Design and Drawings. (i) Design and Drawings shall be developed in conformity with the Specifications and Standards set forth in Schedule-D. In the event, the Contractor requires any relaxation in design standards due to restricted Right of Way in any section, the alternative design criteria for such section shall be provided for review and approval of the Authority’s Engineer.
(ii) The Contractor shall appoint a proof check consultant (the “Proof Consultant”) after proposing to the Authority a panel of three (3) names of qualified and experienced firms from whom the Authority may choose one (1) to be the Proof Consultant. Provided, however, that if the panel is not acceptable to the Authority and the reasons for the same are furnished to the Contractor, the Contractor shall propose to the Authority a revised panel of three (3) names from the firms empanelled as proof consultants by the [Ministry of Road Transport and Highways] for obtaining the consent of the Authority. The Contractor shall also obtain the consent of the Authority for two (2) key personnel of the Proof Consultant who shall have adequate experience and qualifications in highways and bridges respectively. The Authority shall, within 15 (fifteen) days of receiving a proposal from the Contractor hereunder, convey its decision, with reasons, to the Contractor, and if no such decision is conveyed within the said period, the Contractor may proceed with engaging of the Proof Consultant.
(iii) The Proof Consultant shall:
(a) evolve a systems approach with the Design Director so as to minimise the time required for final designs and construction drawings; and
(b) proof check the detailed calculations, drawings and designs, which have been approved by the Design Director.
(iv) In respect of the Contractor’s obligations with respect to the design and Drawings of the Project Highway as set forth in Schedule-I, the following shall apply:
(a) The Contractor shall prepare and submit, with reasonable promptness and in such sequence as is consistent with the Project Completion Schedule, three (3) copies each of the design and Drawings, duly certified by the Proof Consultant, to the Authority’s Engineer for its approval. Provided, however, that in respect of Major Xxxxxxx and Structures, the Authority’s Engineer may require additional drawings for approval in accordance with Good Industry Practice.
(b) by submitting the Drawings for review and approval to the Authority’s Engineer, the Contractor shall be deemed to have represen...
Design and Drawings. Design and Drawings shall be developed in conformity with the Specifications and Standards set forth in Schedule-D. In the event, the Contractor requires any relaxation in design standards due to restricted Right of Way in any section, the alternative design criteria for such section shall be provided for review and approval of the Authority’s Engineer.
Design and Drawings. Before actual fabrication is started, detailed working drawings should be furnished by the Contractor to'the Superintending Engineer….., Department, Corporation of Chennai for approval where section specified in the drawings are not readily available the use of alternative sections for fabrications will be considered and the alternate sections will be allowed to the firm payment to the Contractor will be based on the total weight of steel work done.
Design and Drawings. (i) Design and Drawings shall be developed in conformity with the Specifications and Standards set forth in Schedule-D. In the event, the Contractor requires any relaxation in design standards due to restricted Right of Way in any section, the alternative design criteria for such section shall be provided for review and approval of the Authority’s Engineer.
(ii) The Contractor shall appoint a proof check consultant (the “Proof Consultant”) after proposing to the Authority a panel of three (3) names of qualified and experienced firms from whom the Authority may choose one (1) to be the Proof Consultant. Provided, however, that if the panel is not acceptable to the Authority and the reasons for the same are furnished to the Contractor, the Contractor shall propose to the Authority a revised panel of three (3) names from the firms empanelled as proof consultants by the [Ministry of Road Transport and Highways] for obtaining the consent of the Authority. The Contractor shall also obtain the consent of the Authority for two (2) key personnel of the Proof Consultant who shall have adequate experience and qualifications in highways and bridges respectively. The Authority shall, within 15 (fifteen) days of receiving a proposal from the Contractor hereunder, convey its decision, with reasons, to the Contractor, and if no such decision is conveyed within the said period, the Contractor may proceed with engaging of the Proof Consultant.
