Common use of Plant and Equipment Clause in Contracts

Plant and Equipment. 1.1 The plant and equipment installed at or near the Premises Supply Meter Point comprises the following: (i) the National Grid Gas Minimum Offtake Facilities: [ ]mm valve and associated monitoring and control equipment installed at or immediately upstream of the Premises Supply Meter Point; (ii) the Operator Offtake Facilities: plant and equipment installed and owned by the Operator for purposes connected with the offtake of gas from the System and including filters [pre-heaters], [regulators,] measurement [and telemetry] equipment and all associated pipework and equipment installed at or immediately downstream of the Premises Supply Meter Point. as described in more detail in Annex B. 1.2 For the purposes of determining the period referred to in Section J4.4.5(b)(ii) (and without prejudice to Clause 7.1), where National Grid Gas has been notified of a requirement for maintenance of or failure or defect in the National Grid Gas Minimum Offtake Facilities: (a) National Grid Gas will: (i) arrange for an engineer to attend at the National Grid Gas Minimum Offtake Facilities within six (6) hours after National Grid Gas being so notified for the purposes of assessing the maintenance, repair or replacement works required; and (ii) unless such works can be carried out by the engineer upon such visit, prepare and submit to the Operator and Relevant Shipper(s) a programme for the carrying out of the works with all reasonable diligence; (b) where the engineer carries out such works upon such visit, the period referred to in that Section shall be deemed to expire when such works are completed; (c) except as provided in paragraph (b), the period referred to in that Section will be the period expiring at the end of the period provided for in the programme provided under paragraph (a)(ii), with any reasonable extensions necessitated by any failure of the Operator to provide reasonable access and co-operation to National Grid Gas in the carrying out of the required works. 1.3 The pre-heating equipment specified on the diagram in Annex B will be set to indicate a temperature of gas made available for offtake of [ ] degrees Celsius [( ) oC.]

Appears in 4 contracts

Samples: Network Exit Agreement, Network Exit Agreement, Network Exit Agreement

AutoNDA by SimpleDocs

Plant and Equipment. 1.1 1.1. The plant and equipment installed at or near the Premises Supply Meter Point comprises the following: (i) the National Grid Gas Minimum Offtake Grid’s Facilities: [ ]mm valve and associated monitoring and control equipment installed at or immediately upstream of the Premises Supply Meter Point; (ii) the Operator Offtake [ABC]’s Facilities: plant and equipment installed and owned by the Operator [ABC] for purposes connected with the offtake of gas from the National Transmissi on System and including filters [pre-heaters], [regulators,] , measurement [and telemetry] telemetry equipment and all associated pipework and equipment installed at or immediately downstream of the Premises Supply Meter Point. as described in more detail in Annex B.Schedule 2. 1.2 1.2. For the purposes of determining the period referred to in UNC TPD Section J4.4.5(b)(ii) (and without prejudice to Clause 7.18.1), where National Grid Gas has been notified of a requirement for maintenance of or failure or defect in the National Grid Gas Minimum Offtake Grid’s Facilities: (a) National Grid Gas will: (i) arrange for an engineer to attend at the National Grid Gas Minimum Offtake Grid’s Facilities within six (6) hours after National Grid Gas being so notified for the purposes of assessing assessi ng the maintenance, repair or replacement works required; and (ii) unless such works can be carried out by the engineer upon such visit, prepare and submit to the Operator [ABC] and Relevant Shipper(sRegistered User(s) a programme for the carrying out of the works with all reasonable diligence; (b) where the engineer carries out such works upon such visit, the period referred to in that Section shall be deemed to expire when such works are completed; (c) except as provided in paragraph (b), the period referred to in that Section will be the period expiring at the end of the period provided for in the programme provided under paragraph (a)(ii), with any reasonable extensions necessitated by any failure of the Operator [ABC] to provide reasonable access and co-operation to National Grid Gas in the carrying out of the required works. 1.3 The pre-heating equipment specified on the diagram in Annex B will be set to indicate a temperature of gas made available for offtake of [ ] degrees Celsius [( ) oC.]

Appears in 1 contract

Samples: Network Exit Agreement

AutoNDA by SimpleDocs

Plant and Equipment. 1.1 1.1. The plant and equipment installed at or near the Premises Supply Meter Point comprises the following: (i) the National Grid Gas Minimum Offtake Grid’s Facilities: [ ]mm valve and associated monitoring and control equipment installed at or immediately upstream of the Premises Supply Meter Point; (ii) the Operator Offtake [ABC]’s Facilities: plant and equipment installed and owned by the Operator [ABC] for purposes connected with the offtake of gas from the National Transmission System and including filters [pre-heaters], [regulators,] , measurement [and telemetry] telemetry equipment and all associated pipework and equipment installed at or immediately downstream of the Premises Supply Meter Point. as described in more detail in Annex B.Schedule 2. 1.2 1.2. For the purposes of determining the period referred to in UNC TPD Section J4.4.5(b)(ii) (and without prejudice to Clause 7.18.1), where National Grid Gas has been notified of a requirement for maintenance of or failure or defect in the National Grid Gas Minimum Offtake Grid’s Facilities: (a) National Grid Gas will: (i) arrange for an engineer to attend at the National Grid Gas Minimum Offtake Grid’s Facilities within six (6) hours after National Grid Gas being so notified for the purposes of assessing the maintenance, repair or replacement works required; and (ii) unless such works can be carried out by the engineer upon such visit, prepare and submit to the Operator [ABC] and Relevant Shipper(sRegistered User(s) a programme for the carrying out of the works with all reasonable diligence; (b) where the engineer carries out such works upon such visit, the period referred to in that Section shall be deemed to expire when such works are completed; (c) except as provided in paragraph (b), the period referred to in that Section will be the period expiring at the end of the period provided for in the programme provided under paragraph (a)(ii), with any reasonable extensions necessitated by any failure of the Operator [ABC] to provide reasonable access and co-operation to National Grid Gas in the carrying out of the required works. 1.3 The pre-heating equipment specified on the diagram in Annex B will be set to indicate a temperature of gas made available for offtake of [ ] degrees Celsius [( ) oC.]

Appears in 1 contract

Samples: Network Exit Agreement