Parallel Generation Interconnections Sample Clauses

Parallel Generation Interconnections. For Parallel Generation Interconnections a Distribution Facility Interconnection Agreement will be provided that is separate from the Application. A proforma Distribution Facility Interconnection Agreement template is provided in Appendix E. For both ‘approved’ and ‘conditionally’ approved Parallel Generation Applications, the Applicant will receive an Interconnection ‘pre-approval’ notification by e-mail informing them of the results of the technical review. With the pre-approval notification, the Company will provide the Applicant with a DER Facility-specific Distribution Facility Interconnection Agreement that outlines all of the technical, operational, and financial requirement and commitments of the Customer and Company. When the Customer signs and returns the Distribution Facility Interconnection Agreement, it is then counter-signed and dated by the Company. Once signed and dated by the Company, the DER Facility Interconnection is approved and the process may proceed with STEP 8.
AutoNDA by SimpleDocs
Parallel Generation Interconnections. Company requires that all Parallel Generation Interconnections include a Customer provided meter socket/enclosure for a Company generation production meter to measure the total AC output of all generation units. When practical, the generation production meter should be installed adjacent to the Company’s service meter. If a DER Facility is required to provide telemetry to the Company, the generation production metering may also be used in some situations to provide a portion of the required telemetry data.

Related to Parallel Generation Interconnections

  • Network Interconnection 26.1 Interconnection between the networks of different SERVICE PROVIDERs shall be as per National Standards of CCS No.7 issued from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations issued by the TRAI from time to time. However, if situation so arises, INTERCONNECTION with R2MF signaling may be permitted by LICENSOR.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

  • Energy Resource Interconnection Service (ER Interconnection Service).

Time is Money Join Law Insider Premium to draft better contracts faster.