Operation of Bucket. In placing concretes in large open areas, the bucket shall be spotted directly over the position designated and then lowered for dumping. The open bucket shall clear the concrete already in place and the height of drop; shall not exceed 1.0 m. The bucket shall be opened slowly to avoid high vertical bounce. Dumping of buckets on the swing or in any manner which results in separation of ingredients of disturbance of previously placed concrete will not be permitted.
Appears in 3 contracts
Samples: www.tniuscbe.org, www.tniuscbe.org, www.tniuscbe.org
Operation of Bucket. In placing concretes concrete in large open areas, the bucket shall be spotted directly over the position designated and then lowered for dumping. The open bucket shall just clear the concrete already in place and the height of drop; drop shall not exceed 1.0 m. 1.00 M. The bucket shall be opened slowly to avoid high vertical bounce. , Dumping of buckets on the swing swing, or in any manner which results in separation segregation of ingredients of disturbance or disturbances of previously placed concrete will not be permitted.
Appears in 1 contract
Samples: geerfoundation.gujarat.gov.in