Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter: o A list of the permits that identifies: (1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable)
Appears in 175 contracts
Samples: Division Agreement, Epc Agreement, Epc Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • ● Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • ● If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • ● Send the CAM a Copy of Each Approved Permit. • ● If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • ● Permit Status Letter • ● Updated List of Permits (if applicable) • ● Updated Schedule for Acquiring Permits (if applicable) • ● Copy of Each Approved Permit (if applicable)
Appears in 20 contracts
Samples: Grant Agreement, Division Agreement, Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o • The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each each Approved Permit (if applicable)
Appears in 10 contracts
Samples: Epc Agreement, Grant Agreement, Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each each Approved Permit (if applicable)
Appears in 9 contracts
Samples: Division Agreement, Epc Agreement, Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. • The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable)
Appears in 5 contracts
Samples: Grant Agreement, Grant Agreement, Agreement Fpi 19 021
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient Contractor may incur any costs related to the use of the permit(s) for which the Recipient Contractor will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient Contractor will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-Kick- off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each each Approved Permit (if applicable)
Appears in 2 contracts
Samples: Operational Agreement, Operational Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each each Approved Permit (if applicable)
Appears in 2 contracts
Samples: Grant Agreement, Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits Uno permitsU are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable)
Appears in 2 contracts
Samples: Epc Agreement, Agreement Pir 16 016
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable)
Appears in 1 contract
Samples: Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipientsRecipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • ● Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • ● If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • ● Send the CAM a Copy of Each Approved Permit. • ● If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 five days. Either of these events may trigger a CPR meeting. • ● Permit Status Letter • ● Updated List of Permits (if applicable) • ● Updated Schedule for Acquiring Permits (if applicable) • ● Copy of Each Approved Permit (if applicable)
Appears in 1 contract
Samples: Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the lettertheletter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable)
Appears in 1 contract
Samples: Division Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o • The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable)
Appears in 1 contract
Samples: Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipientsContractors. Permits must be identified and obtained before the Recipient Contractor may incur any costs related to the use of the permit(s) for which the Recipient Contractor will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient Contractor will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each each Approved Permit (if applicable)
Appears in 1 contract
Samples: Operational Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • ● Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • ● If during the course of the Agreement Agreement, additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • ● Send the CAM a Copy of Each Approved Permit. • ● If during the course of the Agreement Agreement, permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • ● Permit Status Letter • ● Updated List of Permits (if applicable) • ● Updated Schedule for Acquiring Permits (if applicable) • ● Copy of Each Approved Permit (if applicable)
Appears in 1 contract
Samples: Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement. Therefore, with the exception of costs incurred by University of California recipientsbudget for this subtask will be zero dollars. Permits must be identified and obtained before the Recipient Contractor may incur any costs related to the use of the permit(s) for which the Recipient Contractor will request reimbursement. The Contractor shall: • Prepare a Permit Status Letter that documents the permits required to conduct this AgreementAgreement and submit it to the CAM at least 2 working days prior to the kick-off meeting. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient Contractor will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter (if applicable) • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each each Approved Permit (if applicable)
Appears in 1 contract
Samples: Operational Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-Kick- off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable)
Appears in 1 contract
Samples: Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient recipient may incur any costs related to the use of the permit(s) for which the Recipient recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable)
Appears in 1 contract
Samples: Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • o If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable).
Appears in 1 contract
Samples: Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each each Approved Permit (if applicable)Permit
Appears in 1 contract
Samples: Epc Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipientsRecipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable)
Appears in 1 contract
Samples: Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient Contractor may incur any costs related to the use of the permit(s) for which the Recipient Contractor will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient Contractor will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable)
Appears in 1 contract
Samples: Operational Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient Contractor may incur any costs related to the use of the permit(s) for which the Recipient Contractor will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient Contractor will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each each Approved Permit (if applicable)
Appears in 1 contract
Samples: Division Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetingsCPRmeetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meetingCPRmeeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable)
Appears in 1 contract
Samples: Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable)
Appears in 1 contract
Samples: Epc Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each each Approved Permit (if applicable)
Appears in 1 contract
Samples: Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient Contractor may incur any costs related to the use of the permit(s) for which the Recipient Contractor will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits Uno permitsU are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient Contractor will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each each Approved Permit (if applicable)
Appears in 1 contract
Samples: Operational Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement. Therefore, with the exception of costs incurred by University of California recipientsbudget for this subtask will be zero dollars. Permits must be identified and obtained before the Recipient Contractor may incur any costs related to the use of the permit(s) for which the Recipient Contractor will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this AgreementAgreement and submit it to the CAM at least 2 working days prior to the kick-off meeting. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient Contractor will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter (if applicable) • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each each Approved Permit (if applicable)
Appears in 1 contract
Samples: Operational Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • The Recipient shall: ● Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • meetings. ● If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • ● Send the CAM a Copy of Each Approved Permit. • ● If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Products: ● Permit Status Letter • ● Updated List of Permits (if applicable) • ● Updated Schedule for Acquiring Permits (if applicable) • ● Copy of Each Approved Permit (if applicable)
Appears in 1 contract
Samples: Grant Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
: (1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter • Updated List of Permits (if applicable) • Updated Schedule for Acquiring Permits (if applicable) • Copy of Each Approved Permit (if applicable)
Appears in 1 contract
Samples: Epc Agreement
Permits. The goal of this subtask is to obtain all permits required for work completed under this Agreement in advance of the date they are needed to keep the Agreement schedule on track. Permit costs and the expenses associated with obtaining permits are not reimbursable under this Agreement, with the exception of costs incurred by University of California recipients. Permits must be identified and obtained before the Recipient may incur any costs related to the use of the permit(s) for which the Recipient will request reimbursement. • Prepare a Permit Status Letter that documents the permits required to conduct this Agreement. If no permits are required at the start of this Agreement, then state this in the letter. If permits will be required during the course of the Agreement, provide in the letter:
o A list of the permits that identifies:
(1) the type of permit; and (2) the name, address, and telephone number of the permitting jurisdictions or lead agencies. o • The schedule the Recipient will follow in applying for and obtaining the permits. The list of permits and the schedule for obtaining them will be discussed at the Kick-off meeting (subtask 1.2), and a timetable for submitting the updated list, schedule, and copies of the permits will be developed. The impact on the project if the permits are not obtained in a timely fashion or are denied will also be discussed. If applicable, permits will be included as a line item in progress reports and will be a topic at CPR meetings. • If during the course of the Agreement additional permits become necessary, then provide the CAM with an Updated List of Permits (including the appropriate information on each permit) and an Updated Schedule for Acquiring Permits. • Send the CAM a Copy of Each Approved Permit. • If during the course of the Agreement permits are not obtained on time or are denied, notify the CAM within 5 days. Either of these events may trigger a CPR meeting. • Permit Status Letter Letter. • Updated List of Permits (if applicable) ). • Updated Schedule for Acquiring Permits (if applicable) ). • Copy of Each each Approved Permit (if applicable).
Appears in 1 contract
Samples: Grant Agreement