Plans and Drawings Sample Clauses

Plans and Drawings. As soon as available, plans and specifications and as-built drawings for the Facility including the civil and architectural works.
AutoNDA by SimpleDocs
Plans and Drawings. (a) Builder shall submit three (3) hard copies and a copy in electronic format of all plans and drawings for which Buyer’s approval is required in accordance with the Specifications, and shall also submit such other technical information as Buyer shall reasonably require, to Buyer, with three (3) copies to Charterer, each at its address as set forth in Clause 19 hereof. If requested by Buyer, electronic copies of all plans and drawings shall be submitted to Buyer and Charterer through an online document management system. Buyer shall, within twenty-eight (28) days after receipt thereof, return to Builder one (1) copy of such plans and drawings, with Buyer’s approval or comments (if any) written thereon. Promptly after the Effective Date, Builder and Buyer shall agree on a schedule for the submission to Buyer of the plans and drawings to be submitted by Builder. The objective of Buyer and Builder shall be the establishment of a schedule not placing undue burden on Buyer to review and respond to Builder, while at the same time being mindful of the construction schedule of Builder. (b) Builder shall comply with Buyer’s remarks and amendments (if any) on plans and drawings submitted pursuant to this Clause, if such remarks or amendments are not of such a nature or extent as to constitute modifications of the Specifications. (c) In the event that Buyer shall fail to return the plans and drawings to Builder within the time limit as hereinabove provided, such plans and drawings shall be deemed to have been automatically approved without any comment unless Buyer has requested in writing an extension of the deadline to submit its comments and in such instance Buyer shall have a further three (3) days from the date of such request to submit its comments. If Buyer’s comments on the plans and drawings that are returned to Builder by Buyer are not clearly specified or detailed, then Buyer shall, within six (6) days after receipt of Builder’s written request, clarify such comments. (d) Builder shall: (i) ensure that the Classification Society provides Buyer and Charterer with copies of all technical correspondence between the Classification Society and Builder; and (ii) provide Buyer and Charterer with copies of all technical correspondence between the licensor of the containment system and Builder, in each case related to the construction of the Vessel. (e) Nothing in this Clause shall affect Builder’s obligation to design, construct and deliver the Vessel in accordanc...
Plans and Drawings. Notwithstanding the Article IV of the CONTRACT for the VESSEL, the plans and drawings submitted or to be submitted to and approved or to be approved by the buyer for the BUILDER’s Hull No. 2748 shall apply automatically to the VESSEL. Therefore, no further separate approval procedures of the plans and drawings shall be necessary for the VESSEL under the CONTRACT except where changes to the rules and regulations and any other agreed modifications necessitate changes to the plans and drawings of the BUILDER’s Hull No. 2748.
Plans and Drawings. As soon as available, plans and specifications and as-built drawings for the Facility including the civil and architectural works. (i) Quality Control Programs
Plans and Drawings. 25.1 In the event the bid is accepted the contractor shall have to supply 5 copies of detailed design of units and structural design calculations with drawings showing plan, cross-section, elevations, mechanical equipments clearly to the complete satisfaction of the Employer and within a reasonable time fixed by the Employer. 25.2 The Contractor shall submit the following information, in 5 copies to the Engineer-in-charge for approval within the time stipulated against each item below: (a) a general layout plan of construction plant and equipment for the execution of the work, within 30 days from the date of notice to proceed with the work; (b) drawings or plan showing the location of major plants and other facilities which he proposes to put up at the site, including any changes in the general layout, at least 14 days prior to the commencement of the respective work; and (c) any other details and drawings as required under contract at the times specified in the contract. (d) detail design of units and structural design calculations with drawings showing plan, cross section, elevation.
Plans and Drawings. Notated Drawings comprising sheets numbered to The Specification The Builder’s scope of work for the Building Work or other document describing and/or providing a breakdown of the Building Work and materials that will be required to construct the Building and listing any Building Work or materials that are the Owner’s responsibility Any Addition or Modification to the Specification Name(s) of Owner(s) THE PARTIES AGREE as follows:
Plans and Drawings. Upon the expiration of the term or sooner termination of this Lease, or the completion of construction of any material Leased Premises Improvements, Lessee shall promptly provide to AFRH full “as-built” drawings, plans and specifications for the Leased Premises in ACAD format on CDs or DVDs, at no additional cost to AFRH, to the extent that Lessee is in good faith able to obtain such “as-builts” from its contractors. To the extent that it is not able to provide “as-built” drawings, plans and specifications, Lessee shall instead provide AFRH with the corresponding construction drawings, plans and specifications in ACAD format on CDs or DVDs.
AutoNDA by SimpleDocs
Plans and Drawings i) The SELLER shall submit to the Buyer three (3) copies of each of the class approved plans and drawings for reference purpose only. ii) The SELLER undertakes to deliver to the Buyer the following drawings: SHIP STRUCTURE: General Arrangement Midship Section (Showing longitudinal and transverse material) Capacity Plan Lines Plan Longitudinal Plan Drawings of Shell Expansion Drawings of Oil tight and Watertight bulkheads Drawings of all Double Bottom Construction Drawings of Fire Division Zone Drawings of Cargo holds and Container stowage on deck Drawing of Cargo holds Ventilation Drawings of Aft end construction Drawings of Engine Room construction Drawings of Engine Thrust Seating Drawings of Fore End Construction Drawings of Xxxxx frame Drawings of Rudder, Stock and Tiller Preliminary Loading Manuals Welding Details Date: 13th November, 2013
Plans and Drawings i) The SELLER shall submit to the Buyer three (3) copies of each of the class approved plans and drawings for reference purpose only. ii) The SELLER undertakes to deliver to the Buyer the following drawings: SHIP STRUCTURE: General Arrangement Midship Section (Showing longitudinal and transverse material) Capacity Plan Lines Plan Longitudinal Plan Drawings of Shell Expansion Drawings of Oil tight and Watertight bulkheads Drawings of all Double Bottom Construction Drawings of Fire Division Zone Drawings of Cargo holds and Container stowage on deck Drawing of Cargo holds Ventilation Drawings of Aft end construction Drawings of Engine Room construction Drawings of Engine Thrust Seating Drawings of Fore End Construction Drawings of Xxxxx frame Drawings of Rudder, Stock and Tiller Preliminary Loading Manuals Welding Details Date: 13th November, 2013 Detailed Drawings of the Engine Room Arrangement All Shafting, Thrust, Intermediate and Tail Xxxxx Xxxx Arrangement Calculations for Shaft Vibration (torsional, Axial and lateral) Calculations for Heat Balance Piping Schemes of Ballast, Bilge, Fuel oil, Lub. Oil, Air and Sounding, Engine Room Ventilation, Compressed Air, Sanitary Water, Fire Fighting Water Main and Emergency Switchboard, Main Cable Route One Line Diagram Calculations for Electric Balance iii) The plans and drawings approved by the Class shall be final, and any alteration thereof shall be regarded as modification specified in ARTICLE V.
Plans and Drawings. See Exhibit A-2.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!