Optical Fibre. 3.1 Where optical fibre is required to be used by Operator in terms of the Interconnection Agreement: 3.1.1 The Operator shall use its own fibre optic cable en-route to Co-Location Site point of termination with a minimum installed capacity of STM-4. 3.1.2 Fibre optical cable routes within the Co-Location Site shall be specified by PMCL. 3.1.3 The Operator shall traverse a maximum of four (4) pair Optical Fibre Cable through the duct as provided by PMCL at its Co-Location Site and shall properly terminate in the Optical Fibre Distribution Frame (OFDF) housed in the cabinet installed by the Operator for Interconnection purpose as part of Interconnection Equipment at Operator’s cost. 3.1.4 The Operator shall interface at E1 level with PMCL Network 3.1.5 All the necessary multiplexing and de-multiplexing shall be done by the Operator at its own cost. 3.1.6 The Operator shall ensure that no safety hazards result due to laser and related optical pulses emanating from the equipment. 3.1.7 The Operator shall follow ITU standards G.911, G.957, G.958, G.959.1.
Appears in 4 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement