Performance of Xxxxxxxx’s Algorithm Sample Clauses

Performance of Xxxxxxxx’s Algorithm. At the “bottom level” of the recursive algorithm we used the point LU fac- torization algorithm from LAPACK [1]. The matrix multiplications were carried out using an implementation of Strassen’s matrix-matrix multiplica- tion routine, using a CMSSL routine (Version 3.0) for matrix-matrix multi- plication at the bottom level; see [7] for details. No stabilization was added in these timing-tests. Both A and b consist of elements from a rectangular distribution in the interval [−2, 2]. Computation of the approximate inverse is carried out in single precision. On the CM–200, this is advantageous because single precision computations are twice as fast as double precision computations. On the CM–5, they are performed with the same speed, so on this machine there is no reason to switch to single precision. The remaining tasks are performed in double pre- cision: x˜ = A˜−1 b is computed, and then x˜ is refined using standard iterative refinement. No extended precision is used in computing the residuals. Test were carried out with various levels of recursion, and the results are shown as the crosses in Figure 5.1. The number p at each cross is the recursion level, meaning that the smallest block size was n/2p × n/2p. The execution times are measured in seconds, and they include the time for a fixed number of 5 steps of iterative improvement. We also show the performance of the CMSSL LU factorization routine, including forward and back substitutions. For comparison, Figure 5.1 also shows the execution time of the point algorithm from LAPACK (that was used at the bottom level of Strassen’s algorithm) when applied to the full matrix. We make the following remarks about the results: • Xxxxxxxx’s method is able to speed up significantly the performance of the underlying point LU factorization algorithm. • The performance of Xxxxxxxx’s method depends greatly on the number of recursion levels. • The optimal number of recursions depends on the matrix order n. The dependence of the optimal recursion level on the matrix size is not surprising, as the overhead increases for each recursion level. The optimal number of recursion levels is very difficult to predict a priori, since per- formance of the algorithm depends on several factors, such as the number of matrix-matrix multiplications and additions, and the nearest-neighbor communication. Regarding the first issue, we note that Xxxxxxxx’s matrix-matrix multi- plication algorithm seems to perform better on the MasPar MP–1, w...
AutoNDA by SimpleDocs

Related to Performance of Xxxxxxxx’s Algorithm

  • Performance of Work by City If the Contractor fails to perform the Work in accordance with the schedule referred to in section 2 above, the City may, in its discretion, in order to bring the project closer to the schedule, perform or cause to be performed some or all of the Work, and doing so shall not waive any of the City’s rights and remedies. Before doing so, the City shall give the Contractor notice of its intention. The Contractor shall reimburse the City for additional costs incurred by the City in exercising its right to perform or cause to be performed some or all of the Work pursuant to this section.

  • Performance of Service 2.1 Appendix A (General Provisions), Articles 1 through 16, governs the performance of services under this contract. 2.2 Appendix B sets forth the liability and insurance provisions of this contract. 2.3 Appendix C sets forth the services to be performed by the contractor.

  • Performance of Services The Contractor is responsible for fully meeting all obligations set forth in the Contract and for providing Product in accordance with the Contract or any Authorized User Agreement.

  • PERFORMANCE OF THE CONTRACT II.1.1. The Contractor shall perform the Contract to the highest professional standards. The Contractor shall have sole responsibility for complying with any legal obligations incumbent on him, notably those resulting from employment, tax and social legislation. II.1.2. The Contractor shall have sole responsibility for taking the necessary steps to obtain any permit or licence required for performance of the Contract under the laws and regulations in force at the place where the tasks assigned to him are to be executed. II.1.3. Without prejudice to Article II.3 any reference made to the Contractor’s staff in the Contract shall relate exclusively to individuals involved in the performance of the Contract. II.1.4. The Contractor must ensure that any staff performing the Contract have the professional qualifications and experience required for the execution of the tasks assigned to them. II.1.5. The Contractor shall neither represent the Agency nor behave in any way that would give such an impression. The Contractor shall inform third parties that he does not belong to the European public service. II.1.6. The Contractor shall have sole responsibility for the staff who execute the tasks assigned to him. II.1.7. In the event of disruption resulting from the action of a member of the Contractor's staff working on Agency premises or in the event of the expertise of a member of the Contractor's staff failing to correspond to the profile required by the Contract, the Contractor shall replace him without delay. The Agency shall have the right to request the replacement of any such member of staff, stating its reasons for so doing. Replacement staff must have the necessary qualifications and be capable of performing the Contract under the same contractual conditions. The Contractor shall be responsible for any delay in the execution of the tasks assigned to him resulting from the replacement of staff in accordance with this Article. II.1.8. Should any unforeseen event, action or omission directly or indirectly hamper execution of the tasks, either partially or totally, the Contractor shall immediately and on his own initiative record it and report it to the Agency. The report shall include a description of the problem and an indication of the date on which it started and of the remedial action taken by the Contractor to ensure full compliance with his obligations under the Contract. In such event the Contractor shall give priority to solving the problem rather than determining liability. II.1.9. Should the Contractor fail to perform his obligations under the Contract in accordance with the provisions laid down therein, the Agency may - without prejudice to its right to terminate the Contract - reduce or recover payments in proportion to the scale of the failure. In addition, the Agency may impose penalties or liquidated damages provided for in Article II.16.

