POST-ACCEPTANCE PHASE. QESP shall be responsible for successful performance of commissioning activities by the CxA during the post-acceptance phase, including: • Scheduling and verification of deferred functional testing, as necessary, based on seasonal conditions required to evaluate certain systems. When functional testing has been deferred, acceptance of the project is conditional upon the success of the scheduled tests; and • Scheduling and performance of a warranty walk-though to identify any problems with Equipment during warranty periods. SCHEDULE U STANDARDS OF COMFORT This Schedule U sets forth the acceptable standards of comfort that the QESP shall maintain for heating, cooling, lighting levels, hot water temperatures, humidity levels, and/or any special conditions for occupied and unoccupied areas in each building in the Project Site(s). The agreed upon standards shall be detailed in a format similar to the table below and include the types of information delineated below for each building. QESP shall insert rows, to specify lighting levels, hot water temperature levels, humidity levels, and other conditions, as required. Standards of Comfort Table Building (include street address) Room label (in the absence of room numbers, provide a labeled floor plan that corresponds with the standards of comfort list) Room description (describe the fundamental use of the space at the time of the study) # of occupants (the range of people in the space when it is to be considered occupied) Times when space is occupied Acceptable heating season temperature range (generally a 3 to 4 degree range) Location measured (where in the space is the measurement taken, including height from the floor) Acceptable heating season relative humidity (where in the space is the measurement taken, including height from the floor) Acceptable cooling season temperature range (generally a 3 to 4 degree range) Location measured (where in the space is the measurement taken, including height from the floor) Acceptable cooling season relative humidity (where in the space is the measurement taken, including height from the floor) Specific times that comfort standards shall be maintained (define hours that the space conditions are required, e.g., 6:30 a.m. until 6:00 p.m. daily Mon - Friday) Other (e.g., lighting levels) Other Planned abnormal facility use (should include holidays, maintenance uses, planned shutdowns or facility off times, summer vacations for some educational facilities, etc) Times when space is unoccupied Acceptable heating season temperature range (generally a 3 to 4 degree range but setback from occupied setting) Location measured (where in the space is the measurement taken, including height from the floor) Acceptable heating season relative humidity (where in the space is the measurement taken, including height from the floor) Acceptable cooling season temperature range (generally a 3 to 4 degree range but setback from occupied setting) Location measured (where in the space is the measurement taken, including height from the floor) Acceptable cooling season relative humidity (where in the space is the measurement taken, including height from the floor) Time from and until comfort standards shall be maintained (describe the times with unoccupied settings are acceptable) Other SCHEDULE V QESP'S TRAINING RESPONSIBILITIES
Appears in 10 contracts
Samples: Financing Agreement and Payment, Financing Agreement and Payment, Financing Agreement and Payment