(iii) The Proof Consultant shall:
Design and Drawings. In respect of the Contractor’s obligations with respect to the Design and Drawings of the LTTD Plant Project, the following shall apply:
Design and Drawings. 10.2.1 Design and Drawings shall be developed in conformity with the Specifications and Standards set forth in Schedule-D. 10.2.2 Deleted 10.2.3 Deleted
Design and Drawings. 10.2.1 Design and Drawings shall be developed in conformity with the Specifications and Standards set forth in Schedule-D. The Design Phase shall immediately commence upon issuance of LOA to the Contractor. Contractor’s submittals during Design Phase for the Scope of Works shall include the following stages;-
1) Design Development (DD) stage
2) Detailed Design Stage (DTD)
3) Working Drawings (WD) or Good For Construction Drawings(GFC)
4) Shop Drawings (SHD)
5) As-Built Drawings (ABD)
i. Design Development (DD) stage: It shall be sufficiently detailed to show all the main elements of the design and documents required for preparation of the Detailed Design stage drawings. It shall include, but not be limited to, the following ⮚ Report on compliance with the design criteria and all applicable codes and statutory regulations. ⮚ Submission of design manuals ⮚ Preliminary off site testing recommendation ⮚ References to the relevant design codes and standards ⮚ General arrangement of drawings, plans, elevations, and sections at suitable scale ⮚ Calculations and drawings for all structures. ⮚ Finishes and landscape schedule for the works ⮚ Design submission programme/schedule with approval schedule for completion of Project ⮚ Drawings/ reports of project site surveys in reference to Survey of India reference points and other field investigations ⮚ 3D renderings, visuals, and animations as required ⮚ Design simulation, if required. Design manual: Contractor shall submit the complete process, timelines/schedules for all the deliverables to be provided to complete the detailed design
ii. Detailed Design (DD) stage submission shall be a coherent and complete set of documents properly consolidated and indexed and shall fully describe the proposed design. All disciplines of works which are inter-dependent shall be submitted together in a single submission. In particular, and where appropriate, it shall include, but not be limited to the following -
Design and Drawings. (i) In respect of the Contractor’s obligations with respect to the design and Drawings of the Project Highway as set forth in Schedule-I, the following shall apply:
(a) The Contractor shall prepare and submit, with reasonable promptness and in such sequence as is consistent with the Project Completion Schedule, three (3) copies, to the Authority’s Engineer for its approval. Provided, (ii) deleted.
Design and Drawings. 1.26.1 The Lessee shall, subject to the Minimum Development Requirements prescribed for the Project in the Lease cum Development Agreement, at its cost, charges and expenses cause drawings [“Drawings”] to be prepared showing the proposed up- gradation / development / new construction in all Phases applicable for the Project including Phase III and submit copies of the drawings to DOT and / or any other official / agency designated by DOT for the purpose of monitoring; Provided that, the Lessee shall in any event, be solely responsible for the adequacy of the Drawings.
1.26.2 Drawings relating to the Project shall be subject to review by DOT and / or any other official / agency designated by DOT for the purpose of monitoring hereinafter provided in the succeeding clause.
1.26.3 By forwarding the Drawings for review to DOT and / or any other official / agency designated by DOT for the purpose of monitoring - the Lessee represents that it has determined and verified that the design and related aspects of the Project are in conformity with the Minimum Development Requirements set forth in the Lease cum Development Agreement.
Design and Drawings. 1.26.1 The Lessee shall, subject to the Minimum Development Requirements prescribed for the Project in the Lease cum Development Agreement, at its cost, charges and expenses cause drawings [“Drawings”] to be prepared showing the proposed up- gradation / development / new construction in all Phases applicable for the Project including Phase III as specified in Schedule III: Phase-wise Minimum Development Requirements and submit copies of the drawings to DOT and / or any other official / agency designated by DOT for the purpose of monitoring; Provided that, the Lessee shall in any event, be solely responsible for the adequacy of the Drawings.
1.26.2 Drawings relating to the Project shall be subject to review by DOT and / or any other official / agency designated by DOT for the purpose of monitoring hereinafter provided in the succeeding clause.
1.26.3 By forwarding the Drawings for review to DOT and / or any other official / agency designated by DOT for the purpose of monitoring - the Lessee represents that it has determined and verified that the design and related aspects of the Project are in conformity with the Minimum Development Requirements set forth in the Lease cum Development Agreement.