  • Performance Evaluation The Department may conduct a performance evaluation of Contractor’s Services, including Contractor’s Subcontractors. Results of any evaluation may be made available to Contractor upon request.

  • Performance of Agreement Seller and its Affiliates shall have performed in all material respects all of their covenants, agreements and obligations required by this Agreement to be performed or complied with by them prior to or upon the Closing.

  • Performance Evaluations The Contractor is subject to an annual performance evaluation to be conducted by NYCDOT pursuant to the PPB Rules.

  • Performance of the Work The Contractor shall perform all of the Work required for the complete and prompt execution of everything described or shown in, or reasonably implied from the Contract Documents for the above referenced Project.

  • Performance of Reviews The RIRs shall send a request for review to the Operator per email, where they shall specify the areas they request a review for. The Operator must comply with the request by providing the requested information within working days. The review may include an onsite inspection. In this case the RIRs and the Operator must agree on a specific date for the inspection to take place, which may not be later than sixty calendar days from the date of the request.

  • Performance of Work a. Contractor shall perform all Work in a good and workmanlike manner. Contractor shall maintain sufficient staff and crews to perform all Work in an expeditious manner consistent with the interests of the Park District. Contractor shall promptly notify the Park District immediately in writing: (i) of any information required from the Park District and necessary for Contractor to complete its Work in a timely manner; and (ii) of any Work requested by the Park District or required for the project that is not included in the scope of Work reflected in the Contract Documents. Contractor shall be solely responsible for means and methods selected in performing the Work. Contractor shall supervise all Work so that it is performed in a safe and expeditious manner. Contractor shall be solely responsible for the Work of its employees and its subcontractors’ and suppliers’ employees. Contractor shall keep all documents and information related to the project confidential and, except as required by law, shall not disclose such documents or information to any person or other party except the employees of Contractor and its subcontractors who need such documents or information to perform the Work and complete the project. b. Contractor shall confine all equipment, the storage of materials and the operations of its workers, to limits indicated by law, ordinances, permits, or directions of the Park District and shall not unreasonably encumber the project site with such materials. The project site shall not be utilized for the storage of vehicles, materials, equipment, or fixtures not intended for the Work to be performed. c. Contractor shall notify all utility companies, public and private, as necessary in advance of commencing performance of the Work. The responsibility for moving water lines, gas lines, wire lines, service connections, water and gas meter boxes, water and gas valve boxes, light standards, cable ways, signals and all other utility appurtenances which are within the limits of the proposed construction will be assumed by the Contractor, at no additional compensation. The Contractor shall verify the location of all utilities prior to the start of construction and shall be responsible for the preservation of existing utility installation and the cost of providing precautionary supports, braces, or other equipment to insure against damage to said utility installation. The cost to repair and replace any new or existing utilities damaged will be paid for by the Contractor. d. If Contractor uncovers or discovers any concealed condition differing materially from conditions depicted in the Contract Documents or differing from conditions reasonably anticipated or inherent in the Work, Contractor shall immediately stop the Work and notify the Park District of the condition in writing. The Park District shall then issue written directions. Contractor shall not proceed with the Work until the Park District has issued written directions. The contract time and Contract Sum shall be equitably adjusted if necessitated by such directions of the Park District.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!