Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January 1, 2021.
Appears in 5 contracts
Samples: Request for Proposal (Rfp), Request for Proposal (Rfp), Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January November 1, 20212015.
Appears in 3 contracts
Samples: Lease Agreement, Request for Proposal (Rfp), Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January December 1, 20212010.
Appears in 3 contracts
Samples: Lease Agreement, Lease Agreement, Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January 1, 20212011.
Appears in 3 contracts
Samples: Lease Agreement, Lease Agreement, Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January April 1, 20212011.
Appears in 2 contracts
Samples: Lease Agreement, Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January March 1, 20212013.
Appears in 2 contracts
Samples: Lease Agreement, Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January December 1, 20212020.
Appears in 2 contracts
Samples: Request for Proposal (Rfp), Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January April 1, 20212014.
Appears in 2 contracts
Samples: Lease Agreement, Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January December 1, 20212013.
Appears in 2 contracts
Samples: Lease Agreement, Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January April 1, 20212022.
Appears in 2 contracts
Samples: Lease Agreement, Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January October 1, 20212016.
Appears in 2 contracts
Samples: Request for Proposal (Rfp), Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January June 1, 20212020.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January August 1, 20212016.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January June 1, 20212012.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January July 1, 20212020.
Appears in 1 contract
Samples: Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January October 1, 20212017.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January 131, 20212016.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January February 1, 20212022.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January August 1, 20212011.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January May 1, 20212016.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January March 1, 20212022.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January October 1, 20212011.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January October 1, 2021. 2022.
Appears in 1 contract
Samples: Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January August 1, 20212012.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January June 1, 20212013.
Appears in 1 contract
Samples: Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January September 1, 20212017.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January 1, 20212012.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January May 1, 20212019.
Appears in 1 contract
Samples: Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January November 1, 20212019.
Appears in 1 contract
Samples: Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January September 1, 20212020.
Appears in 1 contract
Samples: Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January 1, 20212013.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January July 1, 20212016.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January July 1, 20212013.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January May 1, 20212011.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January February 1, 2021.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January December 1, 20212014.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January June 1, 2021.
Appears in 1 contract
Samples: Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January March 1, 20212019.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January April 1, 20212015.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January April 1, 20212019.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January 1, 20212020.
Appears in 1 contract
Samples: Request for Proposal
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January 1December 13, 20212013.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January December 1, 20212018.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January March 1, 20212016.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January 1March 31, 20212017.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January 1, 20212016.
Appears in 1 contract
Samples: Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January February 1, 20212019.
Appears in 1 contract
Samples: Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January April 1, 20212018.
Appears in 1 contract
Samples: Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January September 1, 20212012.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January June 1, 20212019.
Appears in 1 contract
Samples: Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January October 1, 20212015.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January October 1, 20212018.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January 1October1, 20212018.
Appears in 1 contract
Samples: Request for Proposal (Rfp)
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January November 1, 20212018.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January March 1, 20212012.
Appears in 1 contract
Samples: Lease Agreement
Occupancy/Commencement. The Occupancy/Commencement Date is the latest date on which the improvements to the Premises are substantially complete and the Lessor secures a Certificate of Occupancy, or the Lessee begins beneficial use of the Premises. The Lessor will deliver the Premises to the Lessee no later than January December 1, 20212019.
Appears in 1 contract
Samples: Lease Agreement