the wage determination to the Grant Officer identified in Section IX of Attachment A for approval prior to inserting the wage determination into a solicitation, contract or issuing task orders, work assignments or similar instruments to existing contractors (ordering instruments unless subsequently directed otherwise by the State recipient Award Official.
(b) Subrecipients The Recipient shall obtain the wage determination for the locality in which a covered activity subject to DB will take place prior to issuing requests for bids, proposals, quotes or other methods for soliciting contracts (solicitation) for activities subject to DB. These wage determinations shall be incorporated into solicitations and any subsequent contracts. Prime contracts must contain a provision requiring that subcontractors follow the wage determination incorporated into the prime contract.
(i) While the solicitation remains open, the subrecipient Recipient shall monitor xxx.xxxx.xxx. xxx.xxxx.xxx on a weekly basis to ensure that the wage determination contained in the solicitation remains current. The subrecipients Recipient shall amend the solicitation if DOL issues a modification more than 10 days prior to the closing date (i.e. bid opening) for the solicitation. If DOL modifies or supersedes the applicable wage determination less than 10 days prior to the closing date, the subrecipients Recipient may request a finding from the State recipient Water Board that there is not a reasonable time to notify interested contractors of the modification of the wage determination. The State recipient Water Board will provide a report of its findings to the subrecipientRecipient.
(ii) If the subrecipient Recipient does not award the contract within 90 days of the closure of the solicitation, any modifications or supersedes DOL makes to the wage determination contained in the solicitation shall be effective unless the State recipientWater Board, at the request of the subrecipientRecipient, obtains an extension of the 90 day period from DOL pursuant to 29 CFR 1.6(c)(3)(iv). The subrecipient Recipient shall monitor xxx.xxxx.xxx on a weekly basis if it does not award the contract within 90 days of closure of the solicitation to ensure that wage determinations contained in the solicitation remain current.
(b) If the Recipient carries out activity subject to DB by issuing a task order, work assignment or similar instrument to an existing contractor (ordering instrument) rather than by publishing a solicitation, the Recipient shall insert the appropriate DOL wage determination from xxx.xxxx.xxx into the ordering instrument.
(c) The Recipient shall review all subcontracts subject to DB entered into by prime contractors to verify that the prime contractor has required its subcontractors to include the applicable wage determinations.
(d) As provided in 29 CFR 1.6(f), DOL may issue a revised wage determination applicable to a Recipient’s contract after the award of a contract or the issuance of an ordering instrument if DOL determines that the Recipient has failed to incorporate a wage determination or has used a wage determination that clearly does not apply to the contract or ordering instrument. If this occurs, the Recipient shall either terminate the contract or ordering instrument and issue a revised solicitation or ordering instrument or incorporate DOL’s wage determination retroactive to the beginning of the contract or ordering instrument by change order. The Recipient’s contractor must be compensated for any increases in wages resulting from the use of DOL’s revised wage determination.