Offsite Detention Pond Sample Clauses
The Offsite Detention Pond clause defines the requirements and responsibilities related to the construction, maintenance, or use of a stormwater detention facility located outside the primary project site. This clause typically specifies who is responsible for ensuring the pond meets regulatory standards, how access and maintenance will be managed, and may address cost-sharing or easement rights if the pond serves multiple properties. Its core function is to ensure proper stormwater management for the project, mitigating flood risks and complying with environmental regulations even when the necessary infrastructure is not located directly on the project site.
Offsite Detention Pond. DB Contractor shall design and construct the offsite detention pond at the approximate location shown in the Schematic Design. □ Appendix 1: DB Contractor’s Proposal Commitments □ Appendix 2: ATCs [To be inserted from Proposal]
Offsite Detention Pond. DB Contractor shall design and construct the offsite detention pond at the approximate location shown in the Schematic Design. □ Appendix 1: DB Contractor’s Proposal Commitments □ Appendix 2: ATCs [To be inserted from Proposal] The following table lists DB Contractor’s Alternative Technical Concepts (ATCs), which are described in further detail in the applicable ATC submittals, that DB Contractor may incorporate into the Project. TxDOT approves the Deviations listed below, subject to satisfaction of any conditions set forth in the approval letters from TxDOT to DB Contractor. Such Deviations, subject to satisfaction of any conditions to approval, expressly supersede any conflicting provisions in the Design-Build Specifications. No other Deviations are permitted in connection with the ATCs. DB Contractor is solely responsible for and bears the schedule and cost risk associated with the implementation or non-implementation of any ATC, including (a) obtaining any third party approvals (including Environmental Approvals and all other Governmental Approvals) required to implement the ATC, (b) the acquisition of any right of way outside the Schematic ROW that is necessary to implement the ATC, and (c) any studies, analyses or further environmental evaluations required to implement the ATC. Moreover, DB Contractor is not entitled to a Change Order for time or money as a result of (i) Site conditions (e.g., Hazardous Materials, Differing Site Conditions, geotechnical issues, Utilities, etc.) on such additional right of way, or (ii) any delay, inability or cost associated with the acquisition of right of way required to implement the ATC. The ATCs, to the extent utilized by DB Contractor, shall otherwise meet all requirements of the Design-Build Specifications.
Offsite Detention Pond. DB Contractor shall design and construct the offsite detention pond at the approximate location shown in the Schematic Design